CC-016 · Air · Port & power emissions
Shore-to-ship: 90% less harbour pollution
Misleading Moderate confidence Draft: right of reply pending
Parts of this claim
The claim is split into parts that are tested separately, as in the report below. Each part has its own number.
- CC-016A Shore power cuts a connected ship’s emissions at berth by about 90%True for NOx, PM and SOx per connected liner (NO2 −93%, PM −92.6%, SO2 −99.6%) [10, 11]; CO2 falls only about 40%; consistent with research [7, 9]. Infrastructure Malta’s own study is not public.
- CC-016B The project slashes 90% of air pollution in the Grand HarbourAt most about 9% of at-berth cruise emissions in year one; other sources and manoeuvring untouched; no harbour measurement.
- CC-016C 17,000 families benefit from cleaner airBasis of the figure not found; any benefit scales with use.
- CC-016D EUR 33 million; 17 points; five liners at once17 points and five liners consistent [1–3]. Cost figures vary by phase and date: EUR 49.9m for the whole project and EUR 37m for phase 1 (2020) [10, 11]; EUR 33m at the 2024 launch [2].
Claim Check 016 · Air quality
Does shore power cut harbour pollution by 90%?
Testing a public claim about the Grand Harbour shore-to-ship project against connection records, EU law and research
“This initiative promises to slash 90% of air pollution in the Grand Harbour.”
Infrastructure Malta, Shore-to-Ship project page, 1 December 2023.
Repeated at the inauguration, 10 July 2024.
Verdict: Misleading A design potential presented as a result; ships plugged in 9% of the time
Version 1.2 · 5 October 2026
TL;DR
Infrastructure Malta’s project page for the Grand Harbour shore-to-ship system says the initiative “promises to slash 90% of air pollution in the Grand Harbour”. At the July 2024 inauguration the government said its completion meant a 90% cut and cleaner air for 17,000 families. We tested the figure against how the system is actually used, the law that governs it, and peer-reviewed research on cruise emissions in port.
- Shore power works for a ship that plugs in. Infrastructure Malta’s own figures, published since 2020, are for a liner that switches off its auxiliary engines: 93% less nitrogen dioxide, 92.6% less particulate matter, 99.6% less sulphur dioxide (39.6% less CO2). Its earlier pages gave the 90% as a cut in the pollution ships produce; the 2023 page dropped that scope.
- But plugging in is voluntary until 2030. EU law (FuelEU Maritime, Art. 6) only makes connection compulsory from 1 January 2030. Transport Malta says connecting “remains the prerogative of the shipping line”. Neither the project page nor the launch said so.
- In its first year, ships plugged in for 9% of their time at berth. Records obtained by Amphora Media from Transport Malta show 67 connections in 373 berths, July 2024 to July 2025; 306 were not plugged in. One LNG-powered ship made 35 of the 67; other ships plugged in at one berth in ten.
- Cruise traffic grew. Calls rose 8%, from 357 in 2024 to 385 in 2025, about as much as the 9% of berth time plugged in from July 2024 to July 2025, so extra traffic may offset much of the first-year saving. The periods differ, and shore power was available from July 2024. No air-quality study has measured the effect in the harbour.
- Verdict: misleading (moderate confidence). The 90% holds per connected ship on Infrastructure Malta’s own figures, but the 2023 page presented it as a cut in Grand Harbour air pollution and the launch as a result of completing the project. That omits the voluntary connection and actual use, which the evidence puts nearer a tenth of the claim.
- Supported
- Largely supported
- Not substantiated
- Misleading
- Contradicted
What would move the verdict up
Connection logs showing most berth time is now plugged in, or a measured fall in harbour NO2 and particulates of the claimed size, controlled for traffic and weather.
What would move it down
Evidence that the 2024–25 uptake figures overstate use.
IN THIS REPORT
1 The claim and what we could verify
The claim is on Infrastructure Malta’s project page, published on 1 December 2023 when the first ships were connected in a trial [1]. It was repeated at the inauguration on 10 July 2024, reported by TVM, the public broadcaster [2], and by MaltaToday [3]. The project page was read in full; the press conference is known through reported speech.
| What was said | Who | Access |
|---|---|---|
| “This initiative promises to slash 90% of air pollution in the Grand Harbour.” | Infrastructure Malta [1] | Read in full |
| Completion “means a drastic reduction of 90% of the pollution generated by ships entering the Grand Harbour” | Press conference, as reported [2] | Reported speech |
| 17,000 families around the harbour “will directly benefit” from cleaner air | Prime Minister, as reported [2] | Reported speech |
| 90% when five liners use the system at once | Press conference, as reported [3] | Summary read |
Earlier wording. Infrastructure Malta’s pages on the project from 2020 to 2023 gave the figure a narrower scope. On 30 November 2020 it said the project “will cut over 90% of the air pollution that cruise liners and Ro-Ro ships produce when visiting Malta’s principal port”, and that by switching off their auxiliary engines cruise liners would emit 93% less nitrogen dioxide, 92.6% less particulate matter, 99.6% less sulphur dioxide and 39.6% less carbon dioxide [10]. A page of 19 February 2022 repeats these figures [11]. The 2023 project page dropped the scope: “90% of air pollution in the Grand Harbour”.
