Pledges
Pledges
A pledge is a promise of future action, so it gets a label instead of a verdict: whether it can be measured and, if so, how it is going. Every label carries an as of date, the date of the evidence behind it.
See the pledges over time in Explore: one lane per party and one for commitments made in office, each pledge on the date it was made with a bar to its deadline, and a line from a pledge to the earlier one it carries forward (red where the earlier one was not met).
By election and party
Every party that contested each general election, in alphabetical order. A cell gives the number of pledges listed from its programme, the pledges checked so far, the listed pledges linked to another pledge, and any outlier. Commitments made in office have their own column.
| Election | ABBA | ADPD | Aħwa Maltin | Imperium Europa | Labour | Momentum | Nationalist | Partit Popolari | Volt Malta | In office |
|---|---|---|---|---|---|---|---|---|---|---|
| 2022 election | 6 listed | 48 listed | did not contest | did not contest | 129 listed CC-010 (Off track) 2 linked | did not contest | 53 listed | No programme found | 13 listed | CC-024 (On track) CC-029 (Off track) CC-086 (Missed) |
| 2026 election | did not contest | 88 listed | 35 listed | No programme found | 105 listed CC-011 (Not measurable) 5 linked 1 promised again | 52 listed | 96 listed CC-092 (Not measurable) CC-107 (Not measurable) | did not contest | did not contest | CC-031 (Not measurable) CC-095 (Not yet due) |
- Not measurable
- Not yet due
- On track
- Off track
- Met
- Missed
Also checked, outside these columns: CC-039 (Not measurable) (institutional target, before 2022), CC-055 (Not measurable) (campaign pledge, 2026–), CC-108 (Not measurable) (institutional target, 2022–26).
What each programme promised, by subject
Every pledge in the manifesto list placed under one of 12 subjects, a taxonomy drawn up from the pledges themselves (each placement read by a person). The deeper the shade, the more pledges; hover over a number for its subtopics, or press it to read the pledges. A party with more pledges on a subject has not necessarily promised more: programmes differ in length and in how finely they split a promise.
2022 election
| Subject | ABBA · 6 | ADPD · 48 | Labour · 129 | Nationalist · 53 | Volt Malta · 13 | All |
|---|---|---|---|---|---|---|
| Climate | · | 4 | 4 | 2 | · | 10 |
| Energy | · | 14 | 21 | 11 | 9 | 55 |
| Transport | · | 1 | 2 | 1 | · | 4 |
| Air & noise | 1 | · | 1 | 2 | · | 4 |
| Water | 2 | 4 | 9 | 1 | · | 16 |
| Waste | · | 3 | 14 | 4 | · | 21 |
| Nature & Wildlife | 2 | · | 13 | 6 | · | 21 |
| Animal welfare | · | · | 11 | · | · | 11 |
| Parks & trees | · | 1 | 34 | 2 | · | 37 |
| Countryside & coast | · | 7 | 5 | 7 | · | 19 |
| Land use & planning | 1 | 5 | 14 | 8 | 4 | 32 |
| Environmental governance | · | 9 | 1 | 9 | · | 19 |
2026 election
| Subject | ADPD · 88 | Aħwa Maltin · 35 | Labour · 105 | Momentum · 52 | Nationalist · 96 | All |
|---|---|---|---|---|---|---|
| Climate | 5 | · | 4 | 2 | 11 | 22 |
| Energy | 20 | 3 | 26 | 6 | 29 | 84 |
| Transport | 3 | · | · | · | 2 | 5 |
| Air & noise | · | · | 1 | · | 3 | 4 |
| Water | 3 | · | 10 | 1 | 3 | 17 |
| Waste | 16 | · | 10 | 5 | 3 | 34 |
| Nature & Wildlife | 13 | 8 | 8 | 9 | 5 | 43 |
| Animal welfare | · | 14 | · | · | 14 | 28 |
| Parks & trees | 3 | 1 | 38 | 1 | 8 | 51 |
| Countryside & coast | 6 | 1 | 3 | 4 | 2 | 16 |
| Land use & planning | 10 | 8 | 4 | 24 | 5 | 51 |
| Environmental governance | 9 | · | 1 | · | 11 | 21 |
Promised again? Similar wording in 2022 and 2026
For the parties with a programme at both elections, each 2026 pledge is compared with the party's own 2022 programme. Found automatically and not yet reviewed: similar wording is a lead, not a link. A pledge can carry an earlier one forward in new words (and score low), or share words with a different promise (and score high). Only a person's reading makes it a link, which then appears in the grid above and on the claim pages.
