CC-029 · Climate & Energy · Renewables
First offshore wind farm
Largely supported Moderate confidence Pledge: Off track as of 6 October 2026 Draft: right of reply pending
The pledge in this claim
Off track as of 6 October 2026
Off track: published progress is behind that path, and the target has not yet been shown to be met or missed.
Deadline not defined in the statement; read as the end of June 2026. No public notice found by 6 Oct 2026; a private notice cannot be excluded.
A pledge gets a label, not a verdict. The verdict above (Largely supported) is for the factual part of the claim.
- Target
- Qualifying candidates informed of the next phase by the first part of 2026
- Made by
- Ministry for the Environment
- Made in
- Energy Ministry statement on the first offshore wind concession (TVM News, 22 Jul 2025) (22 July 2025)
- Deadline
- none stated
All pledges and how they are labelled · See it on the pledges timeline
Parts of this claim
The claim is split into parts that are tested separately, as in the report below. Each part has its own number.
- CC-029A A first floating wind farm of about 300 MW, beyond territorial waters (Energy Ministry [1])ICM’s project page gives the same capacity, floating technology and position beyond 12 nautical miles [4].
- CC-029B Three submissions to the first stage (Energy Ministry [1])Three named applicants; announced 22 Jul 2025 by the ministry; same in Newsbook and trade media [1, 2, 9].
- CC-029C Output: around a quarter of 2025 demand (ICM) (ICM [6])0.8 TWh is 24.6% of 2025 electricity supplied and 26.9% of final consumption (Eurostat) [7].
- CC-029D Qualifying candidates informed “by the first part” of 2026 (Energy Ministry [1])No public notice found by 6 Oct 2026 (ICM posts since June 2025, tenders page); a metocean tender was issued in April 2026; a private notice cannot be excluded.
Claim Check 029 · Climate and energy
Malta’s first offshore wind farm: on schedule?
Testing the Energy Ministry’s capacity, bids and timetable against public records
“…located beyond Malta’s territorial waters… an installed capacity of approximately 300MW…” “…inform candidates who qualify… by the first part of next year.”
Energy Ministry statement, 22 July 2025 (as reported by TVM News).
Statement as reported; only Minister Dalli’s words are in quotation marks in the source.
Verdict: Largely supported Facts hold; the timetable is Off track (pledge)
Version 1.1 · 6 October 2026
TL;DR
On 22 July 2025 the Energy Ministry said Malta’s first floating wind farm, of “approximately 300MW”, would be built “beyond Malta’s territorial waters”, that three submissions had been received for the first stage, and that the plan was to inform qualifying candidates of the next phase “by the first part of next year”. We checked the facts against the project’s own documents and Eurostat data, and the timetable against what has been published since.
- The facts hold. InterConnect Malta (ICM), the government company running the process, describes a floating wind farm of around 300 MW beyond the 12-nautical-mile limit, in an area to be declared as Malta’s Exclusive Economic Zone. Three submissions were announced on 22 July 2025, from named applicants.
- The output claim is consistent with national data. ICM says the farm would give up to 0.8 TWh a year, about 25% of Malta’s electricity demand as it stood in 2025. That implies a 30% capacity factor and matches 25% of the 3,252 GWh Eurostat shows Malta supplied in 2025 (production plus imports); it is 27% of final consumption.
- No public sign of the step by the stated time. The “first part of 2026” step, telling qualifying candidates they may continue, has no public notice. ICM’s news list to 3 October 2026 and its tenders page record none. It did issue a EUR 3.6 million metocean survey tender in April 2026, to gather two years of site data for developers.
- What we cannot tell. The notice to candidates may have been sent privately, and the government may have revised the plan without publishing it. MaltaToday reported on 4 August 2025 that the minister, answering a parliamentary question, put the next stage (the invitation to dialogue) at around April 2026 and the contractor’s selection towards the end of 2027 [10]; we found no public notice of that stage either.
- Supported
- Largely supported
- Not substantiated
- Misleading
- Contradicted
What would move the verdict up
None for the facts. They rest on the project’s own documents and one national dataset; Supported would need an independent record of the final site and capacity, which will exist only after a concession is awarded.
