Miżien

Pledges

The manifesto list

The environment, climate and energy pledges in the programme of every party that contested each general election, to the same scope. Each is a summary in our own words, with the number and page in the programme.

Most of these pledges have not been checked, so they carry no label. A pledge that has been checked links to its claim page. The list is there so that a promise can be followed from one election to the next; the links found so far, and any outliers, are on the Pledges page. Summaries are ours: read the programme itself for the exact wording. Scope and sources are in manifesto_coverage.csv.

2022 general election

ABBA · 6 pledges

Electoral Manifest – Everyone Counts (Policies). Covered: chapter 6, Environment (p. 14); the programme has no energy or climate chapter.

No.Pledge (our summary)SubjectTargetSection and page
env-01 Harvest rainwater better and use it directly instead of letting it run off to sea with topsoil. Water
Rainwater, groundwater & reuse
–6 Environment
PDF p. 14
env-02 Build new public and private housing to use less energy and collect water in wells, with money-saving incentives for recycling that water. Water
Rainwater, groundwater & reuse
–6 Environment
PDF p. 14
env-03 Move fish farms to a selected area away from the shore and monitor them properly. Nature & Wildlife
Fishing & fish farms
–6 Environment
PDF p. 14
env-04 Ban ships from berthing on Hurd's Bank and require them to anchor in at least 400 m of water instead of the present 200 m. Nature & Wildlife
Marine & coastal protection
at least 400 m depth (vs 200 m now)6 Environment
PDF p. 14
env-05 Require vehicles not meeting EU standards, especially plant and government vehicles, to be fitted with emission filters to cut air pollution. Air & noise
Air quality
–6 Environment
PDF p. 14
env-06 Overhaul the body the document calls CMEPA so that the public interest takes priority over developers' interests. Land use & planning
Planning system & reform
–6 Environment
PDF p. 14
ADPD – The Green Party · 48 pledges

Manifest Elettorali – Elezzjoni Ġenerali 2022. Covered: chapters on climate, environment, countryside access, land and sea use, ODZ, decision-making boards, sustainable development, water and waste (pp. 28–53).

No.Pledge (our summary)SubjectTargetSection and page
clim-01 Cut emissions drastically, by well over half, by 2030, so that Malta becomes a zero-carbon society by 2050 or sooner.
Similar wording in its 2026 programme (found automatically, not reviewed): No. clim-03
Climate
Climate targets
emissions cut by more than half by 2030; zero-carbon by 2050Il-politika dwar il-klima
PDF p. 29
1 Use every public building, factory and commercial building to generate solar energy.
Similar wording in its 2026 programme (found automatically, not reviewed): No. 1
Energy
Rooftop & community generation
–Il-politika dwar il-klima
PDF p. 29
2 Install micro wind turbines in industrial zones.
Similar wording in its 2026 programme (found automatically, not reviewed): No. 5, No. clim-02
Energy
Rooftop & community generation
–Il-politika dwar il-klima
PDF p. 29
3 Require every new building to be carbon neutral and generate all the energy it needs.
Similar wording in its 2026 programme (found automatically, not reviewed): No. 8
Energy
Energy efficiency
–Il-politika dwar il-klima
PDF p. 29
4 Impose a moratorium on increases in building heights so that the use of rooftop PV panels is not affected.
Similar wording in its 2026 programme (found automatically, not reviewed): No. 9
Energy
Rooftop & community generation
–Il-politika dwar il-klima
PDF p. 29
5 Create schemes and a legal framework so that apartment owners can jointly own PV panels on their block's roof.
Similar wording in its 2026 programme (found automatically, not reviewed): No. 10
Energy
Rooftop & community generation
–Il-politika dwar il-klima
PDF p. 29
6 Allow quarries as solar farms only under strict rules: structures prefabricated or fully reversible, no concreting of land, no warehouses or industrial buildings.
Similar wording in its 2026 programme (found automatically, not reviewed): No. 7
Energy
Large-scale & offshore renewables
–Il-politika dwar il-klima
PDF p. 29
7 Solar farms must not be used as an excuse to destroy more farmland, even land not being cultivated. Energy
Large-scale & offshore renewables
–Il-politika dwar il-klima
PDF p. 29
8 Sustain and strengthen research already under way on wave energy and floating offshore PV panels.
Similar wording in its 2026 programme (found automatically, not reviewed): No. 11
Energy
Large-scale & offshore renewables
–Il-politika dwar il-klima
PDF p. 29
9 Make long-term investment in offshore wind energy, presented as necessary for the 2050 zero-carbon goal.
Similar wording in its 2026 programme (found automatically, not reviewed): No. 12
Energy
Large-scale & offshore renewables
zero-carbon by 2050Il-politika dwar il-klima
PDF p. 29
10 Set feed-in tariffs, subsidies and incentives for renewables over a long horizon, for example 20 years, to give investment certainty.
Similar wording in its 2026 programme (found automatically, not reviewed): No. 13
Energy
Large-scale & offshore renewables
e.g. 20 yearsIl-politika dwar il-klima
PDF p. 29
11 Require, with immediate effect, every new building to have a solar water heater. Energy
Rooftop & community generation
immediatelyIl-politika dwar il-klima
PDF p. 29
12 Extract as much methane as possible from organic waste, including farm manure, and use it to generate electricity. Energy
Large-scale & offshore renewables
–Il-politika dwar il-klima
PDF p. 29
13 Government to buy renewable electricity via the interconnector and agree renewable-energy cooperation with Sicily. Energy
Large-scale & offshore renewables
–Il-politika dwar il-klima
PDF p. 29
14 Set up an enforced national system to collect waste vegetable oil and turn it into biodiesel for power stations. Energy
Gas, hydrogen & energy security
–Il-politika dwar il-klima
PDF p. 29
15 Oblige every large company, including banks, insurers and financial-services firms, to show how they will become zero-carbon before 2050.
Similar wording in its 2026 programme (found automatically, not reviewed): No. 14, No. clim-03
Climate
Business & industry transition
zero-carbon before 2050Il-politika dwar il-klima
PDF p. 29
16 Tie all state aid to companies, immediately, to climate-friendly changes in operations, fewer redundancies, equal pay and retraining for a green, circular economy.
Similar wording in its 2026 programme (found automatically, not reviewed): No. 15
Climate
Business & industry transition
immediatelyIl-politika dwar il-klima
PDF p. 30
clim-02 Malta's climate-change targets should no longer be set at the minimum possible. Climate
Climate targets
–Il-politika dwar il-klima
PDF p. 30
env-01 Make the Constitution's environmental principles enforceable, so citizens can ask the courts to compel government action on environmental matters.
Similar wording in its 2026 programme (found automatically, not reviewed): No. env-05
Environmental governance
Rights, transparency & participation
–L-ambjent
PDF p. 35
env-02 Give environmental NGOs financial assistance from the state.
Similar wording in its 2026 programme (found automatically, not reviewed): No. env-06
Environmental governance
Rights, transparency & participation
–L-ambjent
PDF p. 35
acc-01 Publish a definitive map of all public footpaths.
Similar wording in its 2026 programme (found automatically, not reviewed): No. acc-01
Countryside & coast
Countryside access & recreation
–Id-dritt ta' aċċess għall-kampanja
PDF p. 37
acc-02 Ensure that all traditional footpaths are open and accessible to everyone.
Similar wording in its 2026 programme (found automatically, not reviewed): No. acc-02, No. acc-04
Countryside & coast
Countryside access & recreation
–Id-dritt ta' aċċess għall-kampanja
PDF p. 37
acc-03 No footpath should be blocked by a gate unless there is proof the land is private.
Similar wording in its 2026 programme (found automatically, not reviewed): No. acc-03
Countryside & coast
Countryside access & recreation
–Id-dritt ta' aċċess għall-kampanja
PDF p. 37
acc-04 Footpaths on public land leased to farmers should remain open to the public.
Similar wording in its 2026 programme (found automatically, not reviewed): No. acc-04
Countryside & coast
Countryside access & recreation
–Id-dritt ta' aċċess għall-kampanja
PDF p. 37
acc-05 Create a national agency to manage existing walking trails and implement those planned in local plans.
Similar wording in its 2026 programme (found automatically, not reviewed): No. acc-05
Countryside & coast
Countryside access & recreation
–Id-dritt ta' aċċess għall-kampanja
PDF p. 37
acc-06 Create Malta's first National Trail along the Victoria Lines.
Similar wording in its 2026 programme (found automatically, not reviewed): No. acc-06
Countryside & coast
Countryside access & recreation
–Id-dritt ta' aċċess għall-kampanja
PDF p. 37
land-01 Update local plans regularly and redraw many of them.
Similar wording in its 2026 programme (found automatically, not reviewed): No. lp-02
Land use & planning
Planning system & reform
–L-użu tal-art u l-baħar
PDF p. 39
land-02 Revoke the 2006 rationalisation scheme that made about two million square metres developable, protecting the parts still undeveloped.
Similar wording in its 2026 programme (found automatically, not reviewed): No. odz-01
Land use & planning
ODZ & land protection
c. 2 million m2 (2006 scheme)L-użu tal-art u l-baħar
PDF p. 39
land-03 Take back streets for people, turning public space now used by cars into public space for people via a transport decarbonisation plan. Transport
Less traffic, more room for people
–L-użu tal-art u l-baħar
PDF p. 39
land-04 Opposes the proposed motor-racing track (at Ħal Far), citing noise and ecological impacts on nearby communities. Land use & planning
ODZ & land protection
–L-użu tal-art u l-baħar
PDF p. 39
land-05 Return Manoel Island and Fort Manoel to public ownership as undeveloped open space. Parks & trees
National parks & valleys
–L-użu tal-art u l-baħar
PDF p. 39
land-06 Opposes a yacht marina at Wied il-Għajn bay as a disproportionate local-plan proposal and pledges to stay vigilant. Land use & planning
ODZ & land protection
–L-użu tal-art u l-baħar
PDF p. 39
land-07 Keep Balluta, Xemxija and other bathing bays free of unnecessary development and commercialisation. Countryside & coast
Coast, beaches & public domain
–L-użu tal-art u l-baħar
PDF p. 39
odz-01 Give local councils effective power, directly or through local referenda, to stop projects outside the development zone unless Parliament approves them as nationally needed. Land use & planning
ODZ & land protection
–ODZ: barra miż-żona ta' żvilupp
PDF p. 41
board-01 Apply parliamentary scrutiny before appointment to all members of the Planning, Lands and Environment and Resources authority boards.
Similar wording in its 2026 programme (found automatically, not reviewed): No. board-01
Environmental governance
Regulators & boards
–Il-bordijiet li jieħdu d-deċiżjonijiet
PDF p. 45
board-02 Laws should give civil society proper representation on these boards, chosen by civil society itself rather than vetted by the minister.
Similar wording in its 2026 programme (found automatically, not reviewed): No. board-02
Environmental governance
Regulators & boards
–Il-bordijiet li jieħdu d-deċiżjonijiet
PDF p. 45
board-03 Remove representation of the parliamentary political parties from these decision-making boards.
Similar wording in its 2026 programme (found automatically, not reviewed): No. board-03
Environmental governance
Regulators & boards
–Il-bordijiet li jieħdu d-deċiżjonijiet
PDF p. 45
board-04 Parliament's standing committees should continuously oversee these authorities and report with proposals for action.
Similar wording in its 2026 programme (found automatically, not reviewed): No. board-04
Environmental governance
Regulators & boards
–Il-bordijiet li jieħdu d-deċiżjonijiet
PDF p. 45
board-05 Set clear conduct rules for board members, including a register of their assets.
Similar wording in its 2026 programme (found automatically, not reviewed): No. board-05
Environmental governance
Regulators & boards
–Il-bordijiet li jieħdu d-deċiżjonijiet
PDF p. 45
board-06 No one should be appointed to these boards for long periods.
Similar wording in its 2026 programme (found automatically, not reviewed): No. board-06
Environmental governance
Regulators & boards
–Il-bordijiet li jieħdu d-deċiżjonijiet
PDF p. 45
sd-01 Give the Guardian of Future Generations the capacity to scrutinise the government's work.
Similar wording in its 2026 programme (found automatically, not reviewed): No. sd-01
Environmental governance
Rights, transparency & participation
–L-iżvilupp sostenibbli
PDF p. 47
water-01 Store more rainwater. Water
Rainwater, groundwater & reuse
–L-ilma
PDF p. 49
water-02 Monitor buildings now going up more closely, so they provide for rainwater storage.
Similar wording in its 2026 programme (found automatically, not reviewed): No. water-01
Water
Rainwater, groundwater & reuse
–L-ilma
PDF p. 49
water-03 State aid schemes should increasingly help owners improve water storage in existing buildings.
Similar wording in its 2026 programme (found automatically, not reviewed): No. water-02
Water
Rainwater, groundwater & reuse
–L-ilma
PDF p. 49
water-04 Pay more attention to using treated sewage effluent, particularly in agriculture.
Similar wording in its 2026 programme (found automatically, not reviewed): No. water-03
Water
Rainwater, groundwater & reuse
–L-ilma
PDF p. 49
waste-01 The tourism industry should be made to control the waste, especially organic waste, that it generates. Waste
Waste prevention & reuse
–Il-politika dwar l-iskart
PDF p. 53
waste-02 Do more to cut the waste generated (waste minimisation) and recycle much more of it. Waste
Waste prevention & reuse
–Il-politika dwar l-iskart
PDF p. 53
waste-03 Opposes the government's planned waste incinerator at Magħtab, arguing that it would discourage recycling.
Similar wording in its 2026 programme (found automatically, not reviewed): No. waste-09
Waste
Treatment & disposal
–Il-politika dwar l-iskart
PDF p. 53
Partit Laburista (Labour Party) · 129 pledges

Malta Flimkien: Manifest Elettorali 2022. Covered: chapter 05 (environment), chapter 06 (climate neutral).