2 Method
Question. Has, or will, the shore-to-ship project cut Grand Harbour air pollution by 90%?
Evidence. The project page, earlier Infrastructure Malta pages and launch reports [1–3, 10, 11]; connection records for July 2024 to July 2025 obtained by Amphora Media from Transport Malta under freedom of information [4] (second-hand: the reply is not public); Valletta Cruise Port’s traffic figures [5]; Regulation (EU) 2023/1805 [6]; peer-reviewed studies found through Crossref and OpenAlex [7–9]; MSC Cruises’ description of its ship [12]. Numbers are recomputed by tools/cc-016-report/calc.py from data/cc-016/.
Grades. Peer-reviewed observational studies are grade B; official records and reviews grade C. ◆ marks data known second-hand. Verdicts follow the five-point scale in Appendix A.
3 What the research says
Infrastructure Malta’s own figures are the basis of the 90%: a cruise liner that switches off its auxiliary engines at the quay emits 93% less nitrogen dioxide, 92.6% less particulate matter and 99.6% less sulphur dioxide, and 39.6% less carbon dioxide [10, 11]. The study behind these percentages is not cited. They apply to a ship that connects. Research is consistent with a large cut per ship: a bottom-up inventory of 164 cruise calls at Istanbul’s Galataport in 2024 found that hotelling, the time at berth with auxiliary engines running, produced more than 90% of the ships’ CO2 in port and most of their NOx and SOx [7]. Emissions do not disappear: they move to the power station supplying the grid.
Shore power does nothing for manoeuvring. A sensor network in the Bay of Kotor found particulate spikes when cruise ships arrived and departed [8], and a 2025 review lists cost, ship retrofits and voluntary use among the barriers to adoption [9]. Pollution in the harbour also comes from ferries, tugs, other ships, road traffic and the power station; the claim speaks of all air pollution in the Grand Harbour.
The ship that plugged in most often, MSC World Europa (Section 4), is powered by liquefied natural gas. Its owner describes it as “the world’s largest LNG-powered cruise ship”, with five dual-fuel engines that run on LNG or on low-sulphur marine gasoil, and says LNG “nearly eliminates” sulphur oxides and fine particles compared with standard marine fuels [12]. If it runs on LNG at the quay, plugging it in saves less sulphur dioxide and particulate matter than Infrastructure Malta’s per-liner figures suggest. Which fuel it burned at berth in Valletta is not known.
4 How the system is used
![Figure 1. Left: the 373 cruise berths from July 2024 to July 2025; 67 plugged in, 35 of them by MSC World Europa, and 306 did not. Right: the 90% holds for a connected liner on Infrastructure Malta’s figures [10], but in the first year ships were plugged in for 9% of berth time, which caps the harbo](/Mizien/claim-files/CC-016/report-figures/fig-1.png)
![Figure 2. Left: the promised cut against the share of berths and of berth time plugged in during the first year. Right: plug-in rate by length of stay. Data ◆ [4].](/Mizien/claim-files/CC-016/report-figures/fig-2.png)
![Figure 3. Cruise calls at Valletta Cruise Port [5]; 2019–2023 as quoted in [4]. Infrastructure Malta, citing the NSO, also gives 372 cruise liners for 2019 [10].](/Mizien/claim-files/CC-016/report-figures/fig-3.png)
| Indicator | Value | Source | Grade |
|---|---|---|---|
| Berths plugged in, Jul 2024–Jul 2025 | 67 of 373 (18%) | Transport Malta FOI ◆ [4] | C |
| Share of berth time plugged in | 9% | Amphora Media analysis ◆ [4] | C |
| Connections by MSC World Europa | 35 of 67 (52%) | Transport Malta FOI ◆ [4] | C |
| Plug-in rate: MSC World Europa; all other ships | 35 of 51 (69%); 32 of 322 (10%) | Calculated from [4] ◆ | C |
| Carnival Corporation calls plugged in | 6 of 58 | Transport Malta FOI ◆ [4] | C |
| Stays of 2–4 days plugged in | 0% | Amphora Media analysis ◆ [4] | C |
| Cruise calls 2024 → 2025 | 357 → 385 (+8%) | Valletta Cruise Port [5] | C |
| Connection compulsory from | 1 Jan 2030 | Reg. (EU) 2023/1805 Art. 6 [6] | C |
All values in data/cc-016/checks.csv. Transport Malta said Carnival’s connections were for testing and certification, after which its ships “will be able to use the system routinely” [4].