What would move it down
A published notice, or a PQQ document, showing that qualifying candidates were informed in the first part of 2026 would move the label to On track or Met. A published revised timetable would reset the baseline. A final contract at a different capacity would change the factual rating.
1 The claim and what we could verify
The Energy Ministry announced the result of the first stage on 22 July 2025. TVM News published the ministry’s statement and a quotation from the Minister, Miriam Dalli [1]; Newsbook published the same announcement [2]. The maintainer supplied the passages (literature/CC-029/primary-source.md) and we re-read both pages in full. The ministry’s own page and ICM’s site carry the project description [3, 4]. Only the minister’s words inside quotation marks are quoted; the rest is the ministry statement as the outlet reports it.
| Source | What it says | Our access | Status |
|---|---|---|---|
| Energy Ministry statement, as reported by TVM News, 22 Jul 2025 [1] | The wind farm “will be located beyond Malta’s territorial waters”, in an area to be declared part of the EEZ, with “an installed capacity of approximately 300MW”; three submissions; the “current plan is to inform candidates who qualify for the next phase by the first part of next year” (TVM’s rendering of the statement). | Read in full, 6 Oct 2026. | The claim (statement as reported) |
| Minister Miriam Dalli [1, 2] | “What was once an exploratory initiative has now entered a structured phase” (TVM News [1]). Newsbook [2] reports him describing the announcement as “an important step forward for the project and a clear signal that the process has truly kicked off” (Newsbook’s wording; not quoted elsewhere). | Read in full; Newsbook text checked in an Internet Archive copy of 22 Jul 2025. | Quoted |
| InterConnect Malta, project page and news, 5 Dec 2024 to 22 Apr 2026 [3, 4, 5, 6] | Around 300 MW; 12 nautical miles or more offshore; up to 0.8 TWh a year; a three-step competitive dialogue (qualification questionnaire, invitation to dialogue, best and final offer); two sites; submissions deadline extended to 21 Jul 2025; a metocean tender of 22 Apr 2026. | Read in full, 6 Oct 2026. | Primary (government company) |
| Eurostat, nrg_cb_e [7] | Malta electricity production, imports, exports and final consumption, 2019 to 2025. | Downloaded 6 Oct 2026 (data/cc-029/). | Primary data |
| Trade and press reports [8, 9, 10] | Repeat the timetable; MaltaToday (4 Aug 2025, a parliamentary reply by the minister) says the dialogue stage was planned around April 2026 and the contractor’s selection towards the end of 2027. | Trade pages read; MaltaToday read through an Internet Archive copy of 4 Aug 2025 (the live page returns 403). | Context |
2 Method
Questions. (A) Is the project as described: a floating farm of about 300 MW beyond territorial waters? (B) Were there three first-stage submissions? (C) Is the stated output plausible against national demand? (D) Did the next stage happen when the plan said?
Evidence. For A and B we read the ministry statement and ICM’s own pages. For C we downloaded Malta’s electricity balance from Eurostat (nrg_cb_e, siec E7000, GWh) with fetch.py and computed the shares with calc.py (data/cc-029/checks.csv). The 2025 values carry the Eurostat provisional flag. For D we listed every post ICM published between 1 June 2025 and 6 October 2026 (22 posts, from its website’s public post list), read ICM’s tenders page, and searched the web for the project’s name; the search log is in literature/CC-029/notes.md.
The limit of D. Absence of a public notice is not proof that nothing happened: candidates can be told privately. It does show that no progress after the qualification stage has been published, which is what a pledge label judges.
Grades. Official statistics and government project documents are grade C; news and trade reports are grade D and are used to locate what was announced. Verdicts and pledge labels follow Appendix A.
3 What the evidence shows
The description. ICM’s project page says the concession covers design, construction, operation, maintenance and decommissioning of an offshore floating wind farm beyond Malta’s 12-nautical-mile territorial waters, with the substation and export cable owned by the government, “around 300MW” delivered to the 132 kV network, “up to 0.8 TWh” a year, under a 35-year agreement with a two-way contract for difference [4]. Two sites are on offer, one of which will be developed [4, 6].