No.Pledge (our summary)SubjectTargetSection and page
305 Launch a wide action plan for tree planting and afforestation, committing to 100,000 trees planted in the next five years.
Checked: CC-010 Tree-planting counts (Largely supported)
Similar wording in its 2026 programme (found automatically, not reviewed): No. 14.43
Parks & trees
Trees & afforestation
100,000 trees; five yearsAfforestazzjoni
PDF p. 91 (printed p. 89)
378 Climate neutrality by 2050 and a drastic cut in emissions by 2030, through the renovation strategy, the low carbon strategy and the National Energy and Climate Plan. Climate
Climate targets
climate neutral by 2050; emissions cut by 2030Enerġija nadifa, affidabbli u affordabbli (chapter 06, Malta gżira climate neutral)
PDF p. 108 (printed p. 106)
397 Work with the private sector for investment in offshore renewable energy, including floating wind and solar technologies. Energy
Large-scale & offshore renewables
–It-triq għad-dikarbonizzazzjoni (chapter 06, Malta gżira climate neutral)
PDF p. 111 (printed p. 109)
284 Allocate funds to create new urban green spaces, parks, pedestrian zones in every locality and underground car parks, prioritising central and southern Malta. Parks & trees
Green space policy & greening
€700 million; seven yearsL-akbar investiment fl-ambjent (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 88 (printed p. 86)
285 Apply urban green reclamation: convert existing public buildings or buy private buildings to regenerate them as community open spaces in areas lacking them. Parks & trees
Green space policy & greening
–L-akbar investiment fl-ambjent (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 88 (printed p. 86)
286 Negotiate with private owners of open spaces and large gardens, mainly in urban cores, to lease or buy them and open them to the public. Parks & trees
Green space policy & greening
–L-akbar investiment fl-ambjent (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 88 (printed p. 86)
287 Demarcate public land and paths in the countryside, design nature trails across Malta and Gozo, and create a mobile app guiding people to public areas. Countryside & coast
Countryside access & recreation
–L-akbar investiment fl-ambjent (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 88 (printed p. 86)
288 Promote green networks linking urban areas to the countryside, joining open spaces along the route, possibly from Mellieħa to Xgħajra, with similar routes in Gozo. Countryside & coast
Countryside access & recreation
–L-akbar investiment fl-ambjent (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 88 (printed p. 86)
289 Complete the Ta’ Qali National Park, enlarging the open space and planting new trees with landscaping, for public recreation, physical and cultural activities. Parks & trees
National parks & valleys
more than 60 football pitches in size; over 60,000 new trees; more than 86,000 m2 of landscapingProġetti ambjentali ambizzjużi għall-benesseri ta’ kulħadd (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 89 (printed p. 87)
290 Carry out the Triq Sant’Anna project, Floriana: open the Lion-to-War Memorial area to the public, traffic underground, with a pedestrian link to Valletta. Parks & trees
Urban parks & squares
–Proġetti ambjentali ambizzjużi għall-benesseri ta’ kulħadd (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 89 (printed p. 87)
291 Regenerate the car park area in Triq San Pawl, Bormla, into an open space, with underground parking for residents and visitors to Bormla and Isla.
Similar wording in its 2026 programme (found automatically, not reviewed): No. 14.30
Parks & trees
Urban parks & squares
–Proġetti ambjentali ambizzjużi għall-benesseri ta’ kulħadd (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 89 (printed p. 87)
292 Start roofing over the area outside the Santa Venera tunnels, creating open spaces, a garden and public facilities on top.
Similar wording in its 2026 programme (found automatically, not reviewed): No. 14.34
Parks & trees
Urban parks & squares
–Proġetti ambjentali ambizzjużi għall-benesseri ta’ kulħadd (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 89 (printed p. 87)
293 Launch a study on a similar project in Triq Diċembru Tlettax, Marsa, to reconnect the locality currently divided in two. Parks & trees
Urban parks & squares
–Proġetti ambjentali ambizzjużi għall-benesseri ta’ kulħadd (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 89 (printed p. 87)
294 Roof over part of the water channel along Triq il-Qasab, Birkirkara, without reducing water flow, creating a new green space.
Similar wording in its 2026 programme (found automatically, not reviewed): No. 14.35
Parks & trees
Urban parks & squares
–Proġetti ambjentali ambizzjużi għall-benesseri ta’ kulħadd (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 89 (printed p. 87)
295 Demolish the milk factory in Ħamrun and replace it with an underground car park topped by a green open space. Parks & trees
Urban parks & squares
more than ten tumoli (għaxar tomniet)Proġetti ambjentali ambizzjużi għall-benesseri ta’ kulħadd (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 90 (printed p. 88)
296 Extend Ġnien Karin Grech, San Ġwann, with a new square and green space, a proposed traffic tunnel and underground parking.
Similar wording in its 2026 programme (found automatically, not reviewed): No. 14.31
Parks & trees
Urban parks & squares
parking spaces doubled; open space three times the present sizeProġetti ambjentali ambizzjużi għall-benesseri ta’ kulħadd (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 90 (printed p. 88)
297 Complete announced urban greening projects in Ħaż-Żabbar, Ħamrun, Marsa, Mosta and Ħal Qormi as quickly as possible. Parks & trees
Urban parks & squares
–Proġetti ambjentali ambizzjużi għall-benesseri ta’ kulħadd (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 90 (printed p. 88)
298 Make Rinella garden, Kalkara, a sustainable garden with solar paving and smart benches and bins, then launch a maintenance programme making public gardens sustainable. Parks & trees
Urban parks & squares
–Proġetti ambjentali ambizzjużi għall-benesseri ta’ kulħadd (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 90 (printed p. 88)
299 Continue relocating processes from the Sant’Antnin recycling plant so it closes and becomes an educational nature park with underground parking for Marsaskala. Parks & trees
National parks & valleys
–Proġetti ambjentali ambizzjużi għall-benesseri ta’ kulħadd (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 90 (printed p. 88)
300 Create a nature park along the Baħar iċ-Ċagħaq coast with more trees and accessible walking trails. Parks & trees
National parks & valleys
–Proġetti ambjentali ambizzjużi għall-benesseri ta’ kulħadd (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 90 (printed p. 88)
301 Create Malta’s first geological park along the coast of Għar Lapsi and Wied iż-Żurrieq, for recreation and conservation. Parks & trees
National parks & valleys
–Proġetti ambjentali ambizzjużi għall-benesseri ta’ kulħadd (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 90 (printed p. 88)
302 Convert the Schreiber ground in Pace Grasso into an educational open space, planting trees and shrubs. Parks & trees
Urban parks & squares
–Proġetti ambjentali ambizzjużi għall-benesseri ta’ kulħadd (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 91 (printed p. 89)
303 Start work immediately on parks in Imqabba and Birgu to give residents more open space. Parks & trees
Urban parks & squares
two parks; immediatelyProġetti ambjentali ambizzjużi għall-benesseri ta’ kulħadd (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 91 (printed p. 89)
304 Restore Sant’Anton Gardens: repair walls, new paving and benches, and add a butterfly house and bird aviaries. Parks & trees
Urban parks & squares
–Proġetti ambjentali ambizzjużi għall-benesseri ta’ kulħadd (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 91 (printed p. 89)
306 Continue regenerating abandoned sites for public enjoyment, following former landfills at Wied Fulija (Żurrieq) and Il-Qortin (Xagħra). Parks & trees
National parks & valleys
–Afforestazzjoni (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 91 (printed p. 89)
307 Carry out the afforestation project at Inwadar Nature Park, protecting biodiversity and water management. Parks & trees
Trees & afforestation
€20 million; five yearsAfforestazzjoni (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 91 (printed p. 89)
308 Join the Żonqor area, after relocation of the planned project to Smart City, to the Inwadar Nature Park. Parks & trees
National parks & valleys
–Afforestazzjoni (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 91 (printed p. 89)
309 Complete the Bengħajsa afforestation project, planting indigenous trees and creating a family park. Parks & trees
Trees & afforestation
8,000 indigenous treesAfforestazzjoni (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 91 (printed p. 89)
310 Fully support afforestation initiatives led by NGOs and local councils across different localities. Parks & trees
Trees & afforestation
–Afforestazzjoni (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 91 (printed p. 89)
311 Work with primary schools and local councils so children learn about endemic trees and sow seedlings later planted in localities.
Similar wording in its 2026 programme (found automatically, not reviewed): No. 14.43
Parks & trees
Trees & afforestation
–Afforestazzjoni (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 92 (printed p. 90)
312 Launch a campaign gradually removing invasive alien trees from public rural areas and replacing them with indigenous trees.
Similar wording in its 2026 programme (found automatically, not reviewed): No. 14.47
Parks & trees
Trees & afforestation
–Afforestazzjoni (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 92 (printed p. 90)
313 Ambjent Malta to continue implementing Natura 2000 management plans: native planting, rubble walls, restoring wells and cisterns, irrigation, surveillance and firefighting. Nature & Wildlife
Habitats & species
–Ħarsien xieraq tal-ambjent (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 92 (printed p. 90)
314 Start a valley conservation programme to protect biodiversity and rainwater channels. Nature & Wildlife
Habitats & species
–Ħarsien xieraq tal-ambjent (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 92 (printed p. 90)
315 Maintain the Chadwick Lakes area and add initiatives improving access for farmers and the public. Parks & trees
National parks & valleys
–Ħarsien xieraq tal-ambjent (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 92 (printed p. 90)
316 Give the Environment and Resources Authority (ERA) new powers and resources to regulate more effectively. Environmental governance
Regulators & boards
–Ħarsien xieraq tal-ambjent (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 92 (printed p. 90)
317 If land outside development zones is needed for a public school or hospital, turn equivalent public land within them into open space (no-net land take). Land use & planning
ODZ & land protection
–Ħarsien xieraq tal-ambjent (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 92 (printed p. 90)
318 Continue afforestation and conservation projects on Kemmuna and set up nature trails to reduce pressure on habitats. Nature & Wildlife
Habitats & species
–Ħarsien xieraq tal-ambjent (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 92 (printed p. 90)
319 Ensure Ħondoq ir-Rummien is not developed in any way and carry out embellishment works at the bay. Land use & planning
ODZ & land protection
–Ħarsien xieraq tal-ambjent (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 93 (printed p. 91)
320 Link Natura 2000 sites with ecological corridors in Mellieħa and the Victoria Lines, establishing a first national trail along the Victoria Lines. Nature & Wildlife
Habitats & species
two corridors in Mellieħa; one in the Victoria Lines areaProtezzjoni tal-bijodiversità (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 93 (printed p. 91)
321 Complete the National Genetic Bank at Ħal Lija to preserve native plant species and strengthen research on genetic resources, including agriculture. Nature & Wildlife
Habitats & species
–Protezzjoni tal-bijodiversità (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 93 (printed p. 91)
322 Draw up a register of Maltese flora and fauna to monitor conservation of local habitats and species. Nature & Wildlife
Habitats & species
–Protezzjoni tal-bijodiversità (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 93 (printed p. 91)
323 Create a garden network in Floriana integrating gardens with Argotti Gardens as an accessible green network supporting biodiversity.
Similar wording in its 2026 programme (found automatically, not reviewed): No. 14.15
Parks & trees
Urban parks & squares
more than 92,000m2 of gardensProtezzjoni tal-bijodiversità (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 93 (printed p. 91)
324 Run conservation programmes for native species including the wild rabbit, and extend the barn owl reintroduction project to Magħtab. Nature & Wildlife
Habitats & species
–Protezzjoni tal-bijodiversità (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 93 (printed p. 91)
325 Develop management plans for protected marine areas, leading to Malta’s first marine park at Ċirkewwa. Nature & Wildlife
Marine & coastal protection
–Protezzjoni tal-bijodiversità (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 93 (printed p. 91)
326 Continue work at Il-Magħluq, Marsaxlokk, including measures against coastal erosion and to protect the bay and adjacent Natura 2000 site. Nature & Wildlife
Marine & coastal protection
–Protezzjoni tal-bijodiversità (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 94 (printed p. 92)
327 Strengthen enforcement against littering and raise awareness about it. Waste
Litter & street cleaning
–Ambjent nadif (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 94 (printed p. 92)
328 Invest in more resources and machinery for difficult places and consolidate the work of entities cleaning public areas. Waste
Litter & street cleaning
–Ambjent nadif (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 94 (printed p. 92)
329 Transform highly urbanised localities into green cities with open spaces, pocket parks, green walls, roof gardens, permanent pedestrian zones and possible underground parking. Parks & trees
Green space policy & greening
–Green cities għal benesseri ta’ kulħadd (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 94 (printed p. 92)
330 Launch new schemes encouraging residents to green the façades and roofs of their homes. Parks & trees
Green space policy & greening
–Green cities għal benesseri ta’ kulħadd (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 94 (printed p. 92)
331 Create roof gardens on public buildings in village cores and use other public roofs to generate clean energy. Parks & trees
Green space policy & greening
–Green cities għal benesseri ta’ kulħadd (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 94 (printed p. 92)
332 Continue removing overhead service wires and cables, prioritising squares and old village and town centres. Land use & planning
Heritage & townscape
–Green cities għal benesseri ta’ kulħadd (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 96 (printed p. 94)
333 Prioritise underground car parks with open spaces on top, with local councils, also addressing flooding and storing rainwater. Parks & trees
Green space policy & greening
–Green cities għal benesseri ta’ kulħadd (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 96 (printed p. 94)
334 Identify sites outside locality centres, with local councils, to serve as park-and-ride for surrounding villages. Transport
Less traffic, more room for people
–Green cities għal benesseri ta’ kulħadd (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 96 (printed p. 94)
335 Launch a pilot project of community gardens where residents can grow vegetables, fruit and flowers. Parks & trees
Green space policy & greening
–Green cities għal benesseri ta’ kulħadd (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 96 (printed p. 94)
336 Start discussions on stricter rules for development proposed in outside development zones (ODZ), respecting owners’ rights. Land use & planning
ODZ & land protection
–Ippjanar bi ħsieb (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 96 (printed p. 94)
337 Implement the updated Strategic Plan for Environment and Development (SPED) with new indicators to track its environmental aims. Land use & planning
Planning system & reform
–Ippjanar bi ħsieb (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 96 (printed p. 94)
338 Make urban conservation areas (UCAs) irrevocable except for extension, and introduce buffer zones around them. Land use & planning
Heritage & townscape
–Ippjanar bi ħsieb (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 96 (printed p. 94)
339 Protect grade 2 scheduled buildings with new incentives for owners to restore them and open them to the public where possible. Land use & planning
Heritage & townscape
–Ippjanar bi ħsieb (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 96 (printed p. 94)
340 Draw up a building aesthetics policy with clear standards respecting old village cores and the Maltese and Gozitan landscape. Land use & planning
Building height & design
–Ippjanar bi ħsieb (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 97 (printed p. 95)
341 Introduce a skyline policy balancing high-rise needs with locality identity, views and residents’ interests, particularly in Gozo. Land use & planning
Building height & design
–Ippjanar bi ħsieb (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 97 (printed p. 95)
342 Give greater weight to environmental aspects and renewable energy in development permits, prioritising projects as close to carbon-neutral as possible. Land use & planning
Permits, appeals & enforcement
–Ippjanar bi ħsieb (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 97 (printed p. 95)
343 Introduce incentives for sustainable new and renovated buildings based on energy efficiency, daylight, EV charging, waste treatment, aesthetics and greening. Energy
Energy efficiency
–Ippjanar bi ħsieb (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 97 (printed p. 95)
344 Continue strengthening the Building and Construction Authority, especially for people affected by nearby development. Land use & planning
Construction & neighbours
–Regolamentazzjoni għas-settur tal-kostruzzjoni (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 97 (printed p. 95)
345 Require set timelines and coordination for every construction project to reduce inconvenience and increase enforcement. Land use & planning
Construction & neighbours
–Regolamentazzjoni għas-settur tal-kostruzzjoni (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 98 (printed p. 96)
346 Bring national building codes into force, consolidating and updating present laws with new standards. Land use & planning
Construction & neighbours
–Regolamentazzjoni għas-settur tal-kostruzzjoni (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 98 (printed p. 96)
347 Introduce laws to regulate construction better, including contractor licensing and upskilling of workers. Land use & planning
Construction & neighbours
–Regolamentazzjoni għas-settur tal-kostruzzjoni (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 98 (printed p. 96)
348 Implement the Long Term Waste Management Plan to reduce waste, advance processing systems and create business opportunities in a circular economy. Waste
Treatment & disposal
–Trattament effettiv tal-iskart (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 98 (printed p. 96)
349 Build the Ecohive waste-to-energy plant to end dependence on landfill and generate energy from waste. Waste
Treatment & disposal
about 4.5% of the country’s energyTrattament effettiv tal-iskart (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 98 (printed p. 96)
350 Work on a pilot underground refuse collection project to reduce visual impact, odours and inconvenience. Waste
Litter & street cleaning
–Trattament effettiv tal-iskart (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 98 (printed p. 96)
351 Identify sites for more bulky waste civic amenity sites in Malta and Gozo, also accepting household glass, plastic and paper. Waste
Recycling & separation
–Trattament effettiv tal-iskart (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 99 (printed p. 97)
352 Add reuse centres within bulky waste sites and study a repair centre for items about to be discarded.
Similar wording in its 2026 programme (found automatically, not reviewed): No. 14.56
Waste
Waste prevention & reuse
–Trattament effettiv tal-iskart (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 99 (printed p. 97)
353 Install plastic bottle return machines nationwide and extend the Beverage Container Refund Scheme to other plastic containers. Waste
Recycling & separation
–Trattament effettiv tal-iskart (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 99 (printed p. 97)
354 Rehabilitate abandoned quarries for storage, industry, construction waste or water conservation, using their faces for afforestation or renewable energy. Waste
Construction & demolition waste
–Trattament effettiv tal-iskart (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 99 (printed p. 97)
355 Explore waste mining at sites such as Għallis and Ta’ Żwejra to recover recyclable material and raise waste-to-energy output. Waste
Treatment & disposal
–Trattament effettiv tal-iskart (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 99 (printed p. 97)
356 Encourage recycled construction materials, including franka stone and reconstituted stone, and require a balance of used and new material in public projects. Waste
Construction & demolition waste
–Trattament effettiv tal-iskart (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 99 (printed p. 97)
357 Start a scheme collecting unused clothes for recycling. Waste
Recycling & separation
–Trattament effettiv tal-iskart (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 100 (printed p. 98)
358 Work with takeaway food outlets on guidelines for lower-impact food container alternatives. Waste
Waste prevention & reuse
–Trattament effettiv tal-iskart (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 100 (printed p. 98)
359 Launch a pilot with hotels and restaurants to help them invest in anaerobic digesters turning food waste into biogas for cooking. Waste
Waste prevention & reuse
–Trattament effettiv tal-iskart (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 100 (printed p. 98)
360 Regenerate sites for caravanning, camping and picnics, starting at Taħt l-Għallis (Baħar iċ-Ċagħaq) and Ramlet il-Qortin (Mellieħa). Countryside & coast
Countryside access & recreation
–Rikreazzjoni u delizzji (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 100 (printed p. 98)
361 Provide clear signage and walking trails in as many publicly accessible rural areas as possible. Countryside & coast
Countryside access & recreation
–Rikreazzjoni u delizzji (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 100 (printed p. 98)
362 Dedicate areas at Miżieb and l-Aħrax tal-Mellieħa to picnics and camping all year round. Countryside & coast
Countryside access & recreation
two areas; all year roundRikreazzjoni u delizzji (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 101 (printed p. 99)
363 Launch a policy so that mrejkba fishing continues sustainably and practitioners’ interests are protected. Nature & Wildlife
Fishing & fish farms
–Rikreazzjoni u delizzji (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 101 (printed p. 99)
364 Keep allowing recreational fishers to fish lampuki near the coast and continue allocating part of the tuna quota to recreational fishers. Nature & Wildlife
Fishing & fish farms
–Rikreazzjoni u delizzji (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 101 (printed p. 99)
365 Maintain hunting and trapping practice in line with EU directives, safeguarding trapping and the spring hunting season.
Similar wording in its 2026 programme (found automatically, not reviewed): No. 14.63
Nature & Wildlife
Hunting & trapping
–Rikreazzjoni u delizzji (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 101 (printed p. 99)
366 Work with hunters’ associations and local and foreign experts to expand research on turtle dove migration routes over Malta.
Similar wording in its 2026 programme (found automatically, not reviewed): No. 14.64
Nature & Wildlife
Hunting & trapping
–Rikreazzjoni u delizzji (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 101 (printed p. 99)
367 Introduce a national animal welfare strategy and set standards for breeders, trainers, groomers and pet sitters. Animal welfare
Animal welfare law & enforcement
–Aktar ħarsien u drittijiet għall-annimali (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 102 (printed p. 100)
368 Change the law so the Animal Welfare Directorate can remove animals in poor conditions before a final court decision. Animal welfare
Animal welfare law & enforcement
–Aktar ħarsien u drittijiet għall-annimali (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 102 (printed p. 100)
369 Extend the Adopt a Pet Allowance, strengthen adoption campaigns and develop a central digital adoption platform. Animal welfare
Shelters, strays & adoption
–Aktar ħarsien u drittijiet għall-annimali (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 102 (printed p. 100)
370 Open a modern rehoming centre for stray and surrendered animals, also sheltering horses and other abandoned animals. Animal welfare
Shelters, strays & adoption
–Aktar ħarsien u drittijiet għall-annimali (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 102 (printed p. 100)
371 Launch a free national neutering campaign for dogs and cats. Animal welfare
Veterinary care & neutering
–Aktar ħarsien u drittijiet għall-annimali (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 102 (printed p. 100)
372 Start a process for domestic cats to be microchipped. Animal welfare
Animal welfare law & enforcement
–Aktar ħarsien u drittijiet għall-annimali (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 102 (printed p. 100)
373 Open the animal cemetery at Ta’ Qali. Animal welfare
Pets in public life
next legislatureAktar ħarsien u drittijiet għall-annimali (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 102 (printed p. 100)
374 Add dog swimming zones and evaluate existing ones to make them safer and more accessible. Animal welfare
Pets in public life
–Aktar ħarsien u drittijiet għall-annimali (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 102 (printed p. 100)
375 Continue supporting animal sanctuaries, including direct help with repairs and maintenance. Animal welfare
Shelters, strays & adoption
–Aktar ħarsien u drittijiet għall-annimali (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 103 (printed p. 101)
376 Consider a public-private partnership to set up an equestrian centre for year-round show jumping and dressage. Animal welfare
Pets in public life
–Aktar ħarsien u drittijiet għall-annimali (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 103 (printed p. 101)
377 Continue helping local councils set up cat cafes and identify more areas for dog parks. Animal welfare
Pets in public life
–Aktar ħarsien u drittijiet għall-annimali (chapter 05, L-ambjent għal kwalità tal-ħajja aħjar)
PDF p. 103 (printed p. 101)
379 Host a conference with neighbouring Mediterranean countries to develop collaborative climate initiatives with tangible targets. Climate
Climate policy & institutions
–Enerġija nadifa, affidabbli u affordabbli (chapter 06, Malta gżira climate neutral)
PDF p. 108 (printed p. 106)
380 Complete the second Malta–Italy electricity interconnector, increasing supply security, cutting carbon dioxide emissions and enabling more renewable investment. Energy
Grid, interconnectors & storage
2025; 58% cut in carbon dioxide emissionsProvvista sigura tal-elettriku (chapter 06, Malta gżira climate neutral)
PDF p. 108 (printed p. 106)
381 Build a new distribution link between the interconnector terminal at Magħtab and the main distribution centre at Mosta. Energy
Grid, interconnectors & storage
–Provvista sigura tal-elettriku (chapter 06, Malta gżira climate neutral)
PDF p. 108 (printed p. 106)
382 Continue major investment in the electricity distribution network to meet rising demand, reduce interruptions and speed up repairs. Energy
Grid, interconnectors & storage
–Provvista sigura tal-elettriku (chapter 06, Malta gżira climate neutral)
PDF p. 109 (printed p. 107)
383 Build new automated substations across Malta and Gozo over five years, without inconvenience to residents.
Similar wording in its 2026 programme (found automatically, not reviewed): No. 16.10
Energy
Grid, interconnectors & storage
about 200 substations; within five yearsProvvista sigura tal-elettriku (chapter 06, Malta gżira climate neutral)
PDF p. 109 (printed p. 107)
384 Build a new distribution centre in the Naxxar area to improve supply to nearby localities including Mosta, Għargħur and Baħar iċ-Ċagħaq. Energy
Grid, interconnectors & storage
–Provvista sigura tal-elettriku (chapter 06, Malta gżira climate neutral)
PDF p. 109 (printed p. 107)
385 Expand the Marsaskala distribution centre, freeing capacity at Ħal Tarxien, and also expand the Imrieħel distribution centre. Energy
Grid, interconnectors & storage
–Provvista sigura tal-elettriku (chapter 06, Malta gżira climate neutral)
PDF p. 109 (printed p. 107)
386 Strengthen water conservation through improved infrastructure, water catchment systems in Malta and Gozo, restoring old reservoirs and building new ones. Water
Rainwater, groundwater & reuse
–Ilma (chapter 06, Malta gżira climate neutral)
PDF p. 109 (printed p. 107)
387 Launch an extensive programme to upgrade water distribution facilities and network nationwide to improve tap water quality. Water
Drinking water supply
–Ilma (chapter 06, Malta gżira climate neutral)
PDF p. 109 (printed p. 107)
388 Improve wastewater treatment and sewerage infrastructure, especially in the north and south, to meet demand and protect the marine environment. Water
Sewage & wastewater
–Ilma (chapter 06, Malta gżira climate neutral)
PDF p. 109 (printed p. 107)
389 Complete the underground tunnel between the Pembroke reverse osmosis plant and the Ta’ Qali reservoir to improve tap water quality and efficiency. Water
Drinking water supply
–Ilma (chapter 06, Malta gżira climate neutral)
PDF p. 109 (printed p. 107)
390 Offer free water-consumption audits to households and micro SMEs and continue installing water dispensers in public places. Water
Rainwater, groundwater & reuse
–Ilma (chapter 06, Malta gżira climate neutral)
PDF p. 110 (printed p. 108)
391 Launch a scheme letting consumers replace rooftop water tanks with tanks made of materials that prevent microbial growth. Water
Drinking water supply
–Ilma (chapter 06, Malta gżira climate neutral)
PDF p. 110 (printed p. 108)
392 Launch schemes to incentivise small-scale household grey-water treatment and reuse for irrigation and flushing. Water
Rainwater, groundwater & reuse
–Ilma (chapter 06, Malta gżira climate neutral)
PDF p. 110 (printed p. 108)
393 Set up an international centre of excellence on desalination and water treatment, offering research and training with the University of Malta. Water
Drinking water supply
–Ilma (chapter 06, Malta gżira climate neutral)
PDF p. 110 (printed p. 108)
394 Help coastal commercial establishments invest in on-site seawater desalination and sewage treatment technology. Water
Sewage & wastewater
–Ilma (chapter 06, Malta gżira climate neutral)
PDF p. 110 (printed p. 108)
395 Continue keeping energy prices in Malta under control to give families and businesses stability.
Similar wording in its 2026 programme (found automatically, not reviewed): No. 16.11
Energy
Bills & tariffs
–Kontijiet stabbli (chapter 06, Malta gżira climate neutral)
PDF p. 110 (printed p. 108)
396 Introduce a voluntary, regulator-set flat electricity rate without bands for rented residences, and pre-paid meters for rentals. Energy
Bills & tariffs
–Kontijiet stabbli (chapter 06, Malta gżira climate neutral)
PDF p. 111 (printed p. 109)
398 Invest in large-scale land-based battery storage and upgrade the electricity grid to accommodate large offshore renewable generation. Energy
Grid, interconnectors & storage
–It-triq għad-dikarbonizzazzjoni (chapter 06, Malta gżira climate neutral)
PDF p. 111 (printed p. 109)
399 Continue studies and technical preparations for a hydrogen project to supply clean energy, supporting decarbonisation goals.
Similar wording in its 2026 programme (found automatically, not reviewed): No. 16.7
Energy
Gas, hydrogen & energy security
decarbonisation targets by 2050It-triq għad-dikarbonizzazzjoni (chapter 06, Malta gżira climate neutral)
PDF p. 111 (printed p. 109)
400 Launch a national plan on hydrogen use to prepare industry and put the necessary infrastructure in place. Energy
Gas, hydrogen & energy security
–It-triq għad-dikarbonizzazzjoni (chapter 06, Malta gżira climate neutral)
PDF p. 111 (printed p. 109)
401 Start a process to make government agencies and departments climate neutral, installing rooftop solar panels with surplus fed to the national grid. Energy
Rooftop & community generation
–It-triq għad-dikarbonizzazzjoni (chapter 06, Malta gżira climate neutral)
PDF p. 111 (printed p. 109)
402 Continue incentivising solar farms and support investment schemes for people without roof space for solar panels. Energy
Large-scale & offshore renewables
–It-triq għad-dikarbonizzazzjoni (chapter 06, Malta gżira climate neutral)
PDF p. 112 (printed p. 110)
403 Launch a study with academics and farmers on agricultural projects that generate renewable energy without affecting farm output. Energy
Large-scale & offshore renewables
–It-triq għad-dikarbonizzazzjoni (chapter 06, Malta gżira climate neutral)
PDF p. 112 (printed p. 110)
404 Strengthen household grant schemes for solar water heaters, PV panels, roof insulation, heat pumps, double glazing, batteries and well maintenance. Energy
Rooftop & community generation
–Id-djar sors t’enerġija nadifa (chapter 06, Malta gżira climate neutral)
PDF p. 112 (printed p. 110)
405 Give additional help to first-time buyers and low- and middle-income families investing in their home's energy performance. Energy
Energy efficiency
–Id-djar sors t’enerġija nadifa (chapter 06, Malta gżira climate neutral)
PDF p. 112 (printed p. 110)
406 Require new buildings built to the maximum height allowed in the local plan to install renewable energy systems. Energy
Rooftop & community generation
–Obbligi ambjentali għal binjiet ġodda (chapter 06, Malta gżira climate neutral)
PDF p. 112 (printed p. 110)
407 Require new commercial buildings, offices and schools, and major renovations of large buildings, to install renewable energy systems. Energy
Rooftop & community generation
–Obbligi ambjentali għal binjiet ġodda (chapter 06, Malta gżira climate neutral)
PDF p. 112 (printed p. 110)
408 Offer free energy audits and financial aid to micro and small enterprises via Malta Enterprise, with tax credits for those meeting standards. Energy
Energy efficiency
–Industrija sostenibbli (chapter 06, Malta gżira climate neutral)
PDF p. 113 (printed p. 111)
409 Support the platform launched in November 2021 helping enterprises meet ESG credentials and Corporate Sustainability Reporting Directive targets. Climate
Business & industry transition
–Industrija sostenibbli (chapter 06, Malta gżira climate neutral)
PDF p. 113 (printed p. 111)
410 Work with the private sector on a logistics model increasing use of electric or clean-fuel, such as hydrogen, heavy goods vehicles. Transport
Cleaner vehicles
–Industrija sostenibbli (chapter 06, Malta gżira climate neutral)
PDF p. 113 (printed p. 111)
411 Complete the Grand Harbour shore-to-ship project, cutting ship pollution and improving air quality, and start another shore-to-ship project at the Freeport.
Similar wording in its 2026 programme (found automatically, not reviewed): No. 16.37
Air & noise
Ships, port & aviation emissions
90% cut in pollution from ships entering the Grand Harbour; about 17,000 familiesIndustrija sostenibbli (chapter 06, Malta gżira climate neutral)
PDF p. 113 (printed p. 111)
412 Incentivise research through investment and tax credits to attract innovative start-ups working on climate, decarbonisation and renewable technologies. Climate
Business & industry transition
–Industrija sostenibbli (chapter 06, Malta gżira climate neutral)
PDF p. 113 (printed p. 111)
Partit Nazzjonalista (Nationalist Party) · 53 pledges