How close two programmes' wording is depends on how they are written as well as on what they promise. The Nationalist Party's 2026 programme was published as web chapters, in a different structure from its 2022 document, and wording alone cannot tell a promise rewritten from a new one. These counts do not measure how many promises a party repeated, kept or dropped.
By subject
ADPD: the 36 strongly similar pairs
| 2022 programme | 2026 programme | Subject |
|---|---|---|
| No. 15 Oblige every large company, including banks, insurers and financial-services firms, to show how they will become zero-carbon before 2050. | No. 14 Oblige every large company, including banks, insurers and financial-services firms, to show how they will become zero-carbon before 2050. | Climate |
| No. 16 Tie all state aid to companies, immediately, to climate-friendly changes in operations, fewer redundancies, equal pay and retraining for a green, circular economy. | No. 15 Tie all aid to companies, immediately, to energy-efficient operation, use of renewables and projects generating the clean energy they need. | Climate |
| No. 15 Oblige every large company, including banks, insurers and financial-services firms, to show how they will become zero-carbon before 2050. | No. clim-03 Tie all financial aid to industry to concrete emission cuts, obliging every aided company to reach zero carbon. | Climate |
| No. clim-01 Cut emissions drastically, by well over half, by 2030, so that Malta becomes a zero-carbon society by 2050 or sooner. | No. clim-03 Tie all financial aid to industry to concrete emission cuts, obliging every aided company to reach zero carbon. | Climate |
| No. acc-01 Publish a definitive map of all public footpaths. | No. acc-01 Publish a definitive map of all public footpaths. | Countryside & coast |
| No. acc-02 Ensure that all traditional footpaths are open and accessible to everyone. | No. acc-02 Ensure that all traditional footpaths are open and accessible to everyone. | Countryside & coast |
| No. acc-03 No footpath should be blocked by a gate unless there is proof the land is private. | No. acc-03 No footpath should be blocked by a gate or otherwise unless there is proof the land is private. | Countryside & coast |
| No. acc-06 Create Malta's first National Trail along the Victoria Lines. | No. acc-06 Create Malta's first National Trail along the Victoria Lines. | Countryside & coast |
| No. acc-04 Footpaths on public land leased to farmers should remain open to the public. | No. acc-04 Footpaths on public land leased to farmers should remain open and accessible to the public. | Countryside & coast |
| No. acc-05 Create a national agency to manage existing walking trails and implement those planned in local plans. | No. acc-05 Create a national agency to manage existing trails, implement those planned in local plans and safeguard countryside access. | Countryside & coast |
| No. acc-02 Ensure that all traditional footpaths are open and accessible to everyone. | No. acc-04 Footpaths on public land leased to farmers should remain open and accessible to the public. | Countryside & coast |
| No. 9 Make long-term investment in offshore wind energy, presented as necessary for the 2050 zero-carbon goal. | No. 12 Make long-term investment in offshore wind energy, presented as necessary for the 2050 zero-carbon goal. | Energy |
| No. 10 Set feed-in tariffs, subsidies and incentives for renewables over a long horizon, for example 20 years, to give investment certainty. | No. 13 Set feed-in tariffs, subsidies and incentives for renewables over a long horizon, for example 20 years. | Energy |
| No. 4 Impose a moratorium on increases in building heights so that the use of rooftop PV panels is not affected. | No. 9 Impose a moratorium on increases in building heights so that the use of rooftop PV panels is not affected. | Energy |
| No. 5 Create schemes and a legal framework so that apartment owners can jointly own PV panels on their block's roof. | No. 10 Create schemes and a legal framework so that apartment owners can jointly own PV panels on their block's roof. | Energy |
| No. 8 Sustain and strengthen research already under way on wave energy and floating offshore PV panels. | No. 11 Sustain and strengthen research already under way on wave energy and floating offshore PV panels. | Energy |
| No. 2 Install micro wind turbines in industrial zones. | No. 5 Install micro wind turbines in industrial zones. | Energy |
| No. 3 Require every new building to be carbon neutral and generate all the energy it needs. | No. 8 Require every new building to be carbon neutral and generate all the energy it needs. | Energy |