The submissions. The first-stage questionnaire was issued on 5 December 2024 [5]. Its deadline, originally 28 March 2025 ◆, was extended by 115 days to 21 July 2025 after clarification requests [5a]. Three submissions followed: the Code Zero Consortium (led by SEP (Malta) Holding Ltd), Atlas Med Wind (managed by GreenIT SpA, Italy) and MCKEDRIK Sole Member Ltd (Greece) [1, 2]. ICM’s December 2024 notice said only the top five candidates would be invited to the next stage [5]; with three submissions, that limit is not a constraint.
![Figure 1. Public milestones of the first offshore wind concession against the timetable stated on 22 July 2025. Sources: ICM news, TVM News, offshoreWIND.biz [1, 5, 6, 9].](/Mizien/claim-files/CC-029/report-figures/fig-1.png)
The output. 0.8 TWh from 300 MW is a capacity factor of 30.4%, a plausible value for offshore wind. Eurostat gives Malta’s 2025 final electricity consumption as 2,970 GWh and electricity supplied (production plus imports minus exports) as 3,252 GWh, 31.7% of it imported by cable [7]. 0.8 TWh is 26.9% of consumption and 24.6% of supply, so ICM’s “25% of overall demand as it stood in 2025” [6] matches the supply measure.

The timetable. The 22 July 2025 statement set the plan: tell qualifying candidates “by the first part of next year”, while ICM prepared technical and financial criteria for them [1]. By 6 October 2026, 98 days after the end of June, the end of what we read as “the first part” of 2026, none of ICM’s 22 posts since June 2025, nor its tenders page, records a notice of qualification or of the invitation to dialogue. What ICM did publish, on 22 April 2026, was a EUR 3.6 million tender for two years of metocean measurements at both sites (deadline 21 May 2026), said to let “prospective developers” prepare proposals [6, 9]. That is progress on the project, but it is not the step the plan named.
4 Where the evidence points different ways
Has the next stage kept to the stated timetable?
NO PUBLIC SIGNEVIDENCE OF PROGRESS
The project is active: ICM issued the metocean tender in April 2026 and still describes the competitive dialogue structure; the ministry’s plan was a statement of intent, and evaluation of three bulky submissions was said to be thorough [1, 6].
EVIDENCE OF DELAY
No public notice of qualification or of the dialogue stage by 6 October 2026, three months after the end of the “first part” of the year. The metocean tender comes with two years of data collection. The minister’s reply reported on 4 August 2025 also put the dialogue stage around April 2026 [10]; no notice of it was found either.
5 Testing the claim
| Sub-claim | Said by | What the evidence shows | Rating |
|---|---|---|---|
| A. A first floating wind farm of about 300 MW, beyond territorial waters | Energy Ministry [1] | ICM’s project page gives the same capacity, floating technology and position beyond 12 nautical miles [4]. | ACCURATE |
| B. Three submissions to the first stage | Energy Ministry [1] | Three named applicants; announced 22 Jul 2025 by the ministry; same in Newsbook and trade media [1, 2, 9]. | ACCURATE |
| C. Output: around a quarter of 2025 demand (ICM) | ICM [6] | 0.8 TWh is 24.6% of 2025 electricity supplied and 26.9% of final consumption (Eurostat) [7]. | CONSISTENT |
| D. Qualifying candidates informed “by the first part” of 2026 | Energy Ministry [1] | No public notice found by 6 Oct 2026 (ICM posts since June 2025, tenders page); a metocean tender was issued in April 2026; a private notice cannot be excluded. | OFF TRACK (PLEDGE) |
6 Verdict, pledge and requests for evidence
The project, its size and the three submissions are as stated; the timetable is rated as a pledge: Off track. Confidence: moderate.
Why. (1) The factual statements, capacity, position and number of submissions, are confirmed by the government’s own project documents and the announcement. (2) The output figure agrees with Eurostat data. (3) We rate Largely supported rather than Supported because the project is a plan, no concession has been awarded, and the capacity and site may change in the dialogue. (4) The timetable is a plan, not a fact, so it is rated under the pledge scale. Confidence is moderate because the sources are the project’s own documents and the timetable rating depends on absence of a notice.
Evidence we are asking for
- The date candidates were informed of the result of the qualification stage, and how many qualified.
- A current timetable for the invitation to participate in dialogue and the best and final offer.
- The e-tenders notice and documents for the metocean survey, and the award, if made.
- The offshore wind assumption (capacity and year) in Malta’s National Energy and Climate Plan, for comparison with 300 MW.