Viżjoni Għal Malta 2030 +1. Covered: Tema 4, environment (pledges 169–210, including its agriculture and fisheries section); Tema 5, energy section only (211–221).

No.Pledge (our summary)SubjectTargetSection and page
169 Set a national target to make Malta climate-neutral as soon as possible, reaching at least 80% of that target by 2030. Climate
Climate targets
at least 80% of climate-neutrality target; 2030Politika Ambjentali Effettiva
PDF p. 66 (printed p. 131)
170 Set up an agency responsible for implementing the measures in the National Climate Change Strategy to reach the climate-neutrality target. Climate
Climate policy & institutions
–Politika Ambjentali Effettiva
PDF p. 66 (printed p. 131)
171 Build an environmental alliance with a shared environmental, climate and ecological agenda reflecting the Constitution's environmental provisions. Environmental governance
Sustainability strategy
–Politika Ambjentali Effettiva
PDF p. 66 (printed p. 131)
172 Have this alliance draw up a ten-year Sustainability Agenda binding the government in all decisions affecting the natural environment. Environmental governance
Sustainability strategy
ten yearsPolitika Ambjentali Effettiva
PDF p. 66 (printed p. 131)
173 Use the Sustainability Agenda to redraft a comprehensive Strategic Plan for the Environment and Development giving clear direction for the natural environment. Land use & planning
Planning system & reform
–Politika Ambjentali Effettiva
PDF p. 66 (printed p. 131)
174 Use ESG environmental criteria to reshape the tax framework so that only non-polluting economic activities are incentivised and sustainability is rewarded. Environmental governance
Sustainability strategy
–Politika Ambjentali Effettiva
PDF p. 66 (printed p. 131)
175 Make legislative and governance changes so that environmental regulators operate with full autonomy and independence. Environmental governance
Regulators & boards
–Politika Ambjentali Effettiva
PDF p. 66 (printed p. 131)
176 Give environmental NGOs more votes on boards taking material decisions on environment, transport, infrastructure and planning, and require consultation at every level of such decisions. Environmental governance
Rights, transparency & participation
–Politika Ambjentali Effettiva
PDF p. 66 (printed p. 131)
177 Implement the Ombudsman's recommendations on environmental matters, respecting the office's role as a key safeguard of the natural environment. Environmental governance
Rights, transparency & participation
–Politika Ambjentali Effettiva
PDF p. 66 (printed p. 131)
178 Give environmental protection top priority when drafting every policy and law, to shield the environment from degradation. Environmental governance
Sustainability strategy
–Protezzjoni tal-Ambjent u s-Sostenibiltà
PDF p. 66 (printed p. 131)
179 Take a clear stand against excessive development and in favour of conservation through legislation, policy and enforcement. Land use & planning
Planning system & reform
–Protezzjoni tal-Ambjent u s-Sostenibiltà
PDF p. 66 (printed p. 131)
180 Require a two-thirds parliamentary vote before land outside the development zone can be brought into it. Land use & planning
ODZ & land protection
two-thirds of ParliamentProtezzjoni tal-Ambjent u s-Sostenibiltà
PDF p. 66 (printed p. 131)
181 Have the government add 50,000 square metres of public land to outside-development-zone areas every year. Land use & planning
ODZ & land protection
50,000 m2 per yearProtezzjoni tal-Ambjent u s-Sostenibiltà
PDF p. 66 (printed p. 131)
182 Fully support investments that reduce environmental impact, both in emissions and in land use. Environmental governance
Sustainability strategy
–Protezzjoni tal-Ambjent u s-Sostenibiltà
PDF p. 66 (printed p. 131)
183 Stop treating commercial development as an activity to be pursued regardless of the harm it may cause. Land use & planning
Planning system & reform
–Protezzjoni tal-Ambjent u s-Sostenibiltà
PDF p. 66 (printed p. 131)
184 Make sustainability in construction and development an integral part of regulation and of permitting by planning and environment authorities. Land use & planning
Permits, appeals & enforcement
–Protezzjoni tal-Ambjent u s-Sostenibiltà
PDF p. 66 (printed p. 131)
185 Oblige developers to provide alternative accommodation to neighbours of excavation sites during risky periods and lodge a deposit released immediately to people whose property is damaged. Land use & planning
Construction & neighbours
–Protezzjoni tal-Ambjent u s-Sostenibiltà
PDF p. 66 (printed p. 131)
186 Require started building projects to be completed within a legally set time, with fines and other enforcement if they are not. Land use & planning
Construction & neighbours
time limit to be set by law (not stated)Protezzjoni tal-Ambjent u s-Sostenibiltà
PDF p. 66 (printed p. 131)
187 Invest in focused, widespread work on a comprehensive policy to strengthen biodiversity as a top priority. Nature & Wildlife
Habitats & species
–Spazji Miftuħa, Pulmuni għas-Soċjetà
PDF p. 66 (printed p. 131)
188 Recreate open spaces: green lungs in towns, a strategy for family green areas, an agenda for growing woodlands, fountains and eco-parks. Parks & trees
Green space policy & greening
–Spazji Miftuħa, Pulmuni għas-Soċjetà
PDF p. 66 (printed p. 131)
189 Carry out the largest afforestation programme in Malta's history so every community in every town and village has its own green open space. Parks & trees
Trees & afforestation
–Spazji Miftuħa, Pulmuni għas-Soċjetà
PDF p. 66 (printed p. 131)
190 Run a comprehensive programme and set up a new structure to manage Natura 2000 sites, keeping them for families and safe from commercial development. Nature & Wildlife
Habitats & species
–Spazji Miftuħa, Pulmuni għas-Soċjetà
PDF p. 66 (printed p. 131)
191 Launch a programme to rehabilitate and conserve valleys, with emphasis on protecting their biodiversity. Nature & Wildlife
Habitats & species
–Spazji Miftuħa, Pulmuni għas-Soċjetà
PDF p. 67 (printed p. 133)
192 Extend protection to a larger number of marine protected areas, supporting the diving industry's environment. Nature & Wildlife
Marine & coastal protection
–Spazji Miftuħa, Pulmuni għas-Soċjetà
PDF p. 67 (printed p. 133)
193 Develop and promote high-level policy pillars for holistic, sustainable development of the ecological economy. Countryside & coast
Farming
–Politika Agrikola, il-Biedja u s-Sajd
PDF p. 67 (printed p. 133)
194 With all partners, draw up a strategic plan for agriculture and fisheries to strengthen the whole sector's ecosystem. Countryside & coast
Farming
–Politika Agrikola, il-Biedja u s-Sajd
PDF p. 67 (printed p. 133)
195 Support farmers and herders with technical help and targeted incentives to invest more in technology and become more competitive. Countryside & coast
Farming
–Politika Agrikola, il-Biedja u s-Sajd
PDF p. 67 (printed p. 133)
196 Promote Maltese produce via a produce-promotion agency, organic-production incentives, education, attracting young farmers, local-market support and lighter regulation and costs. Countryside & coast
Farming
–Politika Agrikola, il-Biedja u s-Sajd
PDF p. 67 (printed p. 133)
197 Introduce fair, transparent mechanisms on produce prices and viable earnings so farmers, herders and fishers can stay in the trade. Countryside & coast
Farming
–Politika Agrikola, il-Biedja u s-Sajd
PDF p. 67 (printed p. 133)
198 Offer incentives on investment, administrative costs and taxes to farmers who meet ESG criteria, to make farming more sustainable. Countryside & coast
Farming
–Politika Agrikola, il-Biedja u s-Sajd
PDF p. 67 (printed p. 133)
199 Invest to raise the operation of the Pitkalija, abattoir and fish market into efficient, modern, transparent centres of excellence. Countryside & coast
Farming
–Politika Agrikola, il-Biedja u s-Sajd
PDF p. 67 (printed p. 133)
200 Improve fishers' infrastructure and facilities, especially at Marsaxlokk and Xemxija. Nature & Wildlife
Fishing & fish farms
–Politika Agrikola, il-Biedja u s-Sajd
PDF p. 67 (printed p. 133)
201 Encourage innovation in waste management within a broader waste plan. Waste
Treatment & disposal
–Immaniġġjar tal-Iskart
PDF p. 67 (printed p. 133)
202 Introduce a much stricter legal framework regulating recycling and penalising single-use materials more heavily. Waste
Recycling & separation
–Immaniġġjar tal-Iskart
PDF p. 67 (printed p. 133)
203 Invest substantially, with local councils, in enough IoT-equipped smart bins across Malta and Gozo to prevent littering. Waste
Litter & street cleaning
–Immaniġġjar tal-Iskart
PDF p. 67 (printed p. 133)
204 Review the site-selection process and chosen model for the Magħtab incinerator project. Waste
Treatment & disposal
–Immaniġġjar tal-Iskart
PDF p. 67 (printed p. 133)
205 Introduce stricter measures on waste dumped at sea and waste generated by fish farms. Nature & Wildlife
Marine & coastal protection
–Immaniġġjar tal-Iskart
PDF p. 67 (printed p. 133)
206 Treat environmental pollution and degradation as a serious offence with major climate-change impact. Environmental governance
Sustainability strategy
–Immaniġġjar tal-Iskart
PDF p. 67 (printed p. 133)
207 Redraft a plan for water conservation and effective water management. Water
Rainwater, groundwater & reuse
–Immaniġġjar tal-Iskart
PDF p. 67 (printed p. 133)
208 Draw up and run an effective plan tackling the main causes of air pollution, aiming to meet and exceed EU targets on emissions and alternative-energy penetration. Air & noise
Air quality
meet and exceed EU targets (not quantified)Il-Kwalita’ tal-Arja
PDF p. 67 (printed p. 133)
209 Speed up emission cuts by tackling the largest cause through a holistic programme for widespread electric-vehicle use and more public transport. Transport
Cleaner vehicles
–Il-Kwalita’ tal-Arja
PDF p. 67 (printed p. 133)
210 With environmental NGOs, set up a research platform to gather evidence for policy on clean aviation, Single European Sky and alternative fuel technology. Air & noise
Ships, port & aviation emissions
–Il-Kwalita’ tal-Arja
PDF p. 67 (printed p. 133)
211 Refund all consumers the full amount the party says they were overcharged on electricity and water bills since 2013. Energy
Bills & tariffs
since 2013Politika tal-Enerġija
PDF p. 69 (printed p. 137)
212 Accelerate the shift to cleaner energy within a framework that secures supply. Energy
Gas, hydrogen & energy security
–Politika tal-Enerġija
PDF p. 69 (printed p. 137)
213 Draw up an energy policy sourcing power from the cheapest, lowest-emission sources while keeping full control over where electricity is bought and over distribution rights. Energy
Gas, hydrogen & energy security
–Politika tal-Enerġija
PDF p. 69 (printed p. 137)
214 Work to end the current Electrogas contracts and pass savings to households through cheaper bills and a 50% cut in meter charges for pensioners. Energy
Gas, hydrogen & energy security
50% cut in electricity and water meter charges for pensionersPolitika tal-Enerġija
PDF p. 69 (printed p. 137)
215 Increase renewable capacity by investing, with private-sector involvement, in a large-scale deep-sea offshore wind farm. Energy
Large-scale & offshore renewables
–Politika tal-Enerġija
PDF p. 69 (printed p. 137)
216 Invest substantially in the electricity distribution network to reduce power cuts and low-voltage incidents. Energy
Grid, interconnectors & storage
–Politika tal-Enerġija
PDF p. 69 (printed p. 137)
217 Invest in a gas pipeline to Sicily, able to carry hydrogen later, to buy gas and hydrogen on the open EU market and end reliance on the Electrogas tanker. Energy
Gas, hydrogen & energy security
–Politika tal-Enerġija
PDF p. 69 (printed p. 137)
218 Invest in a second Malta-Sicily interconnector to double supply from mainland Europe. Energy
Grid, interconnectors & storage
double supply from the mainlandPolitika tal-Enerġija
PDF p. 69 (printed p. 137)
219 Return any government or Enemalta earnings from emissions trading or similar activities to consumers as a rebate. Energy
Bills & tariffs
–Politika tal-Enerġija
PDF p. 69 (printed p. 137)
220 Give every Maltese and Gozitan household the chance to benefit from photovoltaic schemes, including those without roof access. Energy
Rooftop & community generation
–Politika tal-Enerġija
PDF p. 69 (printed p. 137)
221 Strengthen the Energy Performance Certificate by giving ESG-compliant developers tax credits for implementing EPC recommendations. Energy
Energy efficiency
–Politika tal-Enerġija
PDF p. 69 (printed p. 137)
Partit Popolari · no programme found

6 Oct 2026: partitpopolari.mt (TLS certificate for another host; plain http returns a hosting error page); Wayback Machine, archive.ph, Common Crawl and arquivo.pt (refused or reset from here); web searches for the 2022 manifesto. The programme was presented on 15 Mar 2022 (TVM) and published as web chapters, now offline.

Volt Malta · 13 pledges

Volt Malta Manifesto 2022. Covered: chapter 3, A model of sustainability: construction and development, new energy solutions (its transport section left out, as for other parties).