| No. 6 Allow quarries as solar farms only under strict rules: structures prefabricated or fully reversible, no concreting of land, no warehouses or industrial buildings. | No. 7 Use rehabilitated quarries more for solar farms, crops and woodland, under strict rules ensuring reversible structures and no other uses. | Energy |
| No. 2 Install micro wind turbines in industrial zones. | No. clim-02 Install solar panels on every building and invest in new infrastructure, including offshore wind turbines. | Energy |
| No. 1 Use every public building, factory and commercial building to generate solar energy. | No. 1 Use every public, commercial and industrial building for solar generation, and consider wind where space permits. | Energy |
| No. board-02 Laws should give civil society proper representation on these boards, chosen by civil society itself rather than vetted by the minister. | No. board-02 Laws should give civil society proper representation on these boards, chosen by civil society itself rather than vetted by the minister. | Environmental governance |
| No. board-03 Remove representation of the parliamentary political parties from these decision-making boards. | No. board-03 Remove representation of the parliamentary political parties from these decision-making boards. | Environmental governance |
| No. board-04 Parliament's standing committees should continuously oversee these authorities and report with proposals for action. | No. board-04 Parliament's standing committees should continuously oversee these authorities and report with proposals for action. | Environmental governance |
| No. board-05 Set clear conduct rules for board members, including a register of their assets. | No. board-05 Set clear conduct rules for board members, including a register of their assets. | Environmental governance |
| No. board-06 No one should be appointed to these boards for long periods. | No. board-06 No one should be appointed to these boards for long periods. | Environmental governance |
| No. env-01 Make the Constitution's environmental principles enforceable, so citizens can ask the courts to compel government action on environmental matters. | No. env-05 Make the Constitution's environmental principles enforceable, so citizens can ask the courts to compel government action on environmental matters. | Environmental governance |
| No. env-02 Give environmental NGOs financial assistance from the state. | No. env-06 Give environmental NGOs financial assistance from the state. | Environmental governance |
| No. sd-01 Give the Guardian of Future Generations the capacity to scrutinise the government's work. | No. sd-01 Give the Guardian of Future Generations the capacity to scrutinise the government's work. | Environmental governance |
| No. board-01 Apply parliamentary scrutiny before appointment to all members of the Planning, Lands and Environment and Resources authority boards. | No. board-01 Apply public parliamentary scrutiny before appointment to all members of the planning, lands and environment authority boards, including chairpersons and chief executives. | Environmental governance |
| No. land-02 Revoke the 2006 rationalisation scheme that made about two million square metres developable, protecting the parts still undeveloped. | No. odz-01 Revoke the 2006 rationalisation exercise (about two million square metres) and reclassify all still-untouched land in it as outside the development zone. | Land use & planning |
| No. land-01 Update local plans regularly and redraw many of them. | No. lp-02 Update the 20-year-old local plans to present-day realities. | Land use & planning |
| No. waste-03 Opposes the government's planned waste incinerator at Magħtab, arguing that it would discourage recycling. | No. waste-09 Incinerate the least waste possible; criticises the government's plan to incinerate 40% of waste and an incinerator sized accordingly. | Waste |
| No. water-02 Monitor buildings now going up more closely, so they provide for rainwater storage. | No. water-01 Monitor buildings now going up more closely, so they provide for rainwater storage. | Water |
| No. water-03 State aid schemes should increasingly help owners improve water storage in existing buildings. | No. water-02 State aid schemes should increasingly help owners improve water storage in existing buildings. | Water |
| No. water-04 Pay more attention to using treated sewage effluent, particularly in agriculture. | No. water-03 Pay more attention to using treated sewage effluent, particularly in agriculture. | Water |
Labour: the 15 strongly similar pairs
| 2022 programme | 2026 programme | Subject |
|---|---|---|
| No. 411 Complete the Grand Harbour shore-to-ship project, cutting ship pollution and improving air quality, and start another shore-to-ship project at the Freeport. | No. 16.37 Support Malta International Airport to supply grid electricity to parked aircraft, as with ships at the Grand Harbour. | Air & noise |