7 Limitations
- The ministry’s statement is read through TVM News and Newsbook; the ministry’s own release was refused to scripts. Only the minister’s words are in quotation marks.
- We read no tender documents. Capacity, position and output come from ICM’s web pages; the e-tenders portal was not read.
- The Off track label rests on the absence of a public notice, which is weaker evidence than a dated statement. Our reading of “the first part of 2026” as ending on 30 June 2026 is ours; the statement gives no date.
- “The first part of 2026” is not defined in the statement. Reading it more loosely than 30 June 2026 would shorten the gap but not remove it, and the minister’s reply of 4 August 2025 [10] placed the dialogue stage around April 2026.
- Eurostat 2025 values are provisional. ICM’s 25% is compared with supply and consumption as defined by Eurostat; ICM does not say which measure it used.
- MaltaToday’s report [10] was read through an Internet Archive copy of 4 August 2025; the live page was not readable and we did not check whether it has since been edited (its headline and its address differ: “start of 2028” and “end 2027”).
- The absence of a notice rests on ICM’s public post list and tenders page, the ministry’s release (not readable by scripts) and web searches; a notice on a page we did not read cannot be excluded.
References
- [1] TVM News (22 Jul 2025). Three submissions presented for the first offshore wind farm concession in Malta. https://tvmnews.mt/en/news/three-submissions-presented-for-the-first-offshore-wind-farm-concession-in-malta/
- [2] Balzan J. (22 Jul 2025, 17:58). Three firms bid for Malta’s first offshore wind farm concession. Newsbook. https://newsbook.com.mt/en/three-firms-bid-for-maltas-first-offshore-wind-farm-concession/
- [3] InterConnect Malta. News and events list (read 6 Oct 2026). https://icm.mt/news-events/
- [4] InterConnect Malta. Offshore Renewable Energy Project (read 6 Oct 2026). https://icm.mt/projects/offshore-renewable-energy-project/
- [5] InterConnect Malta (5 Dec 2024). Malta launches preliminary qualification questionnaire for offshore floating wind farm project; and (27 Mar 2025) submission deadline extended [5a]. https://icm.mt/malta-launches-preliminary-qualification-questionnaire-for-offshore-floating-wind-farm-project/
- [6] InterConnect Malta (22 Apr 2026). Offshore floating wind farm: ICM issues tender to collect data on wind, wave conditions. https://icm.mt/offshore-floating-wind-farm-icm-issues-tender-to-collect-data-on-wind-wave-conditions/
- [7] Eurostat. Supply, transformation and consumption of electricity (nrg_cb_e), Malta, retrieved 6 Oct 2026. https://ec.europa.eu/eurostat/databrowser/view/nrg_cb_e/default/table
- [8] offshoreWIND.biz (23 Jul 2025). Three applications submitted in Malta’s first offshore wind tender. https://www.offshorewind.biz/2025/07/23/three-applications-submitted-in-maltas-first-offshore-wind-tender
- [9] offshoreWIND.biz (21 Apr 2026). Malta opens EUR 3.6 million offshore wind metocean survey tender. https://www.offshorewind.biz/2026/04/21/malta-opens-eur-3-6-million-offshore-wind-metocean-survey-tender
- [10] Azzopardi K. (4 Aug 2025). Miriam Dalli: Offshore wind farm contractor to be selected by start of 2028 (title as archived; the address ends “end_2027” and the body says selection “towards the end of 2027”). MaltaToday. Read through the Internet Archive copy of 4 Aug 2025; the live page returns 403. https://web.archive.org/web/20250804160719/https://www.maltatoday.com.mt/news/national/136333/miriam_dalli_offshore_wind_farm_contractor_to_be_selected_by_end_2027
- [11] Miżien. Calculation script and outputs: tools/cc-029-report/calc.py; data/cc-029/checks.csv.