No.Pledge (our summary)SubjectTargetSection and page
dev-01 Require insulated walls and windows in new developments, fining developers who omit insulation the equivalent of the cost of insulating the property. Energy
Energy efficiency
–Construction & Development — New Developments
PDF p. 39 (printed p. 34)
dev-02 Give insulation grants to eligible households wishing to insulate homes built in 2021 or earlier. Energy
Energy efficiency
buildings built 2021 and earlierConstruction & Development — Refurbishments
PDF p. 39 (printed p. 34)
dev-03 Give insulation grants to developers who choose to refurbish a property. Energy
Energy efficiency
–Construction & Development — Refurbishments
PDF p. 39 (printed p. 34)
dev-04 Revise the 2006 Local Plans with stakeholders, including civil society and locality representatives, to align them with EU environmental objectives. Land use & planning
Planning system & reform
2006 Local PlansConstruction & Development — Framework
PDF p. 39 (printed p. 34)
dev-05 Set and enforce strict rules for new developments, including locality design styles, stricter and lower height limits, stronger village-core protection and penalties for unreasonable demolition. Land use & planning
Building height & design
–Construction & Development — Framework
PDF p. 39 (printed p. 34)
dev-06 Add safeguards against expropriation: at least two months' notice (four for farmland), works halted during appeals, and fair compensation paid in advance. Land use & planning
Construction & neighbours
2 months' notice; 4 months for farmlandConstruction & Development — Framework
PDF p. 39 (printed p. 34)
dev-07 Keep ODZ land as ODZ; developers breaching it are barred from new projects for one year, and repeat offenders are excluded from public procurement for ten years. Land use & planning
ODZ & land protection
1-year greylisting; 10-year blacklistingConstruction & Development — Framework
PDF p. 40 (printed p. 35)
en-01 Research wave-energy generation in Malta, covering the most effective sustainable method, potential output and best locations. Energy
Large-scale & offshore renewables
–New Energy Solutions — Wave Energy
PDF p. 40 (printed p. 35)
en-02 Establish a wave farm in both Malta and Gozo based on the research results. Energy
Large-scale & offshore renewables
–New Energy Solutions — Wave Energy
PDF p. 40 (printed p. 35)
en-03 Work to cancel the Electrogas deal and consider nationalising its assets, publishing contracts, then study a renewable, mainly green-hydrogen, solution for the plant. Energy
Gas, hydrogen & energy security
–New Energy Solutions — Hydrogen Energy
PDF p. 40 (printed p. 35)
en-04 Research transparently whether a green hydrogen power station is viable in Malta, with a partial IPO if one is built. Energy
Gas, hydrogen & energy security
–New Energy Solutions — Hydrogen Energy
PDF p. 40 (printed p. 35)
en-05 Require any new Sicily–Malta gas pipeline to carry renewably produced gas, and any hydrogen pipeline to be green-hydrogen based. Energy
Gas, hydrogen & energy security
–New Energy Solutions — Hydrogen Energy
PDF p. 40 (printed p. 35)
en-06 Work to make electricity from the first and planned second interconnector increasingly green, and publish data on its composition. Energy
Grid, interconnectors & storage
–New Energy Solutions — Hydrogen Energy
PDF p. 41 (printed p. 36)

2026 general election

ADPD – The Green Party · 88 pledges

Ilkoll: Manifest Elettorali 2026. Covered: sections on sustainable development, environment, land use, local plans, ODZ, open spaces, 15-minute localities, boards, countryside access, water, climate emergency, energy, zero waste, hunting and trapping, fishing and the sea (pp. 7–27).

No.Pledge (our summary)SubjectTargetSection and page
sd-01 Give the Guardian of Future Generations the capacity to scrutinise the government's work.
Similar wording in its 2022 programme (found automatically, not reviewed): No. sd-01
Environmental governance
Rights, transparency & participation
–ŻVILUPP SOSTENIBBLI
PDF p. 7
env-01 Move towards sustainable mobility to tackle poor air quality caused largely by the rising number of cars. Transport
Less traffic, more room for people
–L-AMBJENT TAGĦNA
PDF p. 8
env-02 Subject land use continuously to clear environmental criteria, including impacts on the climate. Land use & planning
Planning system & reform
–L-AMBJENT TAGĦNA
PDF p. 8
env-03 Revitalise localities so that most daily needs are within reasonable distance of home, reducing travel and traffic. Transport
Less traffic, more room for people
–L-AMBJENT TAGĦNA
PDF p. 8
env-04 Revise local plans completely and cancel for good the rationalisation plan that made much ODZ land developable. Land use & planning
ODZ & land protection
–L-AMBJENT TAGĦNA
PDF p. 8
env-05 Make the Constitution's environmental principles enforceable, so citizens can ask the courts to compel government action on environmental matters.
Similar wording in its 2022 programme (found automatically, not reviewed): No. env-01
Environmental governance
Rights, transparency & participation
–L-AMBJENT TAGĦNA
PDF p. 8
env-06 Give environmental NGOs financial assistance from the state.
Similar wording in its 2022 programme (found automatically, not reviewed): No. env-02
Environmental governance
Rights, transparency & participation
–L-AMBJENT TAGĦNA
PDF p. 8
land-01 Opposes the government's recently proposed land-use planning reform, saying it adds discretion and eases building outside development zones. Land use & planning
Planning system & reform
–L-UŻU TAL-ART FL-INTERESS KOMUNI
PDF p. 9
land-02 Planning decisions should be taken by people of unquestioned integrity who are wholly detached from the development sector. Land use & planning
Planning system & reform
–L-UŻU TAL-ART FL-INTERESS KOMUNI
PDF p. 9
lp-01 Correct the errors in local plans without further delay and avoid repeating them. Land use & planning
Planning system & reform
–PJANI LOKALI GĦALINA LKOLL
PDF p. 9
lp-02 Update the 20-year-old local plans to present-day realities.
Similar wording in its 2022 programme (found automatically, not reviewed): No. land-01
Land use & planning
Planning system & reform
–PJANI LOKALI GĦALINA LKOLL
PDF p. 9
lp-03 Impose a moratorium on massive and high-rise development until local plans are revised and updated. Land use & planning
Building height & design
until local plans are revisedPJANI LOKALI GĦALINA LKOLL
PDF p. 9
odz-01 Revoke the 2006 rationalisation exercise (about two million square metres) and reclassify all still-untouched land in it as outside the development zone.
Similar wording in its 2022 programme (found automatically, not reviewed): No. land-02
Land use & planning
ODZ & land protection
c. 2 million m2 (2006 scheme)ODZ
PDF p. 10
os-01 Supports the government's open-spaces investment only if it is part of a long-term vision reintegrating nature, not a cover for something undeclared. Parks & trees
Green space policy & greening
–SPAZJI MIFTUĦA
PDF p. 10
os-02 Protect existing open spaces first, starting with large private gardens in urban areas and village cores threatened by flats. Parks & trees
Green space policy & greening
–SPAZJI MIFTUĦA
PDF p. 10
os-03 Next, protect agricultural land being lost to roads, development and recreational use. Land use & planning
ODZ & land protection
–SPAZJI MIFTUĦA
PDF p. 10
os-04 Open spaces should reintroduce nature into localities, not add concrete, and should not be used for car parking. Parks & trees
Green space policy & greening
–SPAZJI MIFTUĦA
PDF p. 10
min-01 Help small shops in towns and villages, to cut travel and traffic and so the car-related contribution to climate change. Transport
Less traffic, more room for people
–15-IL MINUTA 'L BOGĦOD
PDF p. 11
min-02 Land-use planning should focus on people and their needs (the 15-minute idea); only then does funding community greening projects make sense. Land use & planning
Planning system & reform
–15-IL MINUTA 'L BOGĦOD
PDF p. 11
board-01 Apply public parliamentary scrutiny before appointment to all members of the planning, lands and environment authority boards, including chairpersons and chief executives.
Similar wording in its 2022 programme (found automatically, not reviewed): No. board-01
Environmental governance
Regulators & boards
–IL-BORDIJIET LI JIEĦDU D-DEĊIŻJONIJIET
PDF p. 12
board-02 Laws should give civil society proper representation on these boards, chosen by civil society itself rather than vetted by the minister.
Similar wording in its 2022 programme (found automatically, not reviewed): No. board-02
Environmental governance
Regulators & boards
–IL-BORDIJIET LI JIEĦDU D-DEĊIŻJONIJIET
PDF p. 12
board-03 Remove representation of the parliamentary political parties from these decision-making boards.
Similar wording in its 2022 programme (found automatically, not reviewed): No. board-03
Environmental governance
Regulators & boards
–IL-BORDIJIET LI JIEĦDU D-DEĊIŻJONIJIET
PDF p. 12
board-04 Parliament's standing committees should continuously oversee these authorities and report with proposals for action.
Similar wording in its 2022 programme (found automatically, not reviewed): No. board-04
Environmental governance
Regulators & boards
–IL-BORDIJIET LI JIEĦDU D-DEĊIŻJONIJIET
PDF p. 12
board-05 Set clear conduct rules for board members, including a register of their assets.
Similar wording in its 2022 programme (found automatically, not reviewed): No. board-05
Environmental governance
Regulators & boards
–IL-BORDIJIET LI JIEĦDU D-DEĊIŻJONIJIET
PDF p. 12
board-06 No one should be appointed to these boards for long periods.
Similar wording in its 2022 programme (found automatically, not reviewed): No. board-06
Environmental governance
Regulators & boards
–IL-BORDIJIET LI JIEĦDU D-DEĊIŻJONIJIET
PDF p. 12
acc-01 Publish a definitive map of all public footpaths.
Similar wording in its 2022 programme (found automatically, not reviewed): No. acc-01
Countryside & coast
Countryside access & recreation
–ID-DRITT TA' AĊĊESS GĦALL-KAMPANJA
PDF p. 12
acc-02 Ensure that all traditional footpaths are open and accessible to everyone.
Similar wording in its 2022 programme (found automatically, not reviewed): No. acc-02
Countryside & coast
Countryside access & recreation
–ID-DRITT TA' AĊĊESS GĦALL-KAMPANJA
PDF p. 12
acc-03 No footpath should be blocked by a gate or otherwise unless there is proof the land is private.
Similar wording in its 2022 programme (found automatically, not reviewed): No. acc-03
Countryside & coast
Countryside access & recreation
–ID-DRITT TA' AĊĊESS GĦALL-KAMPANJA
PDF p. 12
acc-04 Footpaths on public land leased to farmers should remain open and accessible to the public.
Similar wording in its 2022 programme (found automatically, not reviewed): No. acc-02, No. acc-04
Countryside & coast
Countryside access & recreation
–ID-DRITT TA' AĊĊESS GĦALL-KAMPANJA
PDF p. 12
acc-05 Create a national agency to manage existing trails, implement those planned in local plans and safeguard countryside access.
Similar wording in its 2022 programme (found automatically, not reviewed): No. acc-05
Countryside & coast
Countryside access & recreation
–ID-DRITT TA' AĊĊESS GĦALL-KAMPANJA
PDF p. 12
acc-06 Create Malta's first National Trail along the Victoria Lines.
Similar wording in its 2022 programme (found automatically, not reviewed): No. acc-06
Countryside & coast
Countryside access & recreation
–ID-DRITT TA' AĊĊESS GĦALL-KAMPANJA
PDF p. 12
water-01 Monitor buildings now going up more closely, so they provide for rainwater storage.
Similar wording in its 2022 programme (found automatically, not reviewed): No. water-02
Water
Rainwater, groundwater & reuse
–L-ILMA
PDF p. 13
water-02 State aid schemes should increasingly help owners improve water storage in existing buildings.
Similar wording in its 2022 programme (found automatically, not reviewed): No. water-03
Water
Rainwater, groundwater & reuse
–L-ILMA
PDF p. 13
water-03 Pay more attention to using treated sewage effluent, particularly in agriculture.
Similar wording in its 2022 programme (found automatically, not reviewed): No. water-04
Water
Rainwater, groundwater & reuse
–L-ILMA
PDF p. 13
clim-01 The economic model should be redirected through targeted investment towards a circular economy that uses resources efficiently and reduces waste. Waste
Waste prevention & reuse
–EMERĠENZA KLIMATIKA
PDF p. 19
clim-02 Install solar panels on every building and invest in new infrastructure, including offshore wind turbines.
Similar wording in its 2022 programme (found automatically, not reviewed): No. 2
Energy
Rooftop & community generation
–EMERĠENZA KLIMATIKA
PDF p. 19
clim-03 Tie all financial aid to industry to concrete emission cuts, obliging every aided company to reach zero carbon.
Similar wording in its 2022 programme (found automatically, not reviewed): No. 15, No. clim-01
Climate
Business & industry transition
zero carbon (no date given)EMERĠENZA KLIMATIKA
PDF p. 20
clim-04 The low-carbon transition should account for social impacts and support those affected. Climate
Climate policy & institutions
–EMERĠENZA KLIMATIKA
PDF p. 20
clim-05 Revise the (climate-related) targets immediately, described as vague and unambitious. Climate
Climate targets
immediatelyEMERĠENZA KLIMATIKA
PDF p. 20
en-01 Generate and store as much of Malta's energy as possible locally, while remaining part of the European grid. Energy
Gas, hydrogen & energy security
–ENERĠIJA
PDF p. 21
en-02 Increase and safeguard the country's energy sovereignty within practical limits. Energy
Gas, hydrogen & energy security
–ENERĠIJA
PDF p. 21
en-03 Invest in renewable energy storage, energy efficiency and a variety of clean sources, while gas remains for now. Energy
Grid, interconnectors & storage
–ENERĠIJA
PDF p. 21
en-04 Government should insist at EU level that the price of renewable electricity is decoupled from the gas price. Energy
Bills & tariffs
–ENERĠIJA
PDF p. 21
1 Use every public, commercial and industrial building for solar generation, and consider wind where space permits.
Similar wording in its 2022 programme (found automatically, not reviewed): No. 1
Energy
Rooftop & community generation
–ENERĠIJA
PDF p. 21
2 Renewable energy systems, large or small, should include battery storage where possible. Energy
Grid, interconnectors & storage
–ENERĠIJA
PDF p. 21
3 Introduce time-of-day electricity tariffs to balance energy use. Energy
Bills & tariffs
–ENERĠIJA
PDF p. 21
4 Accelerate strengthening of the electricity grid to cope with intermittent renewable sources. Energy
Grid, interconnectors & storage
–ENERĠIJA
PDF p. 21
5 Install micro wind turbines in industrial zones.
Similar wording in its 2022 programme (found automatically, not reviewed): No. 2
Energy
Rooftop & community generation
–ENERĠIJA
PDF p. 21
6 Carry out studies on how agriculture and electricity generation can work together locally. Energy
Large-scale & offshore renewables
–ENERĠIJA
PDF p. 21
7 Use rehabilitated quarries more for solar farms, crops and woodland, under strict rules ensuring reversible structures and no other uses.
Similar wording in its 2022 programme (found automatically, not reviewed): No. 6
Energy
Large-scale & offshore renewables
–ENERĠIJA
PDF p. 21
8 Require every new building to be carbon neutral and generate all the energy it needs.
Similar wording in its 2022 programme (found automatically, not reviewed): No. 3
Energy
Energy efficiency
–ENERĠIJA
PDF p. 21
9 Impose a moratorium on increases in building heights so that the use of rooftop PV panels is not affected.
Similar wording in its 2022 programme (found automatically, not reviewed): No. 4
Energy
Rooftop & community generation
–ENERĠIJA
PDF p. 21
10 Create schemes and a legal framework so that apartment owners can jointly own PV panels on their block's roof.
Similar wording in its 2022 programme (found automatically, not reviewed): No. 5
Energy
Rooftop & community generation
–ENERĠIJA
PDF p. 21
11 Sustain and strengthen research already under way on wave energy and floating offshore PV panels.
Similar wording in its 2022 programme (found automatically, not reviewed): No. 8
Energy
Large-scale & offshore renewables
–ENERĠIJA
PDF p. 21
12 Make long-term investment in offshore wind energy, presented as necessary for the 2050 zero-carbon goal.
Similar wording in its 2022 programme (found automatically, not reviewed): No. 9
Energy
Large-scale & offshore renewables
zero-carbon by 2050ENERĠIJA
PDF p. 21
13 Set feed-in tariffs, subsidies and incentives for renewables over a long horizon, for example 20 years.
Similar wording in its 2022 programme (found automatically, not reviewed): No. 10
Energy
Large-scale & offshore renewables
e.g. 20 yearsENERĠIJA
PDF p. 22
14 Oblige every large company, including banks, insurers and financial-services firms, to show how they will become zero-carbon before 2050.
Similar wording in its 2022 programme (found automatically, not reviewed): No. 15
Climate
Business & industry transition
zero-carbon before 2050ENERĠIJA
PDF p. 22
15 Tie all aid to companies, immediately, to energy-efficient operation, use of renewables and projects generating the clean energy they need.
Similar wording in its 2022 programme (found automatically, not reviewed): No. 16
Climate
Business & industry transition
immediatelyENERĠIJA
PDF p. 22
16 Support community projects that let residents produce and share renewable energy. Energy
Rooftop & community generation
–ENERĠIJA
PDF p. 22
17 Malta should generate 50% of its energy from renewable sources by 2030, replacing the current 25% target. Energy
Large-scale & offshore renewables
50% renewables by 2030 (vs current 25% target)ENERĠIJA
PDF p. 22
waste-01 Aim for zero waste to landfill and keep waste incineration to the minimum possible. Waste
Treatment & disposal
zero waste to landfill; zero-waste goal by 2050 referencedSKART-ŻERO
PDF p. 22
waste-02 Reduce single-use containers through in-shop refill systems and incentives and disincentives for producers. Waste
Waste prevention & reuse
–SKART-ŻERO
PDF p. 22
waste-03 Put more emphasis on cutting excess consumption and on access to good-tasting drinking water at home. Waste
Waste prevention & reuse
–SKART-ŻERO
PDF p. 22
waste-04 Fund local councils and regions, from importer and producer contributions, to enforce waste-reduction laws and run education campaigns. Waste
Waste prevention & reuse
–SKART-ŻERO
PDF p. 22
waste-05 Government should focus on the commercial sector and require all commercial waste to be separated as the law sets out. Waste
Recycling & separation
–SKART-ŻERO
PDF p. 22
waste-06 Buildings should be dismantled rather than demolished, with urgent laws and initiatives for reusing building materials. Waste
Construction & demolition waste
–SKART-ŻERO
PDF p. 22
waste-07 Tie every incentive to industry and commerce to clear, binding, annually reported resource-use and zero-waste targets. Waste
Waste prevention & reuse
annual reportingSKART-ŻERO
PDF p. 22
waste-08 Scale companies' obligations by sector and size of business. Waste
Waste prevention & reuse
–SKART-ŻERO
PDF p. 22
waste-09 Incinerate the least waste possible; criticises the government's plan to incinerate 40% of waste and an incinerator sized accordingly.
Similar wording in its 2022 programme (found automatically, not reviewed): No. waste-03
Waste
Treatment & disposal
opposes government's 40% incineration shareSKART-ŻERO
PDF p. 22
waste-10 Propose and enforce Malta-specific laws obliging reuse of all usable material from demolished buildings. Waste
Construction & demolition waste
–SKART-ŻERO
PDF p. 23
waste-11 Charge high fees for disposing of construction waste, ending the current subsidised rates. Waste
Construction & demolition waste
–SKART-ŻERO
PDF p. 23
waste-12 Accelerate waste separation in catering immediately, with clearer obligations and strict enforcement. Waste
Recycling & separation
immediatelySKART-ŻERO
PDF p. 23
waste-13 Require every industry to have a clear, mandatory plan to cut waste and use raw materials efficiently. Waste
Waste prevention & reuse
–SKART-ŻERO
PDF p. 23
waste-14 Tie every incentive, including fiscal ones, strictly to energy efficiency, material efficiency and zero-waste targets. Waste
Waste prevention & reuse
–SKART-ŻERO
PDF p. 23
waste-15 Address quarrying and construction waste: reduce construction and dismantle buildings stone by stone under strict laws to cut demand for virgin stone. Waste
Construction & demolition waste
–SKART-ŻERO
PDF p. 23
hunt-01 Biodiversity protection should override every other interest, with validated scientific research guiding decisions. Nature & Wildlife
Hunting & trapping
–KAĊĊA U NSIB
PDF p. 24
hunt-02 ADPD MPs would work to end spring hunting for good. Nature & Wildlife
Hunting & trapping
–KAĊĊA U NSIB
PDF p. 24
hunt-03 Stop breaching EU law on finch trapping, including through loosened bird-ringing rules presented as research. Nature & Wildlife
Hunting & trapping
–KAĊĊA U NSIB
PDF p. 24
hunt-04 Provide more specialised, trained police officers, with equipment and resources, to fight hunting and trapping abuse. Nature & Wildlife
Hunting & trapping
–KAĊĊA U NSIB
PDF p. 25
hunt-05 Strengthen the deterrent for shooting protected birds; fines should rise, not fall. Nature & Wildlife
Hunting & trapping
–KAĊĊA U NSIB
PDF p. 25
fish-01 Eliminate harmful fishing practices such as bottom trawling. Nature & Wildlife
Fishing & fish farms
–IS-SAJD
PDF p. 26
fish-02 Step up efforts against illegal fishing through continuous surveillance, consistent enforcement and cooperation with neighbouring countries. Nature & Wildlife
Fishing & fish farms
–IS-SAJD
PDF p. 26
fish-03 Cut abandoned fishing-net waste through education, incentives to return old nets and sanctions for careless disposal. Nature & Wildlife
Fishing & fish farms
–IS-SAJD
PDF p. 26
fish-04 Fish-farm operators must take every measure to eliminate slime in bays, with decisive action by authorities against those who do not. Nature & Wildlife
Fishing & fish farms
–IS-SAJD
PDF p. 26
fish-05 Authorities should ensure fish-farm permit conditions are observed, given harm to nearby Posidonia meadows. Nature & Wildlife
Fishing & fish farms
–IS-SAJD
PDF p. 26
sea-01 Set up a ministry for maritime policy covering the blue economy, fisheries, marine protection and coast, implementing the Public Domain law to secure coastal access. Nature & Wildlife
Marine & coastal protection
–L-IBĦRA HUMA ĦAJJITNA
PDF p. 27
sea-02 At the EU Council, Malta should press for rules against marine pollution and for sustainable, artisanal fishing. Nature & Wildlife
Marine & coastal protection
–L-IBĦRA HUMA ĦAJJITNA
PDF p. 27
sea-03 Work with fishers and coastal communities to protect biodiversity and fight climate change. Nature & Wildlife
Fishing & fish farms
–L-IBĦRA HUMA ĦAJJITNA
PDF p. 27
Aħwa Maltin · 35 pledges

Malta għall-Maltin: Programm Elettorali, Elezzjoni Ġenerali 2026. Covered: chapter on development, environment and culture: planning, energy, natural environment, animal welfare, hunting and trapping (192–200, 212–237); its transport and culture sections left out.