| No. 399 Continue studies and technical preparations for a hydrogen project to supply clean energy, supporting decarbonisation goals. | No. 16.7 Hydrogen-ready gas pipeline studies are complete; will keep seeking EU funds for the project, linked to 2050 decarbonisation goals. | Energy |
| No. 395 Continue keeping energy prices in Malta under control to give families and businesses stability. | No. 16.11 Reports energy and fuel subsidies above €1 billion that kept bills stable; commits to keeping price stability policy in coming years. | Energy |
| No. 383 Build new automated substations across Malta and Gozo over five years, without inconvenience to residents. | No. 16.10 Reports substation and distribution centre works; will keep investing in new substations and cables for stable, reliable supply. | Energy |
| No. 366 Work with hunters’ associations and local and foreign experts to expand research on turtle dove migration routes over Malta. | No. 14.64 Strengthen the turtle dove breeding and release project with direct support for participants. | Nature & Wildlife |
| No. 365 Maintain hunting and trapping practice in line with EU directives, safeguarding trapping and the spring hunting season. | No. 14.63 Defend derogations allowed under EU directives to safeguard hunting and trapping, and work with hunters and trappers on environmental restoration projects. | Nature & Wildlife |
| No. 292 Start roofing over the area outside the Santa Venera tunnels, creating open spaces, a garden and public facilities on top. | No. 14.34 After the Imsida Creek project, cover the area outside the Santa Venera tunnel to create an open space with new trees. | Parks & trees |
| No. 305 Launch a wide action plan for tree planting and afforestation, committing to 100,000 trees planted in the next five years. | No. 14.43 Continue afforestation and distribute fruit trees to councils, NGOs and the public, after over 57,000 trees were planted in 2022-2025. | Parks & trees |
| No. 312 Launch a campaign gradually removing invasive alien trees from public rural areas and replacing them with indigenous trees. | No. 14.47 Continue removing invasive trees from natural areas such as Għajn Tuffieħa, l-Aħrax tal-Mellieħa and Salina, replacing them with indigenous trees. | Parks & trees |
| No. 291 Regenerate the car park area in Triq San Pawl, Bormla, into an open space, with underground parking for residents and visitors to Bormla and Isla. | No. 14.30 Start works this year on the former AUM dormitory site in Bormla: open space with trees, swings, outdoor gym and underground parking. | Parks & trees |
| No. 311 Work with primary schools and local councils so children learn about endemic trees and sow seedlings later planted in localities. | No. 14.43 Continue afforestation and distribute fruit trees to councils, NGOs and the public, after over 57,000 trees were planted in 2022-2025. | Parks & trees |
| No. 296 Extend Ġnien Karin Grech, San Ġwann, with a new square and green space, a proposed traffic tunnel and underground parking. | No. 14.31 Start the San Ġwann centre project in coming months: underground parking first, then replace the car area in front of the church with a garden. | Parks & trees |
| No. 323 Create a garden network in Floriana integrating gardens with Argotti Gardens as an accessible green network supporting biodiversity. | No. 14.15 Link Floriana and Tal-Pietà gardens into a green network, with more restoration at Ġnien San Filippu, Pinetum works and regeneration at Ġnien tal-Milorda. | Parks & trees |
| No. 294 Roof over part of the water channel along Triq il-Qasab, Birkirkara, without reducing water flow, creating a new green space. | No. 14.35 After technical studies, create an open space with trees, children's and exercise facilities on the Triq il-Qasab watercourse in Birkirkara. | Parks & trees |
| No. 352 Add reuse centres within bulky waste sites and study a repair centre for items about to be discarded. | No. 14.56 Keep promoting the five bulky-waste centres in Malta and Gozo and open another such centre in the south of Malta. | Waste |
The labels
- Not measurable
- the pledge as worded has no definition, baseline or date against which delivery could be checked.
- Not yet due
- the pledge is measurable, its deadline or term has not passed, and no progress data have been published yet.
- On track
- published progress is at or ahead of a straight-line path (or the pledge's own milestones) to the target by the deadline.
- Off track
- published progress is behind that path, and the target has not yet been shown to be met or missed.