Appendix A: series standards and verdict scale
Every investigation in this series follows the same rules so that verdicts are comparable and challengeable.
| Verdict | Meaning |
|---|---|
| SUPPORTED | Evidence consistently backs the claim as stated. |
| LARGELY SUPPORTED | Backed by the evidence, with minor caveats that do not change the substance. |
| NOT SUBSTANTIATED | Stated more strongly than the evidence offered or available allows. May be true in some conditions but has not been shown. |
| MISLEADING | Omits material facts so that the overall impression is inaccurate, even if individual statements are defensible. |
| CONTRADICTED | The available evidence points against the claim. |
Pledge labels
A pledge is a promise of future action, so it cannot be true or false when it is made. It gets one of these labels instead of a verdict, with the date of the evidence behind it.
| Pledge label | Meaning |
|---|---|
| NOT MEASURABLE | The pledge as worded has no definition, baseline or date against which delivery could be checked. |
| NOT YET DUE | Measurable; the deadline or term has not passed and no progress data have been published yet. |
| ON TRACK | Published progress is at or ahead of a straight-line path (or the pledge's own milestones) to the target by the deadline. |
| OFF TRACK | Published progress is behind that path, and the target has not yet been shown to be met or missed. |
| MET | Documents or data show the target was reached, by the deadline if one was set. |
| MISSED | The deadline or term has passed, and documents or data that can be shown say the target was not reached. |
Confidence
High: multiple independent lines of evidence agree. Moderate: evidence is relevant but incomplete or indirect. Low: evidence is thin, second-hand or conflicting.
Evidence grades
A experiment · B observational study with a control or gradient · C review, guidance or official statistics · D assertion or anecdote. ◆ marks a source known only second-hand.
Standards
- Quote the speaker, not the headline, with outlet and date, and link the original where possible.
- Separate the claim from the evidence offered for it, and say who made which statement.
- Grade the evidence and show differing views side by side where the evidence is unsettled.
- State what we could not access or verify, and what would change the verdict either way.
- Ask for the missing evidence in specific, answerable requests.
- Offer a right of reply where a check finds a claim Not substantiated, Misleading or Contradicted (or a pledge Not measurable, Off track or Missed), before wider circulation, and append responses.
- Correct errors openly with a version number and change log.
- Whistle-blow only on evidence: a verdict of Misleading or Contradicted requires documents or data that can be shown, not inference.
- Check every side. Government, opposition, NGOs and developers are held to the same standard.
Appendix B: revision log
| Version | Date | Change |
|---|---|---|
| 1.0 | 6 Oct 2026 | First issue. Verdict Largely supported (moderate confidence); pledge label Off track; pending right of reply. |
| 1.1 | 6 Oct 2026 | Corrections after audit: MaltaToday report now read (Internet Archive copy) and cited with its exact title; ICM post list checked back to June 2025 (22 posts) and the absence statement limited to what was searched; TL;DR wording softened; Newsbook quotation checked and attributed to Newsbook; flyer inference removed. Verdict and label unchanged; pending right of reply. |
Sources and archived copies
-
Three Applications Submitted in Malta's First Offshore Wind Tender, offshoreWIND.biz, 23 Jul 2025.
Original · fetched and fingerprinted 2026-10-10; no public snapshot yet
Trade report of the three submissions (23 Jul 2025); page text only, read in part. Locates the timeline; not used as evidence of the ministry's wording. -
Three submissions presented for the first offshore wind farm concession in Malta, TVM News, 22 Jul 2025.
Original · fetched and fingerprinted 2026-10-10; no public snapshot yet
Energy Ministry statement (about 300 MW, beyond territorial waters) and a direct quote from Minister Dalli. Read 5 Oct 2026. -
Three firms bid for Malta's first offshore wind farm concession, Newsbook, 22 Jul 2025.
Original · fetched and fingerprinted 2026-10-10; no public snapshot yet
Next stage to qualifying candidates "by early next year" (Newsbook's wording). Newsbook (Jurgen Balzan, 22 Jul 2025, 17:58) reports Dalli describing the announcement as "an important step forward for the project and a clear signal that the process has truly kicked off" (Newsbook's text; TVM paraphrases it without quotation marks). Text checked in the Internet Archive copy of 22 Jul 2025, 6 Oct 2026. -
Offshore Renewable Energy Project, InterConnect Malta, read 6 Oct 2026.
Original · fetched and fingerprinted 2026-10-10; no public snapshot yet
Project description: about 300 MW, beyond 12 nautical miles, up to 0.8 TWh a year, competitive dialogue. -
Offshore floating wind farm: ICM issues tender to collect data on wind, wave conditions, InterConnect Malta, 22 Apr 2026.