5 Where the evidence points different ways
Q1 Is 90% the right number for a connected ship?
LARGELY, FOR NOx, PM, SOxEVIDENCE FOR THE CLAIM'S IMPRESSION
Infrastructure Malta’s figures for a liner on shore power: 93% less NO2, 92.6% less particulate matter, 99.6% less SO2 [10, 11]. Hotelling dominates cruise emissions in port [7], so a large cut per ship is consistent with the research.
EVIDENCE AGAINST
These are Infrastructure Malta’s estimates; the study behind them is not cited. They apply to ships that connect, not to all harbour pollution; CO2 falls 39.6%; manoeuvring emissions remain [8]. For an LNG-fuelled ship the sulphur and particulate saving is smaller [12].
Q2 Did completion of the project deliver 90%?
NOEVIDENCE FOR THE CLAIM'S IMPRESSION
Use is rising: one large ship (MSC World Europa) plugged in at 35 of its 51 calls, and Carnival ships were certifying in 2025 [4].
EVIDENCE AGAINST
Ships were plugged in for 9% of berth time in the first year; with 100% removal while plugged in, the cut in at-berth cruise emissions could be at most about 9%. Calls rose 8% in 2025.
Q3 Will it reach 90%?
NOT BEFORE 2030EVIDENCE FOR THE CLAIM'S IMPRESSION
From 2030 EU law requires passenger ships at berth in core ports to connect [6], which could bring use close to the design potential.
EVIDENCE AGAINST
Until then connection is the shipping line’s choice; the law has exemptions (for example grid stability).
6 Testing the claim
| Sub-claim | What the evidence shows | Rating |
|---|---|---|
| A. Shore power cuts a connected ship’s emissions at berth by about 90% | True for NOx, PM and SOx per connected liner (NO2 −93%, PM −92.6%, SO2 −99.6%) [10, 11]; CO2 falls only about 40%; consistent with research [7, 9]. Infrastructure Malta’s own study is not public. | LARGELY SUPPORTED |
| B. The project slashes 90% of air pollution in the Grand Harbour | At most about 9% of at-berth cruise emissions in year one; other sources and manoeuvring untouched; no harbour measurement. | NOT SHOWN |
| C. 17,000 families benefit from cleaner air | Basis of the figure not found; any benefit scales with use. | NOT SHOWN |
| D. EUR 33 million; 17 points; five liners at once | 17 points and five liners consistent [1–3]. Cost figures vary by phase and date: EUR 49.9m for the whole project and EUR 37m for phase 1 (2020) [10, 11]; EUR 33m at the 2024 launch [2]. | FIGURES VARY |
7 Verdict and requests for evidence
A design potential presented as a result; connection is voluntary until 2030 and first-year use was 9% of berth time. Confidence: moderate.
Why. (1) The 90% is Infrastructure Malta’s figure for ships that plug in; its earlier pages limited it to the pollution ships produce [10, 11]. (2) The 2023 project page presented it as a cut in Grand Harbour air pollution and the launch as a result of completing the project, neither saying that connection is voluntary until 2030 [1, 2, 6]. (3) Transport Malta’s own records, as reported, show ships plugged in for 9% of berth time in the first year [4], so the cut was roughly a tenth of the figure claimed. The connection points and capacity are as stated; the overall impression is not. Our scale calls this Misleading.
Confidence is moderate because the connection records are known through a news analysis, not the FOI reply itself, and no air-quality measurement exists either way.
Evidence we are asking for
- Transport Malta’s OPS connection log by call and hours, July 2024 to date.
- The study behind the per-pollutant cuts and the 17,000-family figure.
- The results of ERA’s Senglea shipping study (mobile station, until October 2024).
- The shore power agreements’ terms on use, which Transport Malta declined to release as commercial.
8 Limitations
- Connection figures are second-hand (Amphora Media’s analysis of a Transport Malta FOI reply) ◆.
- The 9% upper bound assumes zero local emissions while plugged in and the same mix of ships plugged and unplugged; larger ships plugging in could make the cut in tonnes somewhat larger.