No.Pledge (our summary)SubjectTargetSection and page
192 Seek constitutional protection for land outside development zones (ODZ). Land use & planning
ODZ & land protection
–Ippjanar
PDF p. 63
193 Refuse permits for high-rise buildings outside the urban area around the two harbours. Land use & planning
Building height & design
–Ippjanar
PDF p. 63
194 Stop construction sites that breach health and safety rules or cause excessive nuisance, fining owners €1,000 a day until compliant, and require bank guarantees to cover damage to neighbours. Land use & planning
Construction & neighbours
€1,000 per dayIppjanar
PDF p. 63
195 Make contractors or developers face mandatory prison sentences, not just fines, when negligence causes a building collapse or injury. Land use & planning
Construction & neighbours
–Ippjanar
PDF p. 63
196 Impose high, dissuasive fines on owners of buildings left unfinished for an unreasonable time or left dilapidated. Land use & planning
Construction & neighbours
–Ippjanar
PDF p. 64
197 Allow a buyer to bid for a whole old block of flats for restoration or rebuilding if 90% of owners agree, with no owner paid below market value. Land use & planning
Construction & neighbours
90% of ownersIppjanar
PDF p. 64
198 Not block demolition of buildings under 70 years old, and decide conservation of buildings aged 70 to 120 years on aesthetic and historic criteria. Land use & planning
Heritage & townscape
70 years; 70–120 yearsIppjanar
PDF p. 64
199 Identify illegally built or abandoned land in every village and turn it into parks and gardens for families. Parks & trees
Green space policy & greening
every villageIppjanar
PDF p. 64
200 Refuse permits for places of worship or cultural centres that do not reflect Malta's traditional Christian heritage. Land use & planning
Heritage & townscape
–Ippjanar
PDF p. 64
212 Work towards an energy system based on renewable sources, particularly photovoltaics, with maximum national energy autonomy. Energy
Large-scale & offshore renewables
–Enerġija
PDF p. 66
213 Require new buildings to be passive, give incentives for energy efficiency in existing buildings, and have the state set passive-building specifications for Malta's climate. Energy
Energy efficiency
–Enerġija
PDF p. 66
214 Open electricity generation and transmission markets to competition. Energy
Gas, hydrogen & energy security
–Enerġija
PDF p. 67
215 Guarantee public access to countryside paths over private land, buy back private countryside from willing sellers, and create new national parks modelled on Majjistral Park. Countryside & coast
Countryside access & recreation
–Ambjent Naturali
PDF p. 67
216 Set up more than one 24-hour animal hospital at reasonable rates, equipped for biopsies and advanced blood testing. Animal welfare
Veterinary care & neutering
more than one hospital; 24/7Ħarsien tal-Annimali — Infrastruttura u Kura Medika Avvanzata
PDF p. 68
217 Provide a free emergency animal ambulance service with a fleet equipped with cameras and medical equipment. Animal welfare
Veterinary care & neutering
–Ħarsien tal-Annimali — Infrastruttura u Kura Medika Avvanzata
PDF p. 68
218 Run free national neutering programmes, with blood tests, for stray dogs and cats. Animal welfare
Veterinary care & neutering
–Ħarsien tal-Annimali — Infrastruttura u Kura Medika Avvanzata
PDF p. 68
219 Build new sanctuaries for all types of animal, with sections for animals with incurable conditions. Animal welfare
Shelters, strays & adoption
–Ħarsien tal-Annimali — Santwarji u Kenn għal Kulħadd
PDF p. 68
220 Create full-time, decently paid jobs in animal sanctuaries instead of relying only on volunteers. Animal welfare
Shelters, strays & adoption
–Ħarsien tal-Annimali — Santwarji u Kenn għal Kulħadd
PDF p. 69
221 Install CCTV-equipped shelters for stray cats and give food and supplies to volunteer feeders. Animal welfare
Shelters, strays & adoption
–Ħarsien tal-Annimali — Santwarji u Kenn għal Kulħadd
PDF p. 69
222 Set up an armed, specialised Animal Police squad with powers of arrest for animal abuse. Animal welfare
Animal welfare law & enforcement
–Ħarsien tal-Annimali — L-Animal Police u l-Infurzar tal-Liġi
PDF p. 69
223 Toughen penalties for animal abusers and enter them in a national register barring them from adopting. Animal welfare
Animal welfare law & enforcement
–Ħarsien tal-Annimali — L-Animal Police u l-Infurzar tal-Liġi
PDF p. 69
224 Make adoption subject to strict contracts, compulsory microchips and ongoing home spot checks. Animal welfare
Shelters, strays & adoption
–Ħarsien tal-Annimali — L-Animal Police u l-Infurzar tal-Liġi
PDF p. 69
225 Give free help with vet costs to owners who cannot afford them and incentives for behavioural training. Animal welfare
Veterinary care & neutering
–Ħarsien tal-Annimali — Edukazzjoni u Appoġġ lill-Individwi
PDF p. 69
226 Introduce school modules on responsibility towards animals. Animal welfare
Pets in public life
–Ħarsien tal-Annimali — Edukazzjoni u Appoġġ lill-Individwi
PDF p. 70
227 Promote dog and cat cafés as safe recreational spaces with educational value. Animal welfare
Pets in public life
–Ħarsien tal-Annimali — Edukazzjoni u Appoġġ lill-Individwi
PDF p. 70
228 Create protected areas for wild animals and safe beaches for dogs. Animal welfare
Pets in public life
–Ħarsien tal-Annimali — Ambjent u Natura
PDF p. 70
229 Give incentives to farmers adopting humane practices and special protection for working farm animals. Animal welfare
Animal welfare law & enforcement
–Ħarsien tal-Annimali — Ambjent u Natura
PDF p. 70
230 Recognise and strengthen hunters' role as guardians of Miżieb and l-Aħrax woodlands, including clearing and fire prevention. Nature & Wildlife
Hunting & trapping
–Il-Kaċċa u l-Insib — Rikonoxximent tal-Gwardjani tal-Ambjent
PDF p. 71
231 Train hunters and trappers with Civil Protection to act as first responders in rural environmental emergencies. Nature & Wildlife
Hunting & trapping
–Il-Kaċċa u l-Insib — Rikonoxximent tal-Gwardjani tal-Ambjent
PDF p. 71
232 Affirm equal rights to enjoy the countryside for birdwatchers and for those legally hunting and trapping. Nature & Wildlife
Hunting & trapping
–Il-Kaċċa u l-Insib — Drittijiet Indaqs u Tmiem tal-Oskurità
PDF p. 71
233 End what it calls unfair hostility from NGOs towards law-abiding hunters and enforce the law fairly. Nature & Wildlife
Hunting & trapping
–Il-Kaċċa u l-Insib — Drittijiet Indaqs u Tmiem tal-Oskurità
PDF p. 71
234 Set clear access rules giving hunters priority at Miżieb and l-Aħrax in season, with the areas open to the public for the rest of the year. Nature & Wildlife
Hunting & trapping
–Il-Kaċċa u l-Insib — Maniġġar ta' Żoni Komuni
PDF p. 72
235 Set up joint committees of hunters and environmentalists to manage these natural areas, focusing on conservation and native tree planting. Nature & Wildlife
Hunting & trapping
–Il-Kaċċa u l-Insib — Maniġġar ta' Żoni Komuni
PDF p. 72
236 Run government campaigns presenting hunting positively as a land-management and conservation tool. Nature & Wildlife
Hunting & trapping
–Il-Kaċċa u l-Insib — Edukazzjoni u Kontribut fil-Komunità
PDF p. 72
237 Promote rural eco-tourism showing Maltese traditions, including traditional trapping and hunters' care of the environment. Nature & Wildlife
Hunting & trapping
–Il-Kaċċa u l-Insib — Edukazzjoni u Kontribut fil-Komunità
PDF p. 72
Imperium Europa · no programme found

6 Oct 2026: imperium-europa.org (502 or reset), imperiumeuropa.org (502); web searches for a 2026 manifesto; the only lead is a Facebook post labelled 'Manifesto (in English)' on Wikipedia, which cannot be read from here.

Momentum · 52 pledges

Momentum: Bidla ta' Vera, Electoral Manifesto 2026 (English edition). Covered: part A Flourishing Environment: sustainable construction and planning, climate and environmental action, biodiversity and marine protection (measures 70–121).

No.Pledge (our summary)SubjectTargetSection and page
70 Propose a two-year moratorium on new permits for buildings of ten or more floors while proper criteria and a national planning framework are developed. Land use & planning
Building height & design
two years; ten or more floorsSustainable Construction & Planning
PDF p. 20
71 Independently assess electricity, water and drainage capacity against population needs and draw up a long-term plan to end blackouts, water shortages and flooding. Land use & planning
Planning system & reform
–Sustainable Construction & Planning
PDF p. 20
72 Commission an independent review of the past two decades of planning decisions to inform a national planning strategy before large-scale permitting resumes. Land use & planning
Planning system & reform
past two decades (review period)Sustainable Construction & Planning
PDF p. 20
73 Rebuild the Planning Authority with planning experts independent of the construction industry and free of conflicts of interest. Land use & planning
Planning system & reform
–Sustainable Construction & Planning
PDF p. 21
74 Prevent the reintroduction of Bills 143 and 144 and instead publish a White Paper for wide public consultation on planning reform. Land use & planning
Planning system & reform
–Sustainable Construction & Planning
PDF p. 21
75 Suspend works under a development permit while an appeal is pending before the planning tribunal or courts, with time limits for deciding appeals. Land use & planning
Permits, appeals & enforcement
–Sustainable Construction & Planning
PDF p. 21
76 Introduce binding rules for demolishing illegal developments at the offender's expense, with time limits on enforcement appeals and a single enforcement entity. Land use & planning
Permits, appeals & enforcement
–Sustainable Construction & Planning
PDF p. 21
77 Ban retrospective sanctioning of illegal ODZ structures built after 2008 that cannot be approved as minor amendments. Land use & planning
Permits, appeals & enforcement
after 2008 (cut-off)Sustainable Construction & Planning
PDF p. 22
78 Return land removed from ODZ in the 2006 rationalisation, and not yet legally committed to development, to ODZ status. Land use & planning
ODZ & land protection
2006 rationalisation landSustainable Construction & Planning
PDF p. 22
79 Require geological surveys and sustainability assessments before major developments are permitted, and set up an emergency number for reporting dangerous structures. Land use & planning
Planning system & reform
–Sustainable Construction & Planning
PDF p. 22
80 Create a weighted scoring system for judging development applications on proportion, scale, urban context and material harmony, reducing subjectivity under frameworks such as DC15. Land use & planning
Building height & design
–Sustainable Construction & Planning
PDF p. 23
81 Limit construction, excavation and demolition work to 8am–5pm, Monday to Saturday, to protect workers and residents. Land use & planning
Construction & neighbours
8am to 5pm; Monday to SaturdaySustainable Construction & Planning
PDF p. 23
82 Strictly enforce a ban on building works on Sundays and public holidays. Land use & planning
Construction & neighbours
Sundays and public holidaysSustainable Construction & Planning
PDF p. 23
83 Require a national planning strategy so that new developments fit a long-term plan before approval. Land use & planning
Planning system & reform
–Sustainable Construction & Planning
PDF p. 23
84 Require parliamentary oversight and genuine public consultation before major projects are approved. Land use & planning
Planning system & reform
–Sustainable Construction & Planning
PDF p. 23
85 Amend the Constitution to forbid selling public land for commercial use and allow only short-term leases approved by a 75% parliamentary majority, preserving the land's value. Land use & planning
ODZ & land protection
75% parliamentary majoritySustainable Construction & Planning
PDF p. 24
86 Oppose using open public land in Pembroke for a football campus and propose the disused Marsa power station site instead. Land use & planning
ODZ & land protection
–Sustainable Construction & Planning
PDF p. 24
87 Use heritage assessment criteria, such as historical and cultural value, to evaluate and protect significant buildings. Land use & planning
Heritage & townscape
–Sustainable Construction & Planning
PDF p. 24
88 Balance development with protecting heritage sites such as Valletta, Mdina and Ġgantija so they keep their UNESCO World Heritage status. Land use & planning
Heritage & townscape
–Sustainable Construction & Planning
PDF p. 24
89 Require environmental impact assessments covering biodiversity, water and air quality for all significant construction projects. Land use & planning
Planning system & reform
–Sustainable Construction & Planning
PDF p. 25
90 Issue guidelines encouraging adaptive reuse of existing buildings instead of demolition. Land use & planning
Heritage & townscape
–Sustainable Construction & Planning
PDF p. 25
91 Digitise underground maps held by the National Archives and publish them free online to protect underground heritage. Land use & planning
Heritage & townscape
–Sustainable Construction & Planning
PDF p. 25
92 Hold genuine consultation with NGOs, professional bodies, local councils and the public on projects with significant community implications. Land use & planning
Planning system & reform
–Sustainable Construction & Planning
PDF p. 25
93 Strengthen the Environmental Protection Unit in Malta and Gozo with more staff, drones and cameras, operating around the clock. Land use & planning
Permits, appeals & enforcement
24/7 operationClimate & Environmental Action
PDF p. 26
94 Speed up the process for setting up offshore wind farms and solar farms. Energy
Large-scale & offshore renewables
–Climate & Environmental Action
PDF p. 26
95 Make more use of EU funding such as Horizon Europe Cluster 5 for clean-energy research, including floating offshore wind and maritime decarbonisation. Energy
Large-scale & offshore renewables
–Climate & Environmental Action
PDF p. 26
96 Increase support for renewable-energy cooperatives and community energy-sharing projects. Energy
Rooftop & community generation
–Climate & Environmental Action
PDF p. 26
97 Draw up a step-by-step roadmap towards zero plastic as part of decarbonisation. Waste
Waste prevention & reuse
–Climate & Environmental Action
PDF p. 27
98 Ban single-use plastic and work with producers, importers and sellers to phase out plastic packaging in supermarkets. Waste
Waste prevention & reuse
–Climate & Environmental Action
PDF p. 27
99 Work to ban single-use products in restaurants and fast-food outlets. Waste
Waste prevention & reuse
–Climate & Environmental Action
PDF p. 27
100 Create systems to cut food waste and strengthen laws to reduce packaging waste. Waste
Waste prevention & reuse
–Climate & Environmental Action
PDF p. 27
101 Back industrial decarbonisation while limiting aviation fuel carbon taxes to private planes and exempting shipping fuel for essential goods from environmental tax. Climate
Business & industry transition
–Climate & Environmental Action
PDF p. 27
102 Invest in research on solar, wind, wave, hydrogen and geothermal energy. Energy
Large-scale & offshore renewables
–Climate & Environmental Action
PDF p. 28
103 Provide incentives for improving energy use intensity and installing battery storage. Energy
Energy efficiency
–Climate & Environmental Action
PDF p. 28
104 Adopt an environmental policy prioritising renewable-energy research and investment to make Malta carbon neutral by 2050. Climate
Climate targets
zero carbon / carbon neutral by 2050Climate & Environmental Action
PDF p. 28
105 Explore regional green-energy partnerships with North Africa and Sicily, including undersea cables and shared installations. Energy
Grid, interconnectors & storage
–Climate & Environmental Action
PDF p. 28
106 Align waste policy with the EU Circular Economy Action Plan, prioritising prevention, reuse and recycling over incineration and landfill. Waste
Waste prevention & reuse
–Climate & Environmental Action
PDF p. 28
107 Turn the undeveloped and unrestored parts of Fort Chambray into Gozo's national park under public stewardship, halting further commercial exploitation. Parks & trees
National parks & valleys
–Climate & Environmental Action
PDF p. 28
108 Strictly limit fishing to traditional methods to let marine biodiversity recover. Nature & Wildlife
Fishing & fish farms
–Biodiversity & Marine Protection
PDF p. 29
109 Use EU fisheries funding to help traditional fishers move to ecologically sustainable practices. Nature & Wildlife
Fishing & fish farms
–Biodiversity & Marine Protection
PDF p. 29
110 Strictly protect Comino as a Natura 2000 site against commercial development. Nature & Wildlife
Habitats & species
–Biodiversity & Marine Protection
PDF p. 29
111 Oppose private pools, restaurants, expanded berthing and similar private development on protected marine sites. Nature & Wildlife
Marine & coastal protection
–Biodiversity & Marine Protection
PDF p. 30
112 Enforce public domain law so that the whole coastline stays freely accessible to the public. Countryside & coast
Coast, beaches & public domain
–Biodiversity & Marine Protection
PDF p. 30
113 Award beach concessions through impartial, transparent, EU-compliant selection procedures. Countryside & coast
Coast, beaches & public domain
–Biodiversity & Marine Protection
PDF p. 30
114 Tackle light pollution from coastal development that harms marine ecosystems and wildlife. Nature & Wildlife
Light pollution
–Biodiversity & Marine Protection
PDF p. 30
115 Restore and conserve valleys as biodiversity corridors and protect them from inappropriate urban development. Nature & Wildlife
Habitats & species
–Biodiversity & Marine Protection
PDF p. 30
116 Have public country pathways mapped by the authorities to stop them being blocked or privatised, and develop cultural trekking routes. Countryside & coast
Countryside access & recreation
–Biodiversity & Marine Protection
PDF p. 31
117 Require on-site waste and sewage treatment for coastal projects to prevent marine pollution. Water
Sewage & wastewater
–Biodiversity & Marine Protection
PDF p. 31
118 Carry out full independent environmental reassessments of developments affecting protected areas. Nature & Wildlife
Habitats & species
–Biodiversity & Marine Protection
PDF p. 31
119 Strictly enforce laws protecting public marine spaces and access to the shoreline. Countryside & coast
Coast, beaches & public domain
–Biodiversity & Marine Protection
PDF p. 31
120 Support traditional fishing communities while ensuring fishing is sustainable and helps marine ecosystems recover. Nature & Wildlife
Fishing & fish farms
–Biodiversity & Marine Protection
PDF p. 31
121 Create buffer zones and protection measures around critical marine habitats and breeding areas. Nature & Wildlife
Marine & coastal protection
–Biodiversity & Marine Protection
PDF p. 32
Partit Laburista (Labour Party) · 105 pledges

Int Malta: Manifest Elettorali 2026. Covered: chapter 14 (Pajjiż sabiħ), chapter 16 (energy); plus priority 19 and item 13.28, linked to claims.