Original · fetched and fingerprinted 2026-10-10; no public snapshot yet
EUR 3.6 million metocean tender; about 25% of 2025 demand. -
Supply, transformation and consumption of electricity (nrg_cb_e), Malta, Eurostat, retrieved 6 Oct 2026.
Original · fetched and fingerprinted 2026-10-10; no public snapshot yet
Scale check only (Malta electricity supplied and final consumption, 2025 provisional); it does not test ICM's output figure or the project.
Right of reply
The body concerned has not yet been asked to reply. Its response will be published here, beside the verdict.
Connections
How this claim relates to the others: who made it, the themes it shares with other claims, and the patterns it shows. A connection is a reason to read two checks side by side. It does not make either one right or wrong. How connections are found.
Who made it
Ministry for the Environment Interconnect Malta
Other claims by Ministry for the Environment 7
- CC-003 Per-capita emissions vs 2030 projection (Misleading)
- CC-004 'Strong progress' in waste separation (Not substantiated)
- CC-010 Tree-planting counts (Largely supported)
- CC-022 'Lowest electricity burden in the EU' (Largely supported)
- CC-027 Power cuts: heat, not generation (not yet checked)
- CC-048 Sea urchins recovering (not yet checked)
- CC-051 'Over 30% of our seas protected' (Misleading)
Other claims by Interconnect Malta 1
Linked directly 3
Claims that share a theme with this one. A theme is a cause, a mechanism, a target or a way of presenting figures that the editors have found in several claims; its strength says how close the link is.
Renewables delivery Shared target · Weak (indicative)
Claims about how much of Malta's energy is renewable and when more will arrive: the 2030 renewables target (CC-024), the first offshore wind farm (CC-029) and the Council's July 2026 statement that the share is 17.2% and almost all solar (CC-119). Indicative until a report tests the figures against Eurostat generation data.
Same pattern
Pattern tags name a recurring way a claim can mislead. They describe the statement, not the speaker.
Promise-without-baseline
A target or pledge with no stated starting point, scope or counting basis.
- CC-008 Flyovers and congestion (Not substantiated)
- CC-010 Tree-planting counts (Largely supported)
- CC-011 Ten minutes' walk to green space (pledge: Not measurable)
- CC-012 Ta' Qali gravel and grass (Contradicted)
- CC-017 Land reclamation outside the Freeport (Not substantiated)
- CC-021 Malta-Gozo tunnel traffic (not yet checked)
- CC-030 Carbon-neutral airport (Not substantiated)
- CC-031 Gozo, first climate-neutral region (Largely supported)
- CC-039 Net Zero Impact Utility (pledge: Not measurable)
- CC-055 Manoel Island back to the public (Supported)
- CC-079 Waste-to-energy: 4.5% of energy (Misleading)
- CC-092 PN: afforestation in a net-zero Gozo (pledge: Not measurable)
- CC-107 A net-zero Gozo by 2040 (pledge: Not measurable)
- CC-108 Net-zero impact on the groundwater environment (pledge: Not measurable)
- CC-125 EU: Malta Social Climate Plan EUR 60.6 million (not yet checked)
Two steps away 4
Not linked to this claim directly, but linked to a claim that is. These are found by following the links, not chosen by the editors, so they are looser: they show where one theme meets another.
- CC-011 Ten minutes' walk to green space (pledge: Not measurable)through Renewables deliveryCC-0242030 carbon target
- CC-022 'Lowest electricity burden in the EU' (Largely supported)through Renewables deliveryCC-124Energy subsidies
- CC-095 EUR 400m to keep bills low (Not substantiated)through Renewables deliveryCC-124Energy subsidies
- CC-113 EEA: Malta among highest fossil-fuel subsidies relative to GDP (Largely supported)through Renewables deliveryCC-124Energy subsidies
Three steps away 3
One step further again. At this distance a connection says more about how the themes fit together than about this claim.
