CC-023 · Climate & Energy · Electricity & grid
Second interconnector by 2026
Not yet checked Check in progress
The claim
Government of Malta: the second electricity interconnector to Sicily is on track to be completed by 2026 and will let Malta tap renewable energy on the European grid.
- Who
- Government of Malta; Interconnect Malta
- Where
- Auberge de Castille (Office of the Prime Minister), Valletta
- Wording
- Paraphrase: locate quote
Context
The NECP (Dec 2024) commits to commissioning by 2030; the completion date and the share of imported renewable power are testable.
Limitations
Candidate from the 4 Oct 2026 intake: wording paraphrased from a locator source; read the primary text before any report.
What it will be tested against
Interconnect Malta project milestones; NECP; ENTSO-E.
Sources
-
Second interconnector to help Malta achieve renewable energy goals, Newsbook, n/d.
Original · fetched and fingerprinted 2026-10-10; no public snapshot yet
Locates the claim.
Right of reply
Not applicable until a draft verdict exists.
Connections
How this claim relates to the others: who made it, the themes it shares with other claims, and the patterns it shows. A connection is a reason to read two checks side by side. It does not make either one right or wrong. How connections are found.
Who made it
Government of Malta Interconnect Malta
Other claims by Government of Malta 39
- CC-003 Per-capita emissions vs 2030 projection (Misleading)
- CC-004 'Strong progress' in waste separation (Not substantiated)
- CC-006 Spring hunting derogation (Not substantiated)
- CC-010 Tree-planting counts (Largely supported)
- CC-012 Ta' Qali gravel and grass (Contradicted)
- CC-016 Shore-to-ship: 90% less harbour pollution (Misleading)
- CC-017 Land reclamation outside the Freeport (Not substantiated)
- CC-021 Malta-Gozo tunnel traffic (not yet checked)
- CC-022 'Lowest electricity burden in the EU' (Largely supported)
- CC-024 Renewables target for 2030 (Not substantiated)
- CC-025 Per-capita emissions down 44% since 2005 (Largely supported)
- CC-027 Power cuts: heat, not generation (not yet checked)
- CC-029 First offshore wind farm (Largely supported)
- CC-031 Gozo, first climate-neutral region (Largely supported)
- CC-032 Solar flowers, first in Europe (Contradicted)
- CC-041 Sewage plants compliant by 2026 (not yet checked)
- CC-043 13 Blue Flag beaches (not yet checked)
- CC-044 2,400 tonnes from storm tunnels (not yet checked)
- CC-045 Do 20 km of tunnels manage flooding? (Not substantiated)
- CC-048 Sea urchins recovering (not yet checked)
- CC-051 'Over 30% of our seas protected' (Misleading)
- CC-054 Project Green: 100,000 m2 a year (not yet checked)
- CC-055 Manoel Island back to the public (Supported)
- CC-060 7,000 first-time buyers helped (not yet checked)
- CC-061 260 homes 30% below market (not yet checked)
- CC-064 Grand Harbour regeneration (not yet checked)
- CC-068 Marsaskala marina shelved (not yet checked)
- CC-069 82 million bus trips (not yet checked)
- CC-072 EUR 15m to take cars off the road (not yet checked)
- CC-073 Cab trips up 68% (not yet checked)
- CC-077 Metro: first section early 2030s (not yet checked)
- CC-078 Gozo Channel: +511,000 passengers (not yet checked)
- CC-083 Record tourism, 'future-proofed' (not yet checked)
- CC-086 Comino kiosks tendered from 2026 (pledge: Missed)
- CC-087 177 illegal short lets (not yet checked)
- CC-090 20 heat-linked deaths (not yet checked)
- CC-095 EUR 400m to keep bills low (Not substantiated)
- CC-096 Fish farms moved 6 km offshore (not yet checked)
- CC-103 Heat-death locations "within three months" (not yet checked)
Linked directly 3
Claims that share a theme with this one. A theme is a cause, a mechanism, a target or a way of presenting figures that the editors have found in several claims; its strength says how close the link is.
Energy supply security Shared target · Weak (indicative)
Claims about whether Malta's power and gas supply is secure and on time: the second interconnector (CC-023), the July 2026 power cuts (CC-027), Enemalta's investment ahead of demand (CC-028) and the Opposition's claim on the BP gas contract and the missing gas pipeline (CC-126). Indicative until a report tests them.
Two steps away 3
Not linked to this claim directly, but linked to a claim that is. These are found by following the links, not chosen by the editors, so they are looser: they show where one theme meets another.
- CC-090 20 heat-linked deaths (not yet checked)through Energy supply securityCC-027Heat, power cuts and health
- CC-097 Beach workers left exposed to heat (not yet checked)through Energy supply securityCC-027Heat, power cuts and health
- CC-103 Heat-death locations "within three months" (not yet checked)through Energy supply securityCC-027Heat, power cuts and health
Three steps away 1
One step further again. At this distance a connection says more about how the themes fit together than about this claim.
- CC-102 Ombudsman: 58% of environment recommendations ignored (Largely supported)through Energy supply securityCC-027Heat, power cuts and healthCC-103Oversight and disclosure
Timeline
What was said, what was published before and after it, and each step of this check, in date order. Statements and sources carry the date they were published. The steps of the check carry the date the research was done, from the check's research log. Other statements by the same body on the same topic show whether a position was repeated, changed or corrected.
The date of the statement is not recorded yet.
2024
- December 2024 Statement by Government of Malta on Climate & Energy CC-024 Renewables target for 2030 (Not substantiated)
2025
- 6 May 2025 Statement by Ministry for the Environment on Climate & Energy CC-022 'Lowest electricity burden in the EU' (Largely supported)
- 22 July 2025 Statement by Ministry for the Environment on Climate & Energy CC-029 First offshore wind farm (Largely supported)
- 21 October 2025 Statement by Clint Camilleri and Parliamentary Secretariat for Public Works on Climate & Energy CC-032 Solar flowers, first in Europe (Contradicted)
- 13 November 2025 Statement by Ministry for the Environment on Climate & Energy CC-003 Per-capita emissions vs 2030 projection (Misleading)
- November 2025 Statement by Government of Malta on Climate & Energy CC-025 Per-capita emissions down 44% since 2005 (Largely supported)
2026
- 21 July 2026 Statement by Miriam Dalli and Robert Abela on Climate & Energy CC-027 Power cuts: heat, not generation (not yet checked)
- 25 September 2026 Statement by Clint Camilleri on Climate & Energy CC-031 Gozo, first climate-neutral region (Largely supported)
- 30 September 2026 Statement by Clyde Caruana on Climate & Energy CC-095 EUR 400m to keep bills low (Not substantiated)
- 4 October 2026 Added to the claims to check
- 4 October 2026 Check started Worker A, attempt 1: blocked on source. No statement found saying the second interconnector is on track for 2026; Newsbook (5 Jul 2021) has Minister Dalli giving 2025 (200 MW, Ragusa). Needed: the dated primary statement.
Every change to this claim's record is public: history of the record.