Public agencies & companies
Interconnect Malta
- 2 claims listed
- 1 checked
- 7 linked bodies
1 of 5 checks: too few to summarise
Claims
| Claim | Topic | Date | Verdict |
|---|---|---|---|
| CC-023 Second interconnector by 2026 (not yet checked) by Government of Malta |
Climate & Energy | not yet checked | |
| CC-029 First offshore wind farm (Largely supported) by Ministry for the Environment |
Climate & Energy | 22 July 2025 | Largely supported draft |
Statements over time
Each dot is one claim, placed on the date it was made and coloured by its verdict, with a row for each topic. Where this body returned to a topic, the claims are listed below in date order, so you can see whether a position was repeated, changed or corrected. Read each check for the detail: the dots are not a score.
Dot colour: the verdict; grey is not yet checked. A dashed ring means only the year (or an approximate date) is known, so the dot sits in the middle of the year.
Not dated yet: CC-023 (not yet checked).
Follow these claims (an Atom feed of new claims, verdicts and report updates; paste the link into a feed reader)
Latest updates (14)
What the claims are about
- Topics
- Climate & Energy 2
- Pattern tags
- Promise-without-baseline 1
Linked bodies
Bodies are linked when they are named in the same claim, or when their claims share a theme (a cause, a mechanism, a target or a way of presenting figures). A link says the claims are worth reading together; it does not say the bodies agree, disagree or act together.
-
Named in the same claim: CC-023 Second interconnector by 2026 (not yet checked).
Shares Renewables delivery: CC-029 (Largely supported) with CC-024 (Not substantiated).
-
Named in the same claim: CC-029 First offshore wind farm (Largely supported).
Shares Energy supply security: CC-023 (not yet checked) with CC-027 (not yet checked).
-
Shares Renewables delivery: CC-029 (Largely supported) with CC-124 (Largely supported).
-
Shares Renewables delivery: CC-029 (Largely supported) with CC-119 (not yet checked).
-
Shares Energy supply security: CC-023 (not yet checked) with CC-028 (not yet checked).
-
Shares Energy supply security: CC-023 (not yet checked) with CC-027 (not yet checked).
-
Partit Nazzjonalista (Nationalist Party)
Shares Energy supply security: CC-023 (not yet checked) with CC-126 (not yet checked).