- Met
- documents or data show the target was reached, by the deadline if one was set.
- Missed
- the deadline or term has passed, and documents or data that can be shown say the target was not reached.
A check of a pledge alone shows only its label. A check that also tests factual statements keeps its verdict for those and shows the label beside it. Decided on 5 October 2026; see the Pledges section of the verdict scale.
Pledges checked so far
| Pledge | Made by | Made in | Deadline | Label |
|---|---|---|---|---|
| CC-010 Tree-planting counts (Largely supported) 100,000 trees in the next five years |
Partit Laburista (Labour Party) | Labour manifesto 2022, pledge 305 11 March 2022 |
26 March 2027 | Off track as of 31 December 2025 verdict on the facts: Largely supported |
| CC-011 Ten minutes' walk to green space (pledge: Not measurable) Every person no more than ten minutes' walk from an open or green space |
Partit Laburista (Labour Party) | Labour manifesto 2026 (Int Malta), priority 19 May 2026 |
none stated | Not measurable as of 5 October 2026 |
| CC-024 Renewables target for 2030 (Not substantiated) 24.5% renewables share of gross final energy consumption in 2030 (summary: 25%) |
Government of Malta | Final updated NECP 2021-2030 (submitted 7 Jan 2025) 7 January 2025 |
31 December 2030 | On track as of 15 September 2026 verdict on the facts: Not substantiated |
| CC-029 First offshore wind farm (Largely supported) Qualifying candidates informed of the next phase by the first part of 2026 |
Ministry for the Environment | Energy Ministry statement on the first offshore wind concession (TVM News, 22 Jul 2025) 22 July 2025 |
none stated | Off track as of 6 October 2026 verdict on the facts: Largely supported |
| CC-031 Gozo, first climate-neutral region (Largely supported) Gozo becoming the first climate-neutral region in Malta |
Clint Camilleri | Statement on the Gozo climate neutrality plan (Gozo Today, 25 Sep 2026) 25 September 2026 |
none stated | Not measurable as of 6 October 2026 verdict on the facts: Largely supported |
| CC-039 Net Zero Impact Utility (pledge: Not measurable) Groundwater abstraction reduced by 4 billion litres a year; more water with less energy |
Water Services Corporation | WSC news release, European Commission endorses the Net Zero Impact Utility project 2 April 2019 |
none stated | Not measurable as of 6 October 2026 |
| CC-055 Manoel Island back to the public (Supported) Manoel Island becomes a national park |
Robert Abela | Statement on signing the deed with MIDI (Newsbook, TVM News, 13 May 2026) 13 May 2026 |
none stated | Not measurable as of 9 October 2026 verdict on the facts: Supported |
| CC-086 Comino kiosks tendered from 2026 (pledge: Missed) Comino's kiosks and beach concessions awarded by competitive tender from summer 2026 ("everyone will have to compete and pay the right price") |
Ian Borg | Statement to The Shift (14 Apr 2025) 14 April 2025 |
31 August 2026 | Missed as of 12 October 2026 |
| CC-092 PN: afforestation in a net-zero Gozo (pledge: Not measurable) Afforestation among the initiatives to make Gozo a Net-Zero Island by 2040, and more afforestation in Malta and Gozo; no area, number of trees, species, sites or date |
Partit Nazzjonalista (Nationalist Party) | PN electoral programme 2026 (Nifs Ġdid), chapters Għawdex (item 46) and Ambjent (items 01, 20) 18 May 2026 |
none stated | Not measurable as of 10 October 2026 |
| CC-095 EUR 400m to keep bills low (Not substantiated) Energy support kept in 2027, so that retail prices of fuel, electricity and gas stay unchanged ("what there is in the energy sector, come what may, will remain") |
Clyde Caruana | Launch of the Pre-Budget Document 2027 (BusinessNow, Lovin Malta, TVM News, Newsbook, 30 Sep 2026) 30 September 2026 |
31 December 2027 | Not yet due as of 10 October 2026 verdict on the facts: Not substantiated |
| CC-107 A net-zero Gozo by 2040 (pledge: Not measurable) A clear and realistic plan for Gozo to become a Net-Zero Island by 2040 |
Partit Nazzjonalista (Nationalist Party) | PN electoral programme 2026 (Nifs Ġdid), chapter Għawdex May 2026 |
31 December 2040 | Not measurable as of 5 October 2026 |
| CC-108 Net-zero impact on the groundwater environment (pledge: Not measurable) WSC annual groundwater abstraction capped at 14 Mm3 up to 2030; WSC 'moving towards' net-zero impact on the groundwater environment |
Energy and Water Agency | Green Paper on the Regulation of Groundwater Abstraction in the Maltese Islands (EWA, Nov 2023) November 2023 |
31 December 2030 | Not measurable as of 11 October 2026 |
Outliers
The usual chain runs from a campaign promise to a commitment in office to an outcome. An outlier breaks that chain. Each is stated as a finding with the record it rests on, never inferred from a gap, and never about motive. The rules are in the Outliers part of the verdict scale.