- Uptake may have risen since July 2025; no later figures were found.
- The per-pollutant cuts are Infrastructure Malta’s own estimates; the study behind them was not found.
- Cruise calls are calendar years; the uptake figures cover July 2024 to July 2025.
- Emissions shifted to the power station and the interconnector were not estimated.
- Whether MSC World Europa burned LNG or marine gasoil while berthed in Valletta is not known; its fuel is described by its owner [12].
- The counts reconcile (312 + 38 + 23 = 373 berths; 61 + 6 = 67 connections), but Amphora Media’s 16.2% for stays of one to two days does not divide 38 exactly (6 of 38 is 15.8%).
- Peer-reviewed papers were read as abstracts.
References
- [1] Infrastructure Malta (1 Dec 2023). Shore-to-Ship. Project page. https://www.infrastructuremalta.com/projects/shore-ship
- [2] TVMnews (10 Jul 2024). Grand Harbour shore-to-ship project completed, to cut down emissions by 90%. https://tvmnews.mt/en/news/shore-to-ship-project-in-grand-harbour-completed-to-cut-down-emissions-by-90/
- [3] MaltaToday (10 Jul 2024). Grand Harbour’s shore-to-ship project launched. https://www.maltatoday.com.mt/news/national/130180/grand_harbours_shoretoship_project_launched
- [4] Demarco J. (17 Oct 2025). Cruise ships plugged in Grand Harbour onshore power supply only 9% of time in first year. Amphora Media. ◆ Transport Malta FOI data. https://www.amphora.media/2025/10/cruise-ships-shore-to-ship-power-malta
- [5] Valletta Cruise Port (2026). Valletta Cruise Port closes 2025 with strong growth and nearly one million passenger movements. https://www.vallettacruiseport.com/news-media/valletta-cruise-port-closes-2025-with-strong-growth-and-nearly-one-million-passenger-movements
- [6] Regulation (EU) 2023/1805 (FuelEU Maritime), Article 6. OJ L 234, 22.9.2023. https://eur-lex.europa.eu/eli/reg/2023/1805/oj
- [7] Mocerino L., Ergin S., Temren G. (2026). Emission inventory of cruise ship exhaust emissions at Istanbul Galataport (2024). Atmosphere 17(4):360. doi:10.3390/atmos17040360. (Abstract read.) https://doi.org/10.3390/atmos17040360
- [8] Gagić R., Škuric M., Djukanović G., Nikolić D. (2022). Establishing correlation between cruise ship activities and ambient PM concentrations in the Kotor Bay area. Atmosphere 13(11):1819. doi:10.3390/atmos13111819. (Abstract read.) https://doi.org/10.3390/atmos13111819
- [9] Rogošić M., Stanivuk T., Lucaci D. (2025). A study on the application of shore-side power as a method to reduce the emissions of greenhouse gases by cruise ships. J. Marine Science and Engineering 13(3):453. doi:10.3390/jmse13030453. (Abstract read.) https://doi.org/10.3390/jmse13030453
- [10] Infrastructure Malta (30 Nov 2020). Grand Harbour Clean Air Project gets underway. Read 5 Oct 2026. https://www.infrastructuremalta.com/news/grand-harbour-clean-air-project-gets-underway
- [11] Infrastructure Malta (19 Feb 2022). First Grand Harbour Clean Air Project frequency converters in place. Read 5 Oct 2026. https://www.infrastructuremalta.com/news/first-grand-harbour-clean-air-project-frequency-converters-place
- [12] MSC Cruises (24 Oct 2022). Sustainable cruising: the Cruise Division of MSC Group and Chantiers de l’Atlantique mark a major step forward with the delivery of MSC World Europa. Press release; also 12 Apr 2023 (Valletta in its itineraries). Read 5 Oct 2026. https://www.mscpressarea.com/en_US/press-releases/sustainable-cruising-the-cruise-division-of-msc-group-and-chantiers-de-l-atlantiq/
- [13] MiŻien. Data and calculations: data/cc-016/; tools/cc-016-report/calc.py.
Appendix A: series standards and verdict scale
Every investigation in this series follows the same rules so that verdicts are comparable and challengeable.
| Verdict | Meaning |
|---|---|
| SUPPORTED | Evidence consistently backs the claim as stated. |
| LARGELY SUPPORTED | Backed by the evidence, with minor caveats that do not change the substance. |
| NOT SUBSTANTIATED | Stated more strongly than the evidence offered or available allows. May be true in some conditions but has not been shown. |
| MISLEADING | Omits material facts so that the overall impression is inaccurate, even if individual statements are defensible. |
| CONTRADICTED | The available evidence points against the claim. |
Confidence
High: multiple independent lines of evidence agree. Moderate: evidence is relevant but incomplete or indirect. Low: evidence is thin, second-hand or conflicting.