No.Pledge (our summary)SubjectTargetSection and page
priority 19 Everyone in Malta within ten minutes’ walk of an open or green space.
Checked: CC-011 Ten minutes' walk to green space (pledge: Not measurable)
Parks & trees
Green space policy & greening
–25 mira għal ħajja eħfef, isbaħ u aħjar
p. 17
13.28 Gozo to be the first part of the country to become climate neutral, with stronger incentives for solar panels, batteries and solar water heaters. Climate
Climate targets
–Għawdex gżira tal-villaġġi: Distribuzzjoni tal-enerġija (chapter 13)
PDF p. 148 (printed p. 146)
14.1 Turn White Rocks into a natural park instead of development, continue restoring its habitat and protect the site permanently from development. Parks & trees
National parks & valleys
369,000 m2; 10 tonnesL-akbar investiment fl-ambjent ta’ pajjiżna (chapter 14, Pajjiż sabiħ)
PDF p. 162 (printed p. 160)
14.2 Maintain White Rocks buildings for education, arts and research uses, and add picnic areas and facilities for mountain biking, hiking and obstacle racing. Parks & trees
National parks & valleys
–L-akbar investiment fl-ambjent ta’ pajjiżna (chapter 14, Pajjiż sabiħ)
PDF p. 162 (printed p. 160)
14.3 Start restoring Fort Campbell in the coming months, creating camping space, recreation areas for adults and children, and safe walking paths. Countryside & coast
Countryside access & recreation
–L-akbar investiment fl-ambjent ta’ pajjiżna (chapter 14, Pajjiż sabiħ)
PDF p. 162 (printed p. 160)
14.4 Create a natural park in the Ħamrun area on the Malta Dairy Products site, with hundreds of trees and plants, after relocating the dairy plant. Parks & trees
Urban parks & squares
–L-akbar investiment fl-ambjent ta’ pajjiżna (chapter 14, Pajjiż sabiħ)
PDF p. 162 (printed p. 160)
14.5 Change the local plan so that no development can take place on Manoel Island, which has been returned to the public. Land use & planning
ODZ & land protection
–Manoel Island lura għand in-nies (chapter 14, Pajjiż sabiħ)
PDF p. 163 (printed p. 161)
14.6 Return Manoel Island's natural areas to their natural state through extensive cleaning, walking paths, picnic spaces, swimmers' facilities and planting hundreds of trees. Parks & trees
National parks & valleys
–Manoel Island lura għand in-nies (chapter 14, Pajjiż sabiħ)
PDF p. 163 (printed p. 161)
14.7 Make Manoel Island a community green space with accessible shoreline and bays, running tracks, water-sports facilities and spaces for relaxation activities. Parks & trees
National parks & valleys
–Manoel Island lura għand in-nies (chapter 14, Pajjiż sabiħ)
PDF p. 163 (printed p. 161)
14.8 Dedicate space on Manoel Island's sports area to a football pitch and a bocci pitch, as promised to Gżira residents. Parks & trees
Urban parks & squares
–Manoel Island lura għand in-nies (chapter 14, Pajjiż sabiħ)
PDF p. 163 (printed p. 161)
14.9 Use Fort Manoel for artistic, cultural and educational purposes and begin restoring the Lazzaretto for sustainable use. Land use & planning
Heritage & townscape
–Manoel Island lura għand in-nies (chapter 14, Pajjiż sabiħ)
PDF p. 163 (printed p. 161)
14.10 Split the Environment and Planning Review Tribunal in two, creating a separate tribunal dealing only with environmental appeals. Land use & planning
Permits, appeals & enforcement
–Governanza ambjentali (chapter 14, Pajjiż sabiħ)
PDF p. 164 (printed p. 162)
14.11 Public land inside the rationalisation zones added in the 2006 local plans will not be developed for speculative purposes. Land use & planning
ODZ & land protection
2006Governanza ambjentali (chapter 14, Pajjiż sabiħ)
PDF p. 164 (printed p. 162)
14.12 Amend the law so that parks and gardens created in recent years, especially on formerly developable land, are protected from development. Parks & trees
Green space policy & greening
–Governanza ambjentali (chapter 14, Pajjiż sabiħ)
PDF p. 164 (printed p. 162)
14.13 Identify further land for open spaces near homes and workplaces, after gardens in Ħal Lija, Ħal Kirkop, Swieqi and arrangements in Ħal Luqa and Fgura. Parks & trees
Green space policy & greening
–Governanza ambjentali (chapter 14, Pajjiż sabiħ)
PDF p. 164 (printed p. 162)
14.14 Keep adding rural places and hiking and trekking routes to the Parks in Malta app, which lists parks, gardens and open spaces. Countryside & coast
Countryside access & recreation
–Poplu li jgawdi l-kampanja (chapter 14, Pajjiż sabiħ)
PDF p. 164 (printed p. 162)
14.15 Link Floriana and Tal-Pietà gardens into a green network, with more restoration at Ġnien San Filippu, Pinetum works and regeneration at Ġnien tal-Milorda.
Similar wording in its 2022 programme (found automatically, not reviewed): No. 323
Parks & trees
Urban parks & squares
2023Poplu li jgawdi l-kampanja (chapter 14, Pajjiż sabiħ)
PDF p. 165 (printed p. 163)
14.16 Planning has begun to turn the Wied Dalam military site into an accessible family space of ecological importance used for environmental education. Parks & trees
National parks & valleys
–Poplu li jgawdi l-kampanja (chapter 14, Pajjiż sabiħ)
PDF p. 165 (printed p. 163)
14.17 Complete the Park tal-Inħawi in Fgura, a green space with pedestrian paths, children's facilities and parking, linked to Park ta' San Klement in Ħaż-Żabbar. Parks & trees
Urban parks & squares
40,000m2Parks naturali madwar il-pajjiż kollu (chapter 14, Pajjiż sabiħ)
PDF p. 165 (printed p. 163)
14.18 Extend the Bengħajsa Park, opened in 2023, by a further 7,000m2 and expand it substantially again in the next legislature. Parks & trees
National parks & valleys
2023; 7,000m2; next legislatureParks naturali madwar il-pajjiż kollu (chapter 14, Pajjiż sabiħ)
PDF p. 165 (printed p. 163)
14.19 Expand the Salina National Park, restore its farmhouse, create new paths and plant more trees. Parks & trees
National parks & valleys
–Parks naturali madwar il-pajjiż kollu (chapter 14, Pajjiż sabiħ)
PDF p. 165 (printed p. 163)
14.20 Complete the final phase of Ta' Qali National Park, including a jogging and cycling track, plus picnic-area lighting, furniture, water reservoirs and flood measures. Parks & trees
National parks & valleys
3 km; 2 reservoirsParks naturali madwar il-pajjiż kollu (chapter 14, Pajjiż sabiħ)
PDF p. 165 (printed p. 163)
14.21 Replace the dismantled Sant'Antnin waste plant in Marsaskala with a park including mature trees, a pond, a learning centre, exhibition space and a greenhouse. Parks & trees
National parks & valleys
23,800m2Parks naturali madwar il-pajjiż kollu (chapter 14, Pajjiż sabiħ)
PDF p. 165 (printed p. 163)
14.22 Create Park ta' San Patrizju in Pembroke, with extensive cleaning near the Natura 2000 site, a picnic area and more accessible paths. Parks & trees
National parks & valleys
–Parks naturali madwar il-pajjiż kollu (chapter 14, Pajjiż sabiħ)
PDF p. 166 (printed p. 164)
14.23 Turn the area around Fortizza Delle Grazie in Xgħajra into a park with recreation space, new trees and outdoor event facilities. Parks & trees
Urban parks & squares
–Parks naturali madwar il-pajjiż kollu (chapter 14, Pajjiż sabiħ)
PDF p. 166 (printed p. 164)
14.24 Extend the 20-tomna Wied Inċita park by 7,000m2, then by over 70,000m2 in a third phase next legislature, adding family space and fruit trees. Parks & trees
National parks & valleys
20 tomna; 7,000m2; 70,000m2; next legislatureInħarsu l-widien ta’ pajjiżna (chapter 14, Pajjiż sabiħ)
PDF p. 166 (printed p. 164)
14.25 Clean Wied Blandun, preserve its habitat and remove invasive trees, and maintain paths between Fgura and Għajn Dwieli for walking and cycling. Parks & trees
National parks & valleys
–Inħarsu l-widien ta’ pajjiżna (chapter 14, Pajjiż sabiħ)
PDF p. 166 (printed p. 164)
14.26 Start a second phase of regeneration works at Wied il-Qlejgħa in the next legislature, after a 2 km path and maintenance works. Parks & trees
National parks & valleys
2 km; next legislatureInħarsu l-widien ta’ pajjiżna (chapter 14, Pajjiż sabiħ)
PDF p. 166 (printed p. 164)
14.27 Carry out regeneration works in Wied il-Għasel, as done in Wied Speranza, creating one public path linking three valleys including Wied il-Qlejgħa. Parks & trees
National parks & valleys
–Inħarsu l-widien ta’ pajjiżna (chapter 14, Pajjiż sabiħ)
PDF p. 166 (printed p. 164)
14.28 Restore the Grade 1 scheduled Gżira sewage pumping station and turn surrounding land into a garden with family spaces and hundreds of trees. Parks & trees
Urban parks & squares
–Irħula b’ambjent sabiħ (chapter 14, Pajjiż sabiħ)
PDF p. 167 (printed p. 165)
14.29 Embellish another part of the Imtarfa woodland with more walking paths, indigenous trees and a path linking it to Ġnien is-27 t'April. Parks & trees
National parks & valleys
–Irħula b’ambjent sabiħ (chapter 14, Pajjiż sabiħ)
PDF p. 167 (printed p. 165)
14.30 Start works this year on the former AUM dormitory site in Bormla: open space with trees, swings, outdoor gym and underground parking.
Similar wording in its 2022 programme (found automatically, not reviewed): No. 291
Parks & trees
Urban parks & squares
this yearIrħula b’ambjent sabiħ (chapter 14, Pajjiż sabiħ)
PDF p. 167 (printed p. 165)
14.31 Start the San Ġwann centre project in coming months: underground parking first, then replace the car area in front of the church with a garden.
Similar wording in its 2022 programme (found automatically, not reviewed): No. 296
Parks & trees
Urban parks & squares
–Irħula b’ambjent sabiħ (chapter 14, Pajjiż sabiħ)
PDF p. 167 (printed p. 165)
14.32 Restore paths, walls and fountains at the Sant'Anton Gardens in Ħ'Attard, followed by restoring the conservatory for growing plants. Parks & trees
Urban parks & squares
–Irħula b’ambjent sabiħ (chapter 14, Pajjiż sabiħ)
PDF p. 167 (printed p. 165)
14.33 Launch a tree-planting initiative on main roads using suitable species, without reducing parking space. Parks & trees
Trees & afforestation
–Irħula b’ambjent sabiħ (chapter 14, Pajjiż sabiħ)
PDF p. 167 (printed p. 165)
14.34 After the Imsida Creek project, cover the area outside the Santa Venera tunnel to create an open space with new trees.
Similar wording in its 2022 programme (found automatically, not reviewed): No. 292
Parks & trees
Urban parks & squares
–Irħula b’ambjent sabiħ (chapter 14, Pajjiż sabiħ)
PDF p. 167 (printed p. 165)
14.35 After technical studies, create an open space with trees, children's and exercise facilities on the Triq il-Qasab watercourse in Birkirkara.
Similar wording in its 2022 programme (found automatically, not reviewed): No. 294
Parks & trees
Urban parks & squares
–Irħula b’ambjent sabiħ (chapter 14, Pajjiż sabiħ)
PDF p. 167 (printed p. 165)
14.36 Begin maintenance in coming months of the reservoirs at Ta' Mlit in Mosta and the Imqabba bypass, increasing water storage and creating gardens above them. Water
Rainwater, groundwater & reuse
–Irħula b’ambjent sabiħ (chapter 14, Pajjiż sabiħ)
PDF p. 168 (printed p. 166)
14.37 Issue another Community Greening Grant call in the next legislature for localities not yet funded; the 2023 grant allocated €10 million. Parks & trees
Green space policy & greening
2023; €10 million; next legislatureIrħula b’ambjent sabiħ (chapter 14, Pajjiż sabiħ)
PDF p. 168 (printed p. 166)
14.38 Carry out extensive maintenance of paths at Ġnien il-Mediterran in Raħal Ġdid, add water-storage facilities and plant more trees and plants. Parks & trees
Urban parks & squares
–Irħula b’ambjent sabiħ (chapter 14, Pajjiż sabiħ)
PDF p. 168 (printed p. 166)
14.39 Protect more natural areas to reach the EU target of 30% of territory protected, from 29% of Malta's land protected today. Nature & Wildlife
Habitats & species
29%; 30%Ħarsien tal-bijodiversità (chapter 14, Pajjiż sabiħ)
PDF p. 170 (printed p. 168)
14.40 Launch a national pollinator strategy followed by initiatives encouraging planting that provides food and shelter for local pollinators. Nature & Wildlife
Habitats & species
–Ħarsien tal-bijodiversità (chapter 14, Pajjiż sabiħ)
PDF p. 170 (printed p. 168)
14.41 Restore Razzett tax-Xitan in Mellieħa, between two Natura 2000 sites, as a research and learning centre on local pollinator species. Nature & Wildlife
Habitats & species
–Ħarsien tal-bijodiversità (chapter 14, Pajjiż sabiħ)
PDF p. 170 (printed p. 168)
14.42 Launch an Environmental Civic Service Scheme letting people work hours with environmental organisations, with participation recognised as professional experience. Environmental governance
Rights, transparency & participation
–Ħarsien tal-bijodiversità (chapter 14, Pajjiż sabiħ)
PDF p. 170 (printed p. 168)
14.43 Continue afforestation and distribute fruit trees to councils, NGOs and the public, after over 57,000 trees were planted in 2022-2025.
Similar wording in its 2022 programme (found automatically, not reviewed): No. 305, No. 311
Parks & trees
Trees & afforestation
2022; 2025; 57,000Afforestazzjoni (chapter 14, Pajjiż sabiħ)
PDF p. 170 (printed p. 168)
14.44 Afforest a former two-quarry site at San Niklaw in Siġġiewi with hundreds of mature trees, walking paths and benches. Parks & trees
Trees & afforestation
100,000m2Afforestazzjoni (chapter 14, Pajjiż sabiħ)
PDF p. 170 (printed p. 168)
14.45 Start an afforestation initiative around the WasteServ complex at Magħtab to improve the area's natural environment. Parks & trees
Trees & afforestation
2013Afforestazzjoni (chapter 14, Pajjiż sabiħ)
PDF p. 171 (printed p. 169)
14.46 Turn an abandoned quarry into Mitħna Park, a family space for Qrendi and Imqabba residents with over 100 new trees. Parks & trees
Urban parks & squares
100Afforestazzjoni (chapter 14, Pajjiż sabiħ)
PDF p. 171 (printed p. 169)
14.47 Continue removing invasive trees from natural areas such as Għajn Tuffieħa, l-Aħrax tal-Mellieħa and Salina, replacing them with indigenous trees.
Similar wording in its 2022 programme (found automatically, not reviewed): No. 312
Parks & trees
Trees & afforestation
–Afforestazzjoni (chapter 14, Pajjiż sabiħ)
PDF p. 171 (printed p. 169)
14.48 Continue working with Nature Trust so more schools join the Nebbieta project, in which pupils grow trees and plants for later planting. Parks & trees
Trees & afforestation
–Afforestazzjoni (chapter 14, Pajjiż sabiħ)
PDF p. 171 (printed p. 169)
14.49 Add more smoke-free sandy beaches in coming years, after Ramla l-Ħamra and Ramla tal-Mixquqa became the first two in 2026. Countryside & coast
Coast, beaches & public domain
2026; 2Il-ħajja ta’ taħt il-baħar (chapter 14, Pajjiż sabiħ)
PDF p. 171 (printed p. 169)
14.50 Start a pilot of eco-moorings at Kemmuna and Qawra, then extend to other bays, with free public use. Nature & Wildlife
Marine & coastal protection
–Il-ħajja ta’ taħt il-baħar (chapter 14, Pajjiż sabiħ)
PDF p. 171 (printed p. 169)
14.51 Increase sea monitoring and testing to implement measures to rehabilitate seagrass meadows. Nature & Wildlife
