<?xml version="1.0" encoding="utf-8"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en-GB">
  <title>Miżien: claims by Interconnect Malta</title>
  <subtitle>Updates to the checks of claims by Interconnect Malta: new claims, verdicts, report versions and replies. A record, not a score.</subtitle>
  <id>https://leandergrech.github.io/Mizien/bodies/interconnect-malta/</id>
  <link rel="self" type="application/atom+xml" href="https://leandergrech.github.io/Mizien/bodies/interconnect-malta/feed.xml"/>
  <link rel="alternate" type="text/html" href="https://leandergrech.github.io/Mizien/bodies/interconnect-malta/"/>
  <updated>2026-10-06T12:00:00Z</updated>
  <author><name>Miżien</name></author>
  <entry>
    <id>tag:leandergrech.github.io,2026:mizien:CC-029:2026-10-06:check-started:worker-b-took-the-claim-maintainer-unblock-primary-source-md-tvm-news-and-newsbook-re-read-in-full-icm-project-page-news-list-and-tenders-page-read-offshorewind-biz-and-windtech-read</id>
    <title>CC-029 First offshore wind farm: Check started (Worker B took the claim (maintainer unblock, primary-source.md). TVM News and Newsbook re-read in full; ICM project page, news list and tenders page read; offshoreWIND.biz and Windtech read.)</title>
    <updated>2026-10-06T12:00:00Z</updated>
    <link rel="alternate" type="text/html" href="https://leandergrech.github.io/Mizien/claims/CC-029/"/>
    <summary type="text">Check started: Worker B took the claim (maintainer unblock, primary-source.md). TVM News and Newsbook re-read in full; ICM project page, news list and tenders page read; offshoreWIND.biz and Windtech read.. CC-029, Climate &amp; Energy; verdict so far: Largely supported (draft, pending right of reply).</summary>
  </entry>
  <entry>
    <id>tag:leandergrech.github.io,2026:mizien:CC-029:2026-10-06:exact-wording-found:verbatim-found-minister-dalli-quoted-in-quotation-marks-tvm-news-newsbook-22-jul-2025-the-ministry-statement-300-mw-beyond-territorial-waters-timetable-is-reported-without-quotation-marks</id>
    <title>CC-029 First offshore wind farm: Exact wording found (Verbatim found: Minister Dalli quoted in quotation marks (TVM News, Newsbook, 22 Jul 2025); the ministry statement (300 MW, beyond territorial waters, timetable) is reported without quotation marks.)</title>
    <updated>2026-10-06T12:00:00Z</updated>
    <link rel="alternate" type="text/html" href="https://leandergrech.github.io/Mizien/claims/CC-029/"/>
    <summary type="text">Exact wording found: Verbatim found: Minister Dalli quoted in quotation marks (TVM News, Newsbook, 22 Jul 2025); the ministry statement (300 MW, beyond territorial waters, timetable) is reported without quotation marks.. CC-029, Climate &amp; Energy; verdict so far: Largely supported (draft, pending right of reply).</summary>
  </entry>
  <entry>
    <id>tag:leandergrech.github.io,2026:mizien:CC-029:2026-10-06:note:eurostat-nrg-cb-e-downloaded-output-and-share-checks-in-tools-cc-029-report-calc-py-data-cc-029-checks-csv-searched-for-a-public-notice-of-the-next-stage-none-found</id>
    <title>CC-029 First offshore wind farm: Note (Eurostat nrg_cb_e downloaded; output and share checks in tools/cc-029-report/calc.py (data/cc-029/checks.csv). Searched for a public notice of the next stage: none found.)</title>
    <updated>2026-10-06T12:00:00Z</updated>
    <link rel="alternate" type="text/html" href="https://leandergrech.github.io/Mizien/claims/CC-029/"/>
    <summary type="text">Note: Eurostat nrg_cb_e downloaded; output and share checks in tools/cc-029-report/calc.py (data/cc-029/checks.csv). Searched for a public notice of the next stage: none found.. CC-029, Climate &amp; Energy; verdict so far: Largely supported (draft, pending right of reply).</summary>
  </entry>
  <entry>
    <id>tag:leandergrech.github.io,2026:mizien:CC-029:2026-10-06:version-1-0-first-issue:first-issue-verdict-largely-supported-moderate-confidence-pledge-label-off-track-as-of-6-oct-2026-pending-right-of-reply</id>
    <title>CC-029 First offshore wind farm: Version 1.0: first issue (First issue. Verdict Largely supported (moderate confidence); pledge label Off track (as of 6 Oct 2026); pending right of reply.)</title>