Evidence grades
A experiment · B observational study with a control or gradient · C review, guidance or official statistics · D assertion or anecdote. ◆ marks a source known only second-hand.
Standards
- Quote the speaker, not the headline, with outlet and date, and link the original where possible.
- Separate the claim from the evidence offered for it, and say who made which statement.
- Grade the evidence and show differing views side by side where the evidence is unsettled.
- State what we could not access or verify, and what would change the verdict either way.
- Ask for the missing evidence in specific, answerable requests.
- Offer a right of reply where a check finds a claim Not substantiated, Misleading or Contradicted (or a pledge Not measurable, Off track or Missed), before wider circulation, and append responses.
- Correct errors openly with a version number and change log.
- Whistle-blow only on evidence: a verdict of Misleading or Contradicted requires documents or data that can be shown, not inference.
- Check every side. Government, opposition, NGOs and developers are held to the same standard.
Appendix B: revision log
| Version | Date | Change |
|---|---|---|
| 1.0 | 3 Oct 2026 | First issue. Right of reply to Infrastructure Malta and Transport Malta not yet sent. |
| 1.1 | 5 Oct 2026 | Corrections: (1) “No source gives the basis of the 90%” / “basis not published” → Infrastructure Malta’s 2020 and 2022 pages give it, scoped to the pollution ships produce, with per-liner cuts (NO2 −93%, PM −92.6%, SO2 −99.6%, CO2 −39.6%) [10, 11]; the 2023 page dropped the scope (Section 1). (2) Section 3: the 90% inferred from hotelling’s share of CO2 [7] → Infrastructure Malta’s own per-pollutant figures, research kept as context. (3) Sub-claim D “Consistent” → “Figures vary”: EUR 33m (2024 launch), 37m (phase 1) and 49.9m (whole project); the TL;DR no longer attributes EUR 33m to the project page, which gives no cost. (4) TL;DR point 4 “extra calls roughly cancel the emissions saved” → states that calls are calendar years, uptake July–July and shore power was available from July 2024. (5) 2019 calls: also given by Infrastructure Malta citing the NSO. ‘What would move it down’: removed the clause saying no scoped wording was found. Verdict and confidence unchanged. |
| 1.2 | 5 Oct 2026 | Upgrade: (1) New Figure 1: the 373 berths split into 35 plugged in by MSC World Europa, 32 by all other ships and 306 not plugged in, beside the 90% per connected liner and the 9% of berth time plugged in (counts re-read in [4] and reconciled; second-hand); former Figures 1 and 2 renumbered 2 and 3. (2) MSC World Europa is LNG-powered (dual-fuel LNG / low-sulphur marine gasoil), from its owner’s release [12]: Section 3, Q1 and limitations. (3) Plug-in rates added: MSC World Europa 35 of 51 calls, all other ships 32 of 322. (4) TL;DR point 3, a tile (306 berths not plugged in), Q2 and flyer updated. Verdict and confidence unchanged. |
| 1.2 | 5 Oct 2026 | Maintainer decision (5 Oct 2026): sub-claim A rated Largely supported (was Plausible); its evidence text and the Q1 label updated to match. |
Sources and archived copies
-
Shore-to-Ship, Infrastructure Malta, 1 Dec 2023.
Original · fetched and fingerprinted 2026-10-03; no public snapshot yet
The claim, verbatim. Read in full 3 Oct 2026. -
Grand Harbour shore-to-ship project completed, to cut down emissions by 90%, TVMnews, 10 Jul 2024.
Original · Archived copy
Inauguration; reported speech (90%, 17,000 families, EUR 33m). -
Cruise Ships Plugged in Grand Harbour Onshore Power Supply Only 9% of Time in First Year, Amphora Media, 17 Oct 2025.
Original · Archived copy
67 of 373 berths connected Jul 2024-Jul 2025, from Transport Malta FOI records (second-hand). -
Grand Harbour Clean Air Project gets underway, Infrastructure Malta, 30 Nov 2020.
Original · fetched and fingerprinted 2026-10-10; no public snapshot yet
Basis of the 90%, read 5 Oct 2026: "will cut over 90% of the air pollution that cruise liners and Ro-Ro ships produce"; per liner on shore power NO2 -93%, PM -92.6%, SO2 -99.6%, CO2 -39.6%; EUR 49.9m (EUR 37m phase 1); NSO 372 cruise liners in 2019. -
First Grand Harbour Clean Air Project frequency converters in place, Infrastructure Malta, 19 Feb 2022.