- CC-003 Per-capita emissions vs 2030 projection (Misleading)through Renewables deliveryCC-0242030 carbon targetCC-0112030 carbon target
- CC-025 Per-capita emissions down 44% since 2005 (Largely supported)through Renewables deliveryCC-124Energy subsidiesCC-022Selective-metric pattern
- CC-051 'Over 30% of our seas protected' (Misleading)through Renewables deliveryCC-124Energy subsidiesCC-022Selective-metric pattern
Timeline
What was said, what was published before and after it, and each step of this check, in date order. Statements and sources carry the date they were published. The steps of the check carry the date the research was done, from the check's research log. Other statements by the same body on the same topic show whether a position was repeated, changed or corrected.
2025
- 6 May 2025 Earlier statement by Ministry for the Environment on Climate & Energy CC-022 'Lowest electricity burden in the EU' (Largely supported)
- July 2025 Reported Three firms bid for Malta's first offshore wind farm concession, Newsbook
- 22 July 2025 The statement Energy Ministry (Minister Miriam Dalli); Interconnect Malta (this claim)
- 22 July 2025 Reported Three submissions presented for the first offshore wind farm concession in Malta, TVM News
- 23 July 2025 Reported Three Applications Submitted in Malta's First Offshore Wind Tender, offshoreWIND.biz
- 13 November 2025 Later statement by Ministry for the Environment on Climate & Energy CC-003 Per-capita emissions vs 2030 projection (Misleading)
2026
- 22 April 2026 Evidence published Offshore floating wind farm: ICM issues tender to collect data on wind, wave conditions, InterConnect Malta
- 21 July 2026 Later statement by Miriam Dalli on Climate & Energy CC-027 Power cuts: heat, not generation (not yet checked)
- 4 October 2026 Added to the claims to check
- 6 October 2026 Check started Worker B took the claim (maintainer unblock, primary-source.md). TVM News and Newsbook re-read in full; ICM project page, news list and tenders page read; offshoreWIND.biz and Windtech read.
- 6 October 2026 Exact wording found Verbatim found: Minister Dalli quoted in quotation marks (TVM News, Newsbook, 22 Jul 2025); the ministry statement (300 MW, beyond territorial waters, timetable) is reported without quotation marks.
- 6 October 2026 Note Eurostat nrg_cb_e downloaded; output and share checks in tools/cc-029-report/calc.py (data/cc-029/checks.csv). Searched for a public notice of the next stage: none found.
- 6 October 2026 Version 1.0: first issue First issue. Verdict Largely supported (moderate confidence); pledge label Off track (as of 6 Oct 2026); pending right of reply.
- 6 October 2026 Note Audit follow-up research: ICM post list read through its website post list (22 posts, 1 Jun 2025 to 3 Oct 2026; none on the offshore wind qualification or dialogue stage); MaltaToday report of 4 Aug 2025 read in full via the Internet Archive; Newsbook text and date checked via the Internet Archive; web searches repeated. Log in literature/CC-029/notes.md.
- 6 October 2026 Version 1.1 1.1: corrections after the 6 Oct 2026 audit: MaltaToday source read and cited exactly; search log for the absence of a notice; TL;DR and flyer wording; Newsbook quotation checked; source notes. Verdict (Largely supported) and pledge label (Off track) unchanged; pending right of reply. Verdict in this version: Largely supported, moderate confidence.
- 6 October 2026 Note Pledge linked to Labour manifesto 2022 pledge 397 (same cycle): offshore renewables with the private sector, including floating wind; no capacity or date is stated in the manifesto. Search recorded.
- 6 October 2026 Evidence reviewed
- 6 October 2026 Pledge label: Off track Qualifying candidates informed of the next phase by the first part of 2026
- 6 October 2026 Correction MaltaToday reference (4 Aug 2025, Karl Azzopardi) now cited with its archived title and read in full, replacing a second-hand search summary; the minister's April 2026 dialogue date and end-2027 selection come from that read. Absence of a public notice now stated as what was searched (22 ICM posts since June 2025, tenders page, web searches). TL;DR no longer says the timetable "has slipped". Dalli's "important step forward" words attributed to Newsbook's text (TVM paraphrases without quotation marks). all corrections
- 6 October 2026 Clarification Flyer: removed the unsourced inference that a concession looks later. claim.yml source notes made specific; Eurostat marked as a scale check only. Right of reply pending (the check of ICM news back to July 2025 is complete). all corrections
2027
- 6 October 2027 Coming up: Evidence review due Each finished check is reviewed against new evidence within a year.
Every change to this claim's record is public: history of the record.