Marine & coastal protection
–Il-ħajja ta’ taħt il-baħar (chapter 14, Pajjiż sabiħ)
PDF p. 171 (printed p. 169)
14.52 Work with academics to create new marine habitats, control invasive species and remove waste harming marine biodiversity around the Maltese islands. Nature & Wildlife
Marine & coastal protection
–Il-ħajja ta’ taħt il-baħar (chapter 14, Pajjiż sabiħ)
PDF p. 171 (printed p. 169)
14.53 Procurement closed for a new organic-waste plant converting organic waste into renewable energy or compost; work to start on it. Waste
Treatment & disposal
€75 millionNibdlu l-iskart f’riżorsa (chapter 14, Pajjiż sabiħ)
PDF p. 172 (printed p. 170)
14.54 Remain committed to developing a waste-to-energy plant processing non-recyclable waste, aiming for very little waste going to landfill. Waste
Treatment & disposal
192,000 tonnesNibdlu l-iskart f’riżorsa (chapter 14, Pajjiż sabiħ)
PDF p. 172 (printed p. 170)
14.55 Start work in coming years on a skip facility processing bulky waste from open-top skips, after the 2023 EcoHive sorting facility. Waste
Recycling & separation
2023; 50,000 tonnesNibdlu l-iskart f’riżorsa (chapter 14, Pajjiż sabiħ)
PDF p. 172 (printed p. 170)
14.56 Keep promoting the five bulky-waste centres in Malta and Gozo and open another such centre in the south of Malta.
Similar wording in its 2022 programme (found automatically, not reviewed): No. 352
Waste
Recycling & separation
5 centres; 1 new centreNibdlu l-iskart f’riżorsa (chapter 14, Pajjiż sabiħ)
PDF p. 172 (printed p. 170)
14.57 Introduce a consumer refund scheme covering part of repair labour costs for products such as furniture, electronics and household appliances. Waste
Waste prevention & reuse
50%L-ekonomija ċirkolari ta’ pajjiżna (chapter 14, Pajjiż sabiħ)
PDF p. 172 (printed p. 170)
14.58 Create a central list of businesses certified to carry out repairs, giving the repair sector more visibility. Waste
Waste prevention & reuse
–L-ekonomija ċirkolari ta’ pajjiżna (chapter 14, Pajjiż sabiħ)
PDF p. 172 (printed p. 170)
14.59 Launch a pilot project to treat desalination brine and convert it into marketable magnesium. Waste
Waste prevention & reuse
–L-ekonomija ċirkolari ta’ pajjiżna (chapter 14, Pajjiż sabiħ)
PDF p. 173 (printed p. 171)
14.60 Work with the construction sector to implement excavation-waste targets by 2028 under the Construction and Demolition Waste Strategy. Waste
Construction & demolition waste
2028L-ekonomija ċirkolari ta’ pajjiżna (chapter 14, Pajjiż sabiħ)
PDF p. 173 (printed p. 171)
14.61 Work with the construction sector to identify an abandoned quarry for disposing of construction waste, much of it recyclable on site. Waste
Construction & demolition waste
–L-ekonomija ċirkolari ta’ pajjiżna (chapter 14, Pajjiż sabiħ)
PDF p. 173 (printed p. 171)
14.62 Launch research into using waste glass in cement production to reduce glass exports for recycling and greenhouse gas emissions. Waste
Waste prevention & reuse
–L-ekonomija ċirkolari ta’ pajjiżna (chapter 14, Pajjiż sabiħ)
PDF p. 173 (printed p. 171)
14.63 Defend derogations allowed under EU directives to safeguard hunting and trapping, and work with hunters and trappers on environmental restoration projects.
Similar wording in its 2022 programme (found automatically, not reviewed): No. 365
Nature & Wildlife
Hunting & trapping
–Il-kaċċa u l-insib (chapter 14, Pajjiż sabiħ)
PDF p. 173 (printed p. 171)
14.64 Strengthen the turtle dove breeding and release project with direct support for participants.
Similar wording in its 2022 programme (found automatically, not reviewed): No. 366
Nature & Wildlife
Hunting & trapping
–Il-kaċċa u l-insib (chapter 14, Pajjiż sabiħ)
PDF p. 173 (printed p. 171)
16.1 Work on Malta's first offshore wind farm has begun; operator interest is being assessed; work on 300MW of installations to start in coming years.
Also promised earlier: CC-029, First offshore wind farm (government commitment, 2022–26, Off track).
Carries forward: Malta Flimkien: Manifest Elettorali 2022, 397.
Energy
Large-scale & offshore renewables
300MWĠenerazzjoni tal-enerġija stabbli (chapter 16, Settur tal-enerġija reżiljenti)
PDF p. 186 (printed p. 184)
16.2 Sites in Maltese waters chosen for offshore solar pilot projects; continued support to the University of Malta and private partners for a sea-surface solar farm. Energy
Large-scale & offshore renewables
–Ġenerazzjoni tal-enerġija stabbli (chapter 16, Settur tal-enerġija reżiljenti)
PDF p. 186 (printed p. 184)
16.3 Work on the second Malta–Sicily interconnector to be completed soon, said to double interconnection capacity with Europe and cut emissions. Energy
Grid, interconnectors & storage
–Ġenerazzjoni tal-enerġija stabbli (chapter 16, Settur tal-enerġija reżiljenti)
PDF p. 186 (printed p. 184)
16.4 Continue work towards a third electricity connection with mainland Europe by 2035, also allowing Malta to export electricity. Energy
Grid, interconnectors & storage
2035Ġenerazzjoni tal-enerġija stabbli (chapter 16, Settur tal-enerġija reżiljenti)
PDF p. 186 (printed p. 184)
16.5 Battery energy storage procurement is under way; work to start at Delimara and the Marsa. Energy
Grid, interconnectors & storage
–Ġenerazzjoni tal-enerġija stabbli (chapter 16, Settur tal-enerġija reżiljenti)
PDF p. 186 (printed p. 184)
16.6 Submissions on a Malta–North Africa electricity link to be analysed to assess viability and next steps. Energy
Grid, interconnectors & storage
–Ġenerazzjoni tal-enerġija stabbli (chapter 16, Settur tal-enerġija reżiljenti)
PDF p. 186 (printed p. 184)
16.7 Hydrogen-ready gas pipeline studies are complete; will keep seeking EU funds for the project, linked to 2050 decarbonisation goals.
Similar wording in its 2022 programme (found automatically, not reviewed): No. 399
Energy
Gas, hydrogen & energy security
2050Ġenerazzjoni tal-enerġija stabbli (chapter 16, Settur tal-enerġija reżiljenti)
PDF p. 186 (printed p. 184)
16.8 Reports major investment in electricity distribution; guarantees the distribution system will not be privatised. Energy
Grid, interconnectors & storage
–L-akbar investiment fid-distribuzzjoni tal-enerġija (chapter 16, Settur tal-enerġija reżiljenti)
PDF p. 187 (printed p. 185)
16.9 New distribution centres at Imsida, Naxxar and Siġġiewi; work on twelve more, including Mater Dei, Ħal Luqa, Mellieħa, Iklin and Rabat–Mtarfa. Energy
Grid, interconnectors & storage
12L-akbar investiment fid-distribuzzjoni tal-enerġija (chapter 16, Settur tal-enerġija reżiljenti)
PDF p. 187 (printed p. 185)
16.10 Reports substation and distribution centre works; will keep investing in new substations and cables for stable, reliable supply.
Similar wording in its 2022 programme (found automatically, not reviewed): No. 383
Energy
Grid, interconnectors & storage
–L-akbar investiment fid-distribuzzjoni tal-enerġija (chapter 16, Settur tal-enerġija reżiljenti)
PDF p. 187 (printed p. 185)
16.11 Reports energy and fuel subsidies above €1 billion that kept bills stable; commits to keeping price stability policy in coming years.
Similar wording in its 2022 programme (found automatically, not reviewed): No. 395
Energy
Bills & tariffs
€1 billionKontijiet irħas u servizz xieraq (chapter 16, Settur tal-enerġija reżiljenti)
PDF p. 187 (printed p. 185)
16.12 New smart meters introduced; meter replacement to continue gradually across the country. Energy
Grid, interconnectors & storage
–Kontijiet irħas u servizz xieraq (chapter 16, Settur tal-enerġija reżiljenti)
PDF p. 187 (printed p. 185)
16.13 Enemalta to get a dedicated control room to monitor the low-voltage network and fix faults faster. Energy
Grid, interconnectors & storage
–Kontijiet irħas u servizz xieraq (chapter 16, Settur tal-enerġija reżiljenti)
PDF p. 187 (printed p. 185)
16.14 Complete solar projects on schools in Ħal Kirkop, San Ġwann, Ħal Għargħur and Wardija; solar on all government entity buildings and schools by 2030. Energy
Rooftop & community generation
2030Enerġija rinnovabbli (chapter 16, Settur tal-enerġija reżiljenti)
PDF p. 188 (printed p. 186)
16.15 Invest in grid connections for unserved areas such as farms and greenhouses to integrate more renewable energy. Energy
Grid, interconnectors & storage
–Enerġija rinnovabbli (chapter 16, Settur tal-enerġija reżiljenti)
PDF p. 188 (printed p. 186)
16.16 Renewable energy included in all new government projects; commits that new public buildings will be climate neutral. Energy
Rooftop & community generation
–Enerġija rinnovabbli (chapter 16, Settur tal-enerġija reżiljenti)
PDF p. 188 (printed p. 186)
16.17 First solar car port projects planned at Ċirkewwa, Marsa and Birżebbuġa, with public car parks identified for solar generation. Energy
Rooftop & community generation
–Enerġija rinnovabbli (chapter 16, Settur tal-enerġija reżiljenti)
PDF p. 188 (printed p. 186)
16.18 Reports solar panels on Water Services Corporation reservoirs and buildings; will collaborate with private reservoir owners to use them as solar farms. Energy
Large-scale & offshore renewables
–Enerġija rinnovabbli (chapter 16, Settur tal-enerġija reżiljenti)
PDF p. 188 (printed p. 186)
16.19 Reports over €150 million invested in water production and distribution; will keep investing in reverse osmosis plants and AI to reduce groundwater dependence. Water
Drinking water supply
€150 millionL-użu tal-ilma (chapter 16, Settur tal-enerġija reżiljenti)
PDF p. 188 (printed p. 186)
16.20 Aim for every home to have tap-water filters; incentives to buy filters continue, plus a free filter for first-time property buyers. Water
Drinking water supply
–L-użu tal-ilma (chapter 16, Settur tal-enerġija reżiljenti)
PDF p. 189 (printed p. 187)
16.21 Water Services Corporation to issue blue bonds for an additional €40 million in reverse osmosis, sewage treatment and new solar plants. Water
Drinking water supply
€40 millionL-użu tal-ilma (chapter 16, Settur tal-enerġija reżiljenti)
PDF p. 189 (printed p. 187)
16.22 New reverse osmosis plant at Ħal Far to strengthen potable water production in the south. Water
Drinking water supply
–L-użu tal-ilma (chapter 16, Settur tal-enerġija reżiljenti)
PDF p. 189 (printed p. 187)
16.23 More tests on inland reverse osmosis so inland industries can have their own facilities. Water
Drinking water supply
–L-użu tal-ilma (chapter 16, Settur tal-enerġija reżiljenti)
PDF p. 189 (printed p. 187)
16.24 Reports reservoir works at Ħal Luqa and Ta’ Ċenċ; will complete works on reservoirs at Ta’ Qali, Naxxar and Ġibjun tal-Fiddien, Rabat. Water
Drinking water supply
–L-użu tal-ilma (chapter 16, Settur tal-enerġija reżiljenti)
PDF p. 189 (printed p. 187)
16.25 Build another reservoir at Tax-Xwieki, Ħal Għargħur, to supply the centre of the country. Water
Drinking water supply
–L-użu tal-ilma (chapter 16, Settur tal-enerġija reżiljenti)
PDF p. 189 (printed p. 187)
16.26 Partner with scientists and researchers on innovative measures to improve underground water storage. Water
Rainwater, groundwater & reuse
–L-użu tal-ilma (chapter 16, Settur tal-enerġija reżiljenti)
PDF p. 189 (printed p. 187)
16.27 After Wied iż-Żurrieq and Ħad-Dingli, extend sewerage in Rabat to serve Raba’ Nemel and Ħofret ir-Rizz for the first time. Water
Sewage & wastewater
–L-użu tal-ilma (chapter 16, Settur tal-enerġija reżiljenti)
PDF p. 189 (printed p. 187)
16.28 Scheme for about 500 apartment families to buy solar panels on Water Services Corporation sites, credited to their bills; to be extended. Energy
Rooftop & community generation
500Familji parteċipi fil-proċess ta’ dikarbonizzazzjoni (chapter 16, Settur tal-enerġija reżiljenti)
PDF p. 190 (printed p. 188)
16.29 Introduce energy sharing so households unable to invest can use other participants' unused renewable energy. Energy
Rooftop & community generation
–Familji parteċipi fil-proċess ta’ dikarbonizzazzjoni (chapter 16, Settur tal-enerġija reżiljenti)
PDF p. 190 (printed p. 188)
16.30 Legal amendments to compensate owners of rooftop solar panels affected by new development nearby. Energy
Rooftop & community generation
–Familji parteċipi fil-proċess ta’ dikarbonizzazzjoni (chapter 16, Settur tal-enerġija reżiljenti)
PDF p. 190 (printed p. 188)
16.31 Continue grants for home and business batteries; project for Enemalta to buy energy stored in private batteries. Energy
Rooftop & community generation
–Familji parteċipi fil-proċess ta’ dikarbonizzazzjoni (chapter 16, Settur tal-enerġija reżiljenti)
PDF p. 190 (printed p. 188)
16.32 Irrinova Darek, piloted in 2022 and covering over 500 properties, to be renewed every year in the next legislature. Energy
Energy efficiency
2022; 500Familji parteċipi fil-proċess ta’ dikarbonizzazzjoni (chapter 16, Settur tal-enerġija reżiljenti)
PDF p. 190 (printed p. 188)
16.33 Refund of up to 100% of planning fees for applicants building sustainably, according to certification level. Energy
Energy efficiency
100%Familji parteċipi fil-proċess ta’ dikarbonizzazzjoni (chapter 16, Settur tal-enerġija reżiljenti)
PDF p. 190 (printed p. 188)
16.34 Refund of up to 25% of cost for families replacing old air conditioners with less polluting ones. Energy
Energy efficiency
25%Familji parteċipi fil-proċess ta’ dikarbonizzazzjoni (chapter 16, Settur tal-enerġija reżiljenti)
PDF p. 191 (printed p. 189)
16.35 Reports the Climate Action Authority set up in 2024; Climate Action Fund to help transport, maritime and aviation operators transition. Climate
Climate policy & institutions
2024Operat industrijali li jħares l-ambjent (chapter 16, Settur tal-enerġija reżiljenti)
PDF p. 191 (printed p. 189)
16.36 Continued direct assistance to enterprises, especially manufacturing, for retrofitting, electrification, cleaner fuel and renewable generation. Climate
Business & industry transition
–Operat industrijali li jħares l-ambjent (chapter 16, Settur tal-enerġija reżiljenti)
PDF p. 191 (printed p. 189)
16.37 Support Malta International Airport to supply grid electricity to parked aircraft, as with ships at the Grand Harbour.
Similar wording in its 2022 programme (found automatically, not reviewed): No. 411
Air & noise
Ships, port & aviation emissions
–Operat industrijali li jħares l-ambjent (chapter 16, Settur tal-enerġija reżiljenti)
PDF p. 191 (printed p. 189)
16.38 SMEs to keep benefiting from tailored schemes to cut costs and reduce environmental impact. Climate
Business & industry transition
–Operat industrijali li jħares l-ambjent (chapter 16, Settur tal-enerġija reżiljenti)
PDF p. 191 (printed p. 189)
16.39 New INDIS renewable energy policy to enable solar panels on more factories under its administration. Energy
Rooftop & community generation
–Operat industrijali li jħares l-ambjent (chapter 16, Settur tal-enerġija reżiljenti)
PDF p. 191 (printed p. 189)
Partit Nazzjonalista (Nationalist Party) · 96 pledges