Original · Archived copy
Read 5 Oct 2026. Repeats the scoped 90% ("cutting 90% of their air pollution"), EUR 49.9m and the per-liner cuts. -
Sustainable cruising: the Cruise Division of MSC Group and Chantiers de l'Atlantique mark a major step forward with the delivery of MSC World Europa, MSC Cruises, 24 Oct 2022.
Original · fetched and fingerprinted 2026-10-10; no public snapshot yet
Read 5 Oct 2026 (v1.2). Owner's description of the ship that made 35 of the 67 connections: "the world's largest LNG-powered cruise ship"; five Wärtsilä 14V 46DF dual-fuel engines that run on LNG or low-sulphur marine gasoil; LNG "nearly eliminates" SOx and fine particles vs standard marine fuels (company claim); shore power connectivity. MSC's release of 12 Apr 2023 lists Valletta among its 2023 ports. Fuel used at berth in Valletta not known.
Right of reply
The body concerned has not yet been asked to reply. Its response will be published here, beside the verdict.
Connections
How this claim relates to the others: who made it, the themes it shares with other claims, and the patterns it shows. A connection is a reason to read two checks side by side. It does not make either one right or wrong. How connections are found.
Who made it
Infrastructure Malta Robert Abela, Prime Minister for Office of the Prime Minister Ministry for Transport
Other claims by Infrastructure Malta 3
- CC-008 Flyovers and congestion (Not substantiated)
- CC-021 Malta-Gozo tunnel traffic (not yet checked)
- CC-056 Central Link: 'only 254 trees' (not yet checked)
Other claims by Robert Abela 6
- CC-012 Ta' Qali gravel and grass (Contradicted)
- CC-017 Land reclamation outside the Freeport (Not substantiated)
- CC-027 Power cuts: heat, not generation (not yet checked)
- CC-055 Manoel Island back to the public (Supported)
- CC-064 Grand Harbour regeneration (not yet checked)
- CC-068 Marsaskala marina shelved (not yet checked)
Other claims by Ministry for Transport 4
Linked directly 4
Claims that share a theme with this one. A theme is a cause, a mechanism, a target or a way of presenting figures that the editors have found in several claims; its strength says how close the link is.
Transport, air and climate Shared driver · Strong
Fleet growth links traffic claims, air quality and emissions. The climate report names transport and buildings as the lagging sectors.
Same pattern
Pattern tags name a recurring way a claim can mislead. They describe the statement, not the speaker.
Conditional-turned-unconditional
A statement with a stated condition is reported or repeated without it.
Two steps away 22
Not linked to this claim directly, but linked to a claim that is. These are found by following the links, not chosen by the editors, so they are looser: they show where one theme meets another.
- CC-001 Upper Barrakka concrete (Not substantiated)through Transport, air and climateCC-008Sealed soil and concrete
- CC-002 Comino tree compensation (Largely supported)through Transport, air and climateCC-008Sealed soil and concrete
- CC-004 'Strong progress' in waste separation (Not substantiated)through Transport, air and climateCC-003Selective-metric pattern or Transport, air and climateCC-007Selective-metric pattern or Transport, air and climateCC-008Waste and construction
- CC-010 Tree-planting counts (Largely supported)through Transport, air and climateCC-003Selective-metric pattern or Transport, air and climateCC-007Selective-metric pattern or Transport, air and climateCC-008Replanting as currency
- CC-011 Ten minutes' walk to green space (pledge: Not measurable)through Transport, air and climateCC-0032030 carbon target
- CC-012 Ta' Qali gravel and grass (Contradicted)through Transport, air and climateCC-008Sealed soil and concrete
- CC-017 Land reclamation outside the Freeport (Not substantiated)through Transport, air and climateCC-008Waste and construction
- CC-019 830,000 m2 of land lost in five years (Not substantiated)through Transport, air and climateCC-008Sealed soil and concrete
- CC-020 EP study: noise law not the cause (Largely supported)through Transport, air and climateCC-007Compliance-not-health pattern
- CC-025 Per-capita emissions down 44% since 2005 (Largely supported)through Transport, air and climateCC-0032030 carbon target
- CC-026 EU's largest rise in emissions (Largely supported)through Transport, air and climateCC-003Transport, air and climate
- CC-033 Delimara: 'much cleaner air' (not yet checked)through Transport, air and climateCC-007Compliance-not-health pattern
- CC-035 PM2.5 death rate down two-thirds (Largely supported)through Transport, air and climateCC-007Transport, air and climate
- CC-056 Central Link: 'only 254 trees' (not yet checked)through Transport, air and climateCC-008Replanting as currency
- CC-069 82 million bus trips (not yet checked)through Transport, air and climateCC-008Transport, air and climate
- CC-072 EUR 15m to take cars off the road (not yet checked)through Transport, air and climateCC-008Transport, air and climate
- CC-076 36 more vehicles a day (Supported)through Transport, air and climateCC-008Transport, air and climate
- CC-094 Commission: Malta to emit more in 2030 than in 2005 (Supported)through Transport, air and climateCC-0032030 carbon target
- CC-109 EU: transport is 48% of effort-sharing emissions (Largely supported)through Transport, air and climateCC-0032030 carbon target or Transport, air and climateCC-008Transport, air and climate
- CC-110 EU: 37.7% of new cars zero-emission (Supported)through Transport, air and climateCC-007Selective-metric pattern
- CC-114 PN: only EU state with rising emissions intensity (Misleading)through Transport, air and climateCC-003Selective-metric pattern
- CC-115 Chamber: congestion cost EUR 770m, 3.4% of GDP (Not substantiated)through Transport, air and climateCC-008Transport, air and climate
Three steps away 23
One step further again. At this distance a connection says more about how the themes fit together than about this claim.