Recycled (1)
The same promise made again in a later election while the earlier one was not met. Applies to every party.
- Labour Party 2026 manifesto, no. 16.1
(Work on Malta's first offshore wind farm has begun; operator interest is being assessed; work on 300MW of installations to start in coming years; in the manifesto list, not checked)
Also promised earlier: CC-029, First offshore wind farm (government commitment, 2022–26, Off track).
Drift (0)
A commitment linked to an earlier promise, but changed from it: a target lowered, a deadline moved, the scope narrowed or the measure changed.
None recorded yet.
Unanchored (0)
A government commitment with no earlier pledge behind it. Shown only after a recorded search of the manifestos.
None recorded yet. A commitment is listed here only after a recorded search finds no earlier pledge.
Dropped (0)
A campaign pledge of the governing party with no follow-up in office. Shown only after the legislature has ended and a search is recorded.
None recorded yet. The 2022–26 legislature has ended; the check of the governing party's 2022 pledges for a follow-up in office has not been done.
Carried forward (7)
Not outliers: a commitment that takes forward an earlier pledge, as recorded. Shown so that the chains can be followed, and on the pledges timeline in Explore.
- CC-024 Renewables target for 2030 (Not substantiated)
Carries forward: Malta Flimkien: Manifest Elettorali 2022, 378 (2022–26). - CC-029 First offshore wind farm (Largely supported)
Carries forward: Malta Flimkien: Manifest Elettorali 2022, 397 (2022–26). - CC-031 Gozo, first climate-neutral region (Largely supported)
Carries forward: Int Malta: Manifest Elettorali 2026, 13.28 (2026–). - CC-055 Manoel Island back to the public (Supported)
Carries forward: Int Malta: Manifest Elettorali 2026, 14.5 (2026–). - CC-055 Manoel Island back to the public (Supported)
Carries forward: Int Malta: Manifest Elettorali 2026, 14.7 (2026–). - CC-095 EUR 400m to keep bills low (Not substantiated)
Carries forward: Int Malta: Manifest Elettorali 2026, 16.11 (2026–). - Labour Party 2026 manifesto, no. 16.1
Carries forward: Malta Flimkien: Manifest Elettorali 2022, 397.
From promise to outcome
Not drawn yet. A programme's flow appears here once every pledge listed from it has been checked for a follow-up in office, so that a pledge not yet checked is never shown as if it had been dropped. No programme has been fully checked so far.
The manifesto list
So that pledges can be linked across elections, Miżien keeps a light list of the pledges in each programme: the whole of every environment chapter and every climate and energy chapter, for every party that contested the election, to the same scope. Each is a summary in our own words with its number and page. Most have not been checked; a listed pledge carries no label until it is.