Nifs Ġdid: Programm Elettorali 2026 (web chapters). Covered: chapter Ambjent (items 01–62, including its climate and animal-welfare sections); chapter Enerġija u Ilma (01–33); plus the Għawdex net-zero item linked to CC-107.

No.Pledge (our summary)SubjectTargetSection and page
– Draw up a clear, realistic plan for Gozo to become a net-zero island by 2040.
Checked: CC-107 A net-zero Gozo by 2040 (pledge: Not measurable)
Climate
Climate targets
2040Għawdex
01 Guarantee at least one genuine park per locality, prioritising trees, shade and natural ground over concrete, with more afforestation and open space in Malta and Gozo. Parks & trees
Green space policy & greening
at least one park per localityParks, spazji miftuħa u kwalità tal‐ħajja (chapter Ambjent)
web chapter (ambjent)
02 Table a Parks Act in Parliament giving a first legal definition of a park and of green space, to stop greenwashing. Parks & trees
Green space policy & greening
–Parks, spazji miftuħa u kwalità tal‐ħajja (chapter Ambjent)
web chapter (ambjent)
03 Set mandatory national minimum standards for parks covering unpaved green area, trees, accessibility, water management, maintenance and protection from development. Parks & trees
Green space policy & greening
–Parks, spazji miftuħa u kwalità tal‐ħajja (chapter Ambjent)
web chapter (ambjent)
04 Prepare a strategic national map of parks and green areas showing where open space is most lacking and where new parks could go. Parks & trees
Green space policy & greening
–Parks, spazji miftuħa u kwalità tal‐ħajja (chapter Ambjent)
web chapter (ambjent)
05 Regenerate public land into parks and green spaces and, where no public land exists, buy land where possible to create open space. Parks & trees
Green space policy & greening
–Parks, spazji miftuħa u kwalità tal‐ħajja (chapter Ambjent)
web chapter (ambjent)
06 Deliver the Santa Venera park: about 16,000 square metres, €26 million, with a park, civic centre and parking. Parks & trees
Urban parks & squares
about 16,000 m²; €26 millionParks, spazji miftuħa u kwalità tal‐ħajja (chapter Ambjent)
web chapter (ambjent)
07 Introduce a 'Clean Malta Guarantee' with mandatory national cleanliness standards per locality, results-based contracts and tougher enforcement against littering. Waste
Litter & street cleaning
–Parks, spazji miftuħa u kwalità tal‐ħajja (chapter Ambjent)
web chapter (ambjent)
08 Give schools, health centres, elderly homes, parks, squares and tourist zones the highest cleaning priority, with more frequent waste collection in tourist areas. Waste
Litter & street cleaning
–Parks, spazji miftuħa u kwalità tal‐ħajja (chapter Ambjent)
web chapter (ambjent)
09 Give the Environment and Resources Authority a decisive, binding say on ODZ applications and sensitive environmental decisions. Environmental governance
Regulators & boards
–Art, ippjanar u ġustizzja ambjentali (chapter Ambjent)
web chapter (ambjent)
10 Give every locality an updated masterplan, revised every ten years, based on public consultation and local carrying capacity. Land use & planning
Planning system & reform
every locality; updated every ten yearsArt, ippjanar u ġustizzja ambjentali (chapter Ambjent)
web chapter (ambjent)
11 Draft a new planning law after open consultation with the public, NGOs, professionals, local councils and Parliament. Land use & planning
Planning system & reform
–Art, ippjanar u ġustizzja ambjentali (chapter Ambjent)
web chapter (ambjent)
12 Halt works on a permit once it is appealed until the final decision, and decide planning appeals within six months. Land use & planning
Permits, appeals & enforcement
appeals decided within 6 monthsArt, ippjanar u ġustizzja ambjentali (chapter Ambjent)
web chapter (ambjent)
13 Improve public access to environmental data, studies and documents, and provide legal aid for public-interest environmental cases. Environmental governance
Rights, transparency & participation
–Art, ippjanar u ġustizzja ambjentali (chapter Ambjent)
web chapter (ambjent)
14 Strengthen the Climate Change Authority with more independence, technical experts and real powers to lead climate policy and adaptation. Climate
Climate policy & institutions
–Tibdil fil‐klima: Malta li tipprepara, tadatta u tmexxi (chapter Ambjent)
web chapter (ambjent)
15 Oblige the Climate Change Authority to publish a clear, updated national climate plan with actions, responsibilities, deadlines and costs. Climate
Climate policy & institutions
–Tibdil fil‐klima: Malta li tipprepara, tadatta u tmexxi (chapter Ambjent)
web chapter (ambjent)
16 Build diplomatic and technical capacity to defend Malta's interests in the EU as a climate-vulnerable island and attract more EU funds. Climate
Climate policy & institutions
–Tibdil fil‐klima: Malta li tipprepara, tadatta u tmexxi (chapter Ambjent)
web chapter (ambjent)
17 Roll out quick measures against urban heat and energy bills, including cool and white roofs, street shade, trees and cooler urban materials. Climate
Adaptation & heat
–Tibdil fil‐klima: Malta li tipprepara, tadatta u tmexxi (chapter Ambjent)
web chapter (ambjent)
18 Launch an investment programme preparing the economy for climate change: clean energy, resilient infrastructure, water systems, circular industry and advanced recycling. Climate
Adaptation & heat
–Tibdil fil‐klima: Malta li tipprepara, tadatta u tmexxi (chapter Ambjent)
web chapter (ambjent)
19 Make climate adaptation a mandatory part of every local plan, masterplan and infrastructure project. Climate
Adaptation & heat
–Tibdil fil‐klima: Malta li tipprepara, tadatta u tmexxi (chapter Ambjent)
web chapter (ambjent)
20 Prioritise nature-based solutions such as tree planting, valley restoration, permeable ground, rain gardens and afforestation against heat, flooding and pollution. Climate
Adaptation & heat
–Tibdil fil‐klima: Malta li tipprepara, tadatta u tmexxi (chapter Ambjent)
web chapter (ambjent)
21 Launch a national climate education programme in schools, communities and industry. Climate
Climate policy & institutions
–Tibdil fil‐klima: Malta li tipprepara, tadatta u tmexxi (chapter Ambjent)
web chapter (ambjent)
22 Expand the national air-quality monitoring network with more stations, more local measurement and more frequent data. Air & noise
Air quality
–Kwalità tal‐arja (chapter Ambjent)
web chapter (ambjent)
23 Introduce a national Air Quality Index published daily with weather forecasts, apps and a live public dashboard by locality. Air & noise
Air quality
–Kwalità tal‐arja (chapter Ambjent)
web chapter (ambjent)
24 Switch waste strategy from waste-to-energy to 'waste-to-product', with better separation, advanced recycling and material recovery. Waste
Treatment & disposal
–Kwalità tal‐arja (chapter Ambjent)
web chapter (ambjent)
25 Create a Malta Nature Network linking Natura 2000 sites, valleys, rubble walls, garrigue and ecological corridors, with compensation for farmers and landowners who maintain them. Nature & Wildlife
Habitats & species
–Natura, kosta u pajsaġġ (chapter Ambjent)
web chapter (ambjent)
26 Give Natura 2000 sites on land and at sea more resources, specialist staff and enforcement, judged by results on the ground. Nature & Wildlife
Habitats & species
–Natura, kosta u pajsaġġ (chapter Ambjent)
web chapter (ambjent)
27 Support ecological restoration of valleys, starting with Wied Qirda, removing invasive species and regenerating habitats. Nature & Wildlife
Habitats & species
–Natura, kosta u pajsaġġ (chapter Ambjent)
web chapter (ambjent)
28 Expand Marine Protected Areas with more monitoring, surveillance and enforcement. Nature & Wildlife
Marine & coastal protection
–Natura, kosta u pajsaġġ (chapter Ambjent)
web chapter (ambjent)
29 Strengthen coastal protection through setback rules, erosion monitoring and climate-adaptation plans for the coast. Climate
Adaptation & heat
–Natura, kosta u pajsaġġ (chapter Ambjent)
web chapter (ambjent)
30 Create more designated swimming zones in key coastal localities. Countryside & coast
Coast, beaches & public domain
–Natura, kosta u pajsaġġ (chapter Ambjent)
web chapter (ambjent)
31 Publish all carrying-capacity studies on Comino and hold a transparent national consultation on its future, with decisions based on science. Countryside & coast
Coast, beaches & public domain
–Natura, kosta u pajsaġġ (chapter Ambjent)
web chapter (ambjent)
32 Adopt a legal framework to protect and manage rural, urban and coastal landscape, and use more 3D mapping and LIDAR data in planning. Land use & planning
Heritage & townscape
–Natura, kosta u pajsaġġ (chapter Ambjent)
web chapter (ambjent)
33 Update light-pollution laws and set standards for artificial lighting near sensitive sites. Nature & Wildlife
Light pollution
–Natura, kosta u pajsaġġ (chapter Ambjent)
web chapter (ambjent)
34 Launch a programme to expand and improve urban green infrastructure, with more trees, shade and natural space under modern standards. Parks & trees
Green space policy & greening
–Kwalità tal‐ħajja u governanza ambjentali (chapter Ambjent)
web chapter (ambjent)
35 Publish a national GIS masterplan showing every greening and green-infrastructure project, expected results and regular progress updates. Parks & trees
Green space policy & greening
–Kwalità tal‐ħajja u governanza ambjentali (chapter Ambjent)
web chapter (ambjent)
36 Reform the Environment and Resources Authority for more independence, accountability and clear performance standards in enforcement. Environmental governance
Regulators & boards
–Kwalità tal‐ħajja u governanza ambjentali (chapter Ambjent)
web chapter (ambjent)
37 Introduce measurable KPIs for environmental agencies tied to biodiversity, quality of life and real environmental results. Environmental governance
Regulators & boards
–Kwalità tal‐ħajja u governanza ambjentali (chapter Ambjent)
web chapter (ambjent)
38 Give incentives for hotels, restaurants, beaches and tour operators to obtain international environmental certification. Climate
Business & industry transition
–Kwalità tal‐ħajja u governanza ambjentali (chapter Ambjent)
web chapter (ambjent)
39 Set statutory noise limits for traffic, plants and industry based on EU and international standards, and expand noise monitoring. Air & noise
Noise
–Kwalità tal‐ħajja u governanza ambjentali (chapter Ambjent)
web chapter (ambjent)
40 Draw up management plans and dedicated funds for walled cities and historic centres such as Mdina, Valletta, Birgu, Isla, Bormla, Rabat and Victoria. Land use & planning
Heritage & townscape
–Inħarsu u nsaħħu l-qalba tal-irħula u l-ibliet (chapter Ambjent)
web chapter (ambjent)
41 Make town and village squares safer to enjoy through traffic systems favouring residents, adequate (including underground) parking, or park-and-ride. Transport
Less traffic, more room for people
–Inħarsu u nsaħħu l-qalba tal-irħula u l-ibliet (chapter Ambjent)
web chapter (ambjent)
42 Return concrete environmental, cleanliness and embellishment responsibilities to local councils, with more funds and autonomy. Environmental governance
Local councils
–Kunsilli Lokali b’saħħithom għalik u għall‐ambjent lokali (chapter Ambjent)
web chapter (ambjent)
43 Update the local council funding formula to reflect population, seasonal pressure, activity levels and actual responsibilities. Environmental governance
Local councils
–Kunsilli Lokali b’saħħithom għalik u għall‐ambjent lokali (chapter Ambjent)
web chapter (ambjent)
44 Introduce revenue sharing so localities receive a fair share of the economic activity that strains their services. Environmental governance
Local councils
–Kunsilli Lokali b’saħħithom għalik u għall‐ambjent lokali (chapter Ambjent)
web chapter (ambjent)
45 Make consultation with local councils mandatory before national projects that directly affect their communities. Environmental governance
Local councils
–Kunsilli Lokali b’saħħithom għalik u għall‐ambjent lokali (chapter Ambjent)
web chapter (ambjent)
46 Return functions such as local road maintenance, aspects of cleaning and local enforcement to local councils. Environmental governance
Local councils
–Kunsilli Lokali b’saħħithom għalik u għall‐ambjent lokali (chapter Ambjent)
web chapter (ambjent)
47 Introduce benchmarking and performance standards for local council services. Environmental governance
Local councils
–Kunsilli Lokali b’saħħithom għalik u għall‐ambjent lokali (chapter Ambjent)
web chapter (ambjent)
48 Give local councils a right to formally raise serious or urgent issues before parliamentary committees. Environmental governance
Local councils
–Kunsilli Lokali b’saħħithom għalik u għall‐ambjent lokali (chapter Ambjent)
web chapter (ambjent)
49 Develop and run a National Veterinary Hospital open 24 hours a day, seven days a week, including nights, weekends and public holidays. Animal welfare
Veterinary care & neutering
24 hours a day, 7 days a weekL‐annimali: tant għeżież fil‐familji tagħna (chapter Ambjent)
web chapter (ambjent)
50 Create a dedicated ministerial portfolio for animal welfare with its own budget and administrative structure. Animal welfare
Animal welfare law & enforcement
–L‐annimali: tant għeżież fil‐familji tagħna (chapter Ambjent)
web chapter (ambjent)
51 Strengthen the independent Commissioner for Animal Welfare, appointed transparently on professional merit, with supervisory and monitoring powers. Animal welfare
Animal welfare law & enforcement
–L‐annimali: tant għeżież fil‐familji tagħna (chapter Ambjent)
web chapter (ambjent)
52 Formally recognise veterinary specialisations and regulate paraveterinary professions with accredited training and modern standards. Animal welfare
Veterinary care & neutering
–L‐annimali: tant għeżież fil‐familji tagħna (chapter Ambjent)
web chapter (ambjent)
53 Create pet cemeteries and cremation facilities in Malta and Gozo run to environmental and sanitary standards. Animal welfare
Pets in public life
–L‐annimali: tant għeżież fil‐familji tagħna (chapter Ambjent)
web chapter (ambjent)
54 Substantially strengthen enforcement against animal cruelty and neglect through more inspections, specialised training and more deterrent penalties. Animal welfare
Animal welfare law & enforcement
–L‐annimali: tant għeżież fil‐familji tagħna (chapter Ambjent)
web chapter (ambjent)
55 Introduce a positive list of species that may legally be kept as pets, and a temporary centre for confiscated exotic animals. Animal welfare
Animal welfare law & enforcement
–L‐annimali: tant għeżież fil‐familji tagħna (chapter Ambjent)
web chapter (ambjent)
56 Extend compulsory microchipping to more species where needed and strengthen responsible-ownership rules, registers and education. Animal welfare
Animal welfare law & enforcement
–L‐annimali: tant għeżież fil‐familji tagħna (chapter Ambjent)
web chapter (ambjent)
57 Expand regional shelters, re-homing and adoption centres in Malta and Gozo, with rehabilitation and qualified trainers and behaviourists. Animal welfare
Shelters, strays & adoption
–L‐annimali: tant għeżież fil‐familji tagħna (chapter Ambjent)
web chapter (ambjent)
58 Make essential veterinary care, veterinary medicines and sterilisation more affordable, including through fairer tax treatment. Animal welfare
Veterinary care & neutering
–L‐annimali: tant għeżież fil‐familji tagħna (chapter Ambjent)
web chapter (ambjent)
59 Introduce proportionate licensing for certain categories of animals to reduce abandonment and promote responsible ownership. Animal welfare
Animal welfare law & enforcement
–L‐annimali: tant għeżież fil‐familji tagħna (chapter Ambjent)
web chapter (ambjent)
60 Encourage wider use of pet insurance, promoting products that do not discriminate between breeds. Animal welfare
Veterinary care & neutering
–L‐annimali: tant għeżież fil‐familji tagħna (chapter Ambjent)
web chapter (ambjent)
61 Introduce community animal wardens coordinated between local councils and the Animal Welfare Directorate. Animal welfare
Animal welfare law & enforcement
–L‐annimali: tant għeżież fil‐familji tagħna (chapter Ambjent)
web chapter (ambjent)
62 Provide more help to animal feeders through food, medicine, veterinary services and neutering programmes. Animal welfare
Shelters, strays & adoption
–L‐annimali: tant għeżież fil‐familji tagħna (chapter Ambjent)
web chapter (ambjent)
01 Guarantee that electricity and water tariffs will not rise, subsidising energy and fuel prices when needed while investing in renewables to cut subsidy costs. Energy
Bills & tariffs
–Kontijiet orħos u tariffi ġusti (chapter Enerġija u Ilma)
web chapter (kontijiet-orhos-u-tariffi-gusti)
02 Abolish the electricity meter rent (service charge) on every residence; stated annual savings €65 single-phase, €140 three-phase 40A, €195 three-phase 60A. Energy
Bills & tariffs
€65 / €140 / €195 a year by supply typeKontijiet orħos u tariffi ġusti (chapter Enerġija u Ilma)
web chapter (kontijiet-orhos-u-tariffi-gusti)
03 Abolish the €0.1298 residential band so the cheapest €0.1047 rate covers the first 6,000 units; stated saving up to €100.40 a year. Energy
Bills & tariffs
€0.1047 up to 6,000 units; up to €100.40 a yearKontijiet orħos u tariffi ġusti (chapter Enerġija u Ilma)
web chapter (kontijiet-orhos-u-tariffi-gusti)
04 Keep the 25% eco-reduction for single-person households but raise its eligibility ceiling from 2,000 to 3,000 units a year. Energy
Bills & tariffs
25% eco-reduction; limit 2,000 to 3,000 units a year; stated €168.63 a year total savingKontijiet orħos u tariffi ġusti (chapter Enerġija u Ilma)
web chapter (kontijiet-orhos-u-tariffi-gusti)
05 Create a new tariff for registered farmers, livestock breeders and voluntary organisations, set at a 15% discount on all non-residential rates. Energy
Bills & tariffs
15% discount on non-residential ratesKontijiet orħos u tariffi ġusti (chapter Enerġija u Ilma)
web chapter (kontijiet-orhos-u-tariffi-gusti)
06 Remove meter rent for the agricultural sector and voluntary organisations; stated annual savings €120, €240 and €360 by supply type. Energy
Bills & tariffs
€120 / €240 / €360 a year by supply typeKontijiet orħos u tariffi ġusti (chapter Enerġija u Ilma)
web chapter (kontijiet-orhos-u-tariffi-gusti)
07 Introduce a clearer standardised electricity and water bill and automatic notification of eligibility for eco-reduction, feed-in tariffs and similar schemes. Energy
Bills & tariffs
–Kontijiet orħos u tariffi ġusti (chapter Enerġija u Ilma)
web chapter (kontijiet-orhos-u-tariffi-gusti)
08 Reach 30% of electricity generated from renewable sources by 2030, partly to offset the roughly €30 million yearly cost of the bill-reduction package. Energy
Large-scale & offshore renewables
30% renewable electricity by 2030; ~€30 million a year cost; ~5 percentage points increaseEnerġija nadifa u sistema aktar intelliġenti (chapter Enerġija u Ilma)
web chapter (energija-u-ilma)
09 Introduce a grant for households to upgrade older solar PV systems without removing the whole installation. Energy
Rooftop & community generation
–Enerġija nadifa u sistema aktar intelliġenti (chapter Enerġija u Ilma)
web chapter (energija-u-ilma)
10 Introduce a scheme encouraging new apartment blocks and condominiums to include shared or per-flat solar systems from the design stage. Energy
Rooftop & community generation
–Enerġija nadifa u sistema aktar intelliġenti (chapter Enerġija u Ilma)
web chapter (energija-u-ilma)
11 Continue and strengthen support for batteries in homes and small businesses that already have solar panels. Energy
Rooftop & community generation
–Enerġija nadifa u sistema aktar intelliġenti (chapter Enerġija u Ilma)
web chapter (energija-u-ilma)
12 Invest in solar canopies over public car parks, industrial zones and schools. Energy
Rooftop & community generation
–Enerġija nadifa u sistema aktar intelliġenti (chapter Enerġija u Ilma)
web chapter (energija-u-ilma)
13 Run a national programme to put solar panels with battery storage on every feasible public roof. Energy
Rooftop & community generation
–Enerġija nadifa u sistema aktar intelliġenti (chapter Enerġija u Ilma)
web chapter (energija-u-ilma)
14 Push ahead with a floating offshore wind project, with transparent procurement, studies and timely grid integration. Energy
Large-scale & offshore renewables
–Enerġija nadifa u sistema aktar intelliġenti (chapter Enerġija u Ilma)
web chapter (energija-u-ilma)
15 Run pilot community-battery projects in localities with many apartments. Energy
Rooftop & community generation
–Enerġija nadifa u sistema aktar intelliġenti (chapter Enerġija u Ilma)
web chapter (energija-u-ilma)
16 Open a national process on solar rights so that PV owners do not lose their investment when neighbouring development overshadows them. Energy
Rooftop & community generation
–Enerġija nadifa u sistema aktar intelliġenti (chapter Enerġija u Ilma)
web chapter (energija-u-ilma)
17 Create a shared solar scheme on public buildings in which people without a roof can buy a tradeable share. Energy
Rooftop & community generation
–Enerġija nadifa u sistema aktar intelliġenti (chapter Enerġija u Ilma)
web chapter (energija-u-ilma)
18 Invest heavily in feeders, substations, transformers and digital monitoring to strengthen the distribution network and drastically cut blackouts. Energy
Grid, interconnectors & storage
–Sigurtà tal‐enerġija u infrastruttura moderna (chapter Enerġija u Ilma)
web chapter (energija-u-ilma)
19 Launch a heatwave resilience plan for the localities hit hardest, with real-time digital network monitoring. Energy
Grid, interconnectors & storage
–Sigurtà tal‐enerġija u infrastruttura moderna (chapter Enerġija u Ilma)
web chapter (energija-u-ilma)
20 Begin strategic planning for a third and fourth interconnector landing in different areas, including possibly to North Africa. Energy
Grid, interconnectors & storage
–Sigurtà tal‐enerġija u infrastruttura moderna (chapter Enerġija u Ilma)
web chapter (energija-u-ilma)
21 Study and plan a hydrogen-ready pipeline compatible with future European networks. Energy
Gas, hydrogen & energy security
–Sigurtà tal‐enerġija u infrastruttura moderna (chapter Enerġija u Ilma)
web chapter (energija-u-ilma)
22 Empower the energy and water regulator (REWS) to impose a service-availability guarantee and automatic compensation for blackouts and poor voltage. Energy
Grid, interconnectors & storage
–Sigurtà tal‐enerġija u infrastruttura moderna (chapter Enerġija u Ilma)
web chapter (energija-u-ilma)
23 Review the main energy contracts and set a principle of always buying energy from the cheapest secure and reliable source. Energy
Gas, hydrogen & energy security
–Sigurtà tal‐enerġija u infrastruttura moderna (chapter Enerġija u Ilma)
web chapter (energija-u-ilma)
24 Continue and strengthen the grant for replacing old water heaters with heat-pump water heaters. Energy
Energy efficiency
–Enerġija għad‐djar, in‐negozji u t‐trasport (chapter Enerġija u Ilma)
web chapter (energija-u-ilma)
25 Create a tax credit for landlords who make sustainability upgrades to rented property, tied to minimum efficiency standards and registered leases. Energy
Energy efficiency
–Enerġija għad‐djar, in‐negozji u t‐trasport (chapter Enerġija u Ilma)
web chapter (energija-u-ilma)
26 Strengthen energy-efficiency schemes for SMEs such as hotels, shops, restaurants and workshops. Energy
Energy efficiency
–Enerġija għad‐djar, in‐negozji u t‐trasport (chapter Enerġija u Ilma)
web chapter (energija-u-ilma)
27 Create a framework of long-term clean-energy contracts for large energy-consuming companies. Energy
Gas, hydrogen & energy security
–Enerġija għad‐djar, in‐negozji u t‐trasport (chapter Enerġija u Ilma)
web chapter (energija-u-ilma)
28 Invest in electric bus depots, chargers and gradual conversion of the public bus fleet, and increase support for switching private cars to electric or hybrid. Transport
Cleaner vehicles
–Enerġija għad‐djar, in‐negozji u t‐trasport (chapter Enerġija u Ilma)
web chapter (energija-u-ilma)
29 Link stamp duty and other incentives to a building's Energy Performance Certificate rating, sustainable materials and passive design. Energy
Energy efficiency
–Enerġija għad‐djar, in‐negozji u t‐trasport (chapter Enerġija u Ilma)
web chapter (energija-u-ilma)
30 Cut the home electric-vehicle charging rate from 12.98c to the cheapest 10.47c rate. Energy
Bills & tariffs
from 12.98c to 10.47c per unitEnerġija għad‐djar, in‐negozji u t‐trasport (chapter Enerġija u Ilma)
web chapter (energija-u-ilma)
31 Run a pilot project and targeted scheme to recharge groundwater by returning rainwater to the aquifer. Water
Rainwater, groundwater & reuse
–Is‐sigurtà fil‐provvista tal‐ilma (chapter Enerġija u Ilma)
web chapter (energija-u-ilma)
32 Launch schemes encouraging small-scale greywater treatment and reuse in homes. Water
Rainwater, groundwater & reuse
–Is‐sigurtà fil‐provvista tal‐ilma (chapter Enerġija u Ilma)
web chapter (energija-u-ilma)
33 Install a network of solar-powered drinking-water fountains in squares and tourist spots to cut plastic use. Water
Drinking water supply