- CC-013 Permits keep property prices in check (Largely supported)through Transport, air and climateCC-008Waste and constructionCC-017Planning, housing and land take
- CC-014 Fewer enforcement notices, fewer illegalities (Misleading)through Transport, air and climateCC-008Waste and constructionCC-017Planning, housing and land take
- CC-018 IMF 'confirms' MDA on housing (Largely supported)through Transport, air and climateCC-008Waste and constructionCC-017Planning, housing and land take
- CC-022 'Lowest electricity burden in the EU' (Largely supported)through Transport, air and climateCC-0032030 carbon targetCC-025Selective-metric pattern
- CC-024 Renewables target for 2030 (Not substantiated)through Transport, air and climateCC-0032030 carbon targetCC-0112030 carbon target
- CC-031 Gozo, first climate-neutral region (Largely supported)through Transport, air and climateCC-003Transport, air and climateCC-026Shared emissions figures
- CC-054 Project Green: 100,000 m2 a year (not yet checked)through Transport, air and climateCC-003Selective-metric patternCC-010Replanting as currency
- CC-057 1,649 compensation trees (not yet checked)through Transport, air and climateCC-003Selective-metric patternCC-010Replanting as currency
- CC-058 96% of farmland in use (not yet checked)through Transport, air and climateCC-008Sealed soil and concreteCC-019Planning, housing and land take
- CC-059 Subsidies are 20% of farm output (not yet checked)through Transport, air and climateCC-008Sealed soil and concreteCC-019Farmland and farming pressure
- CC-063 Construction waste: 'standstill' warning (Not substantiated)through Transport, air and climateCC-008Waste and constructionCC-017Waste and construction
- CC-071 EUR 100m a year for free buses (Not substantiated)through Transport, air and climateCC-008Transport, air and climateCC-069Transport, air and climate
- CC-075 Seventh in the EU for cars (Misleading)through Transport, air and climateCC-007Selective-metric patternCC-110Transport, air and climate
- CC-079 Waste-to-energy: 4.5% of energy (Misleading)through Transport, air and climateCC-003Selective-metric patternCC-004Waste and construction
- CC-081 Landfill share rising (not yet checked)through Transport, air and climateCC-003Selective-metric patternCC-004Waste and construction
- CC-104 PN: Malta fails EU noise law (not yet checked)through Transport, air and climateCC-007Compliance-not-health patternCC-020Noise governance
- CC-105 ADPD: no study of Freeport and airport noise (Largely supported)through Transport, air and climateCC-007Compliance-not-health patternCC-020Noise governance
- CC-111 EU: 621 kg of waste a head, 74% landfilled (Supported)through Transport, air and climateCC-003Selective-metric patternCC-004Waste and construction
- CC-117 EU: Malta missed recycling targets (reasoned opinion) (not yet checked)through Transport, air and climateCC-003Selective-metric patternCC-004Waste and construction
- CC-120 EP study: 54,000 exposed to road noise, likely an underestimate (Largely supported)through Transport, air and climateCC-007Compliance-not-health patternCC-020Noise governance
- CC-123 KPMG: 8,716 residential units approved in 2024, up 7.4% (not yet checked)through Transport, air and climateCC-008Sealed soil and concreteCC-019Planning, housing and land take
- CC-127 EU: Malta has the lowest organic share in the EU (not yet checked)through Transport, air and climateCC-008Sealed soil and concreteCC-019Farmland and farming pressure
- CC-130 NGOs: ODZ racecourse policy ends protection (not yet checked)through Transport, air and climateCC-008Sealed soil and concreteCC-019Farmland and farming pressure
Similar wording
Claims whose own words overlap with this one, with the words they share. Found by comparing the wording of the claims, not their verdicts; a lead to read them together, not a finding.