    <updated>2026-10-06T12:00:00Z</updated>
    <link rel="alternate" type="text/html" href="https://leandergrech.github.io/Mizien/claims/CC-029/"/>
    <summary type="text">Version 1.0: first issue: First issue. Verdict Largely supported (moderate confidence); pledge label Off track (as of 6 Oct 2026); pending right of reply.. CC-029, Climate &amp; Energy; verdict so far: Largely supported (draft, pending right of reply).</summary>
  </entry>
  <entry>
    <id>tag:leandergrech.github.io,2026:mizien:CC-029:2026-10-06:note:audit-follow-up-research-icm-post-list-read-through-its-website-post-list-22-posts-1-jun-2025-to-3-oct-2026-none-on-the-offshore-wind-qualification-or-dialogue-stage-maltatoday-report-of-4-aug-2025-read-in-full-via-the-internet-archive-newsbook-text-and-date-checked-via-the-internet-archive-web-searches-repeated-log-in-literature-cc-029-notes-md</id>
    <title>CC-029 First offshore wind farm: Note (Audit follow-up research: ICM post list read through its website post list (22 posts, 1 Jun 2025 to 3 Oct 2026; none on the offshore wind qualification or dialogue stage); MaltaToday report of 4 Aug 2025 read in full via the Internet Archive; Newsbook text and date checked via the Internet Archive; web searches repeated. Log in literature/CC-029/notes.md.)</title>
    <updated>2026-10-06T12:00:00Z</updated>
    <link rel="alternate" type="text/html" href="https://leandergrech.github.io/Mizien/claims/CC-029/"/>
    <summary type="text">Note: Audit follow-up research: ICM post list read through its website post list (22 posts, 1 Jun 2025 to 3 Oct 2026; none on the offshore wind qualification or dialogue stage); MaltaToday report of 4 Aug 2025 read in full via the Internet Archive; Newsbook text and date checked via the Internet Archive; web searches repeated. Log in literature/CC-029/notes.md.. CC-029, Climate &amp; Energy; verdict so far: Largely supported (draft, pending right of reply).</summary>
  </entry>
  <entry>
    <id>tag:leandergrech.github.io,2026:mizien:CC-029:2026-10-06:version-1-1:1-1-corrections-after-the-6-oct-2026-audit-maltatoday-source-read-and-cited-exactly-search-log-for-the-absence-of-a-notice-tl-dr-and-flyer-wording-newsbook-quotation-checked-source-notes-verdict-largely-supported-and-pledge-label-off-track-unchanged-pending-right-of-reply</id>
    <title>CC-029 First offshore wind farm: Version 1.1 (1.1: corrections after the 6 Oct 2026 audit: MaltaToday source read and cited exactly; search log for the absence of a notice; TL;DR and flyer wording; Newsbook quotation checked; source notes. Verdict (Largely supported) and pledge label (Off track) unchanged; pending right of reply.)</title>
    <updated>2026-10-06T12:00:00Z</updated>
    <link rel="alternate" type="text/html" href="https://leandergrech.github.io/Mizien/claims/CC-029/"/>
    <summary type="text">Version 1.1: 1.1: corrections after the 6 Oct 2026 audit: MaltaToday source read and cited exactly; search log for the absence of a notice; TL;DR and flyer wording; Newsbook quotation checked; source notes. Verdict (Largely supported) and pledge label (Off track) unchanged; pending right of reply.. CC-029, Climate &amp; Energy; verdict so far: Largely supported (draft, pending right of reply).</summary>
  </entry>
  <entry>
    <id>tag:leandergrech.github.io,2026:mizien:CC-029:2026-10-06:note:pledge-linked-to-labour-manifesto-2022-pledge-397-same-cycle-offshore-renewables-with-the-private-sector-including-floating-wind-no-capacity-or-date-is-stated-in-the-manifesto-search-recorded</id>
    <title>CC-029 First offshore wind farm: Note (Pledge linked to Labour manifesto 2022 pledge 397 (same cycle): offshore renewables with the private sector, including floating wind; no capacity or date is stated in the manifesto. Search recorded.)</title>
    <updated>2026-10-06T12:00:00Z</updated>
    <link rel="alternate" type="text/html" href="https://leandergrech.github.io/Mizien/claims/CC-029/"/>
    <summary type="text">Note: Pledge linked to