| Election | Party | Programme | Pledges listed | With a target |
|---|---|---|---|---|
| 2022 | ABBA | Electoral Manifest – Everyone Counts (Policies) | 6 | 1 |
| 2022 | ADPD – The Green Party | Manifest Elettorali – Elezzjoni Ġenerali 2022 | 48 | 5 |
| 2022 | Partit Laburista (Labour Party) | Malta Flimkien: Manifest Elettorali 2022 | 129 | 17 |
| 2022 | Partit Nazzjonalista (Nationalist Party) | Viżjoni Għal Malta 2030 +1 | 53 | 5 |
| 2022 | Partit Popolari | No programme found. 6 Oct 2026: partitpopolari.mt (TLS certificate for another host; plain http returns a hosting error page); Wayback Machine, archive.ph, Common Crawl and arquivo.pt (refused or reset from here); web searches for the 2022 manifesto. The programme was presented on 15 Mar 2022 (TVM) and published as web chapters, now offline. | – | – |
| 2022 | Volt Malta | Volt Malta Manifesto 2022 | 13 | 3 |
| 2026 | ADPD – The Green Party | Ilkoll: Manifest Elettorali 2026 | 88 | 6 |
| 2026 | Aħwa Maltin | Malta għall-Maltin: Programm Elettorali, Elezzjoni Ġenerali 2026 | 35 | 4 |
| 2026 | Imperium Europa | No programme found. 6 Oct 2026: imperium-europa.org (502 or reset), imperiumeuropa.org (502); web searches for a 2026 manifesto; the only lead is a Facebook post labelled 'Manifesto (in English)' on Wikipedia, which cannot be read from here. | – | – |
| 2026 | Momentum | Momentum: Bidla ta' Vera, Electoral Manifesto 2026 (English edition) | 52 | 5 |
| 2026 | Partit Laburista (Labour Party) | Int Malta: Manifest Elettorali 2026 | 105 | 27 |
| 2026 | Partit Nazzjonalista (Nationalist Party) | Nifs Ġdid: Programm Elettorali 2026 (web chapters) | 96 | 12 |
Counts differ because programmes differ in length and layout, not in scope. "With a target": the pledge states a quantity, date or deadline that could be checked. Browse the list.
Overlapping pledges
Pledges overlap when they are listed as overlapping, share a theme, or are on the same subtopic. Overlapping pledges are worth reading together, for example when two parties promise to tackle the same problem.
CC-011 Ten minutes' walk to green space (pledge: Not measurable)
Overlaps CC-024 Renewables target for 2030 (Not substantiated): share a theme.
Overlaps CC-092 PN: afforestation in a net-zero Gozo (pledge: Not measurable): same subtopic (Manifestos & pledges).
Overlaps CC-107 A net-zero Gozo by 2040 (pledge: Not measurable): same subtopic (Manifestos & pledges).
CC-024 Renewables target for 2030 (Not substantiated)
Overlaps CC-011 Ten minutes' walk to green space (pledge: Not measurable): share a theme.
Overlaps CC-029 First offshore wind farm (Largely supported): same subtopic (Renewables); share a theme.
CC-029 First offshore wind farm (Largely supported)
Overlaps CC-024 Renewables target for 2030 (Not substantiated): same subtopic (Renewables); share a theme.
CC-031 Gozo, first climate-neutral region (Largely supported)
Overlaps CC-092 PN: afforestation in a net-zero Gozo (pledge: Not measurable): share a theme.
Overlaps CC-107 A net-zero Gozo by 2040 (pledge: Not measurable): share a theme.
CC-039 Net Zero Impact Utility (pledge: Not measurable)
Overlaps CC-108 Net-zero impact on the groundwater environment (pledge: Not measurable): same subtopic (Water supply & groundwater); share a theme.
CC-092 PN: afforestation in a net-zero Gozo (pledge: Not measurable)
Overlaps CC-011 Ten minutes' walk to green space (pledge: Not measurable): same subtopic (Manifestos & pledges).
Overlaps CC-031 Gozo, first climate-neutral region (Largely supported): share a theme.
Overlaps CC-107 A net-zero Gozo by 2040 (pledge: Not measurable): same subtopic (Manifestos & pledges); share a theme.
CC-107 A net-zero Gozo by 2040 (pledge: Not measurable)
Overlaps CC-011 Ten minutes' walk to green space (pledge: Not measurable): same subtopic (Manifestos & pledges).
Overlaps CC-031 Gozo, first climate-neutral region (Largely supported): share a theme.
Overlaps CC-092 PN: afforestation in a net-zero Gozo (pledge: Not measurable): same subtopic (Manifestos & pledges); share a theme.
CC-108 Net-zero impact on the groundwater environment (pledge: Not measurable)
Overlaps CC-039 Net Zero Impact Utility (pledge: Not measurable): same subtopic (Water supply & groundwater); share a theme.