- CC-064 Grand Harbour regeneration (not yet checked)shares: harbour, grand
Timeline
What was said, what was published before and after it, and each step of this check, in date order. Statements and sources carry the date they were published. The steps of the check carry the date the research was done, from the check's research log. Other statements by the same body on the same topic show whether a position was repeated, changed or corrected.
2020
- 30 November 2020 Reported Grand Harbour Clean Air Project gets underway, Infrastructure Malta
2022
- 19 February 2022 Reported First Grand Harbour Clean Air Project frequency converters in place, Infrastructure Malta
- 24 October 2022 Statement published Sustainable cruising: the Cruise Division of MSC Group and Chantiers de l'Atlantique mark a major step forward with the delivery of MSC World Europa, MSC Cruises
2023
- 12 April 2023 Statement published MSC World Europa, the world's most environmentally high-performing cruise ship, starts sailing in the Mediterranean, MSC Cruises
- 22 September 2023 Evidence published Regulation (EU) 2023/1805 (FuelEU Maritime), Article 6, EUR-Lex
- 1 December 2023 The statement Infrastructure Malta; Prime Minister Robert Abela; Ministry for Transport (this claim)
2024
- 10 July 2024 Reported Grand Harbour's shore-to-ship project launched, MaltaToday
2025
- 17 October 2025 Reported Cruise Ships Plugged in Grand Harbour Onshore Power Supply Only 9% of Time in First Year, Amphora Media
2026
- January 2026 Evidence published Valletta Cruise Port closes 2025 with strong growth and nearly one million passenger movements, Valletta Cruise Port
- 2026 Evidence published Emission Inventory of Cruise Ship Exhaust Emissions at Istanbul Galataport (2024), Atmosphere 17(4):360
- 3 October 2026 Added to the claims to check
- 3 October 2026 Version 1.0: first issue First issue. Right of reply to Infrastructure Malta and Transport Malta not yet sent.
- 5 October 2026 Version 1.2 Upgrade: (1) New Figure 1: the 373 berths split into 35 plugged in by MSC World Europa, 32 by all other ships and 306 not plugged in, beside the 90% per connected liner and the 9% of berth time plugged in (counts re-read in [4] and reconciled; second-hand); former Figures 1 and 2 renumbered 2 and 3. (2) MSC World Europa is LNG-powered (dual-fuel LNG / low-sulphur marine gasoil), from its owner’s release [12]: Section 3, Q1 and limitations. (3) Plug-in rates added: MSC World Europa 35 of 51 calls, all other ships 32 of 322. (4) TL;DR point 3, a tile (306 berths not plugged in), Q2 and flyer updated. Verdict and confidence unchanged. Maintainer decision (5 Oct 2026): sub-claim A rated Largely supported (was Plausible); its evidence text and the Q1 label updated to match. Verdict in this version: Misleading, moderate confidence.
- 5 October 2026 Evidence reviewed
- 5 October 2026 Version 1.1: corrections Corrections: (1) “No source gives the basis of the 90%” / “basis not published” → Infrastructure Malta’s 2020 and 2022 pages give it, scoped to the pollution ships produce, with per-liner cuts (NO2 −93%, PM −92.6%, SO2 −99.6%, CO2 −39.6%) [10, 11]; the 2023 page dropped the scope (Section 1). (2) Section 3: the 90% inferred from hotelling’s share of CO2 [7] → Infrastructure Malta’s own per-pollutant figures, research kept as context. (3) Sub-claim D “Consistent” → “Figures vary”: EUR 33m (2024 launch), 37m (phase 1) and 49.9m (whole project); the TL;DR no longer attributes EUR 33m to the project page, which gives no cost. (4) TL;DR point 4 “extra calls roughly cancel the emissions saved” → states that calls are calendar years, uptake July–July and shore power was available from July 2024. (5) 2019 calls: also given by Infrastructure Malta citing the NSO. ‘What would move it down’: removed the clause saying no scoped wording was found. Verdict and confidence unchanged. all corrections
2027
- 5 October 2027 Coming up: Evidence review due Each finished check is reviewed against new evidence within a year.
Every change to this claim's record is public: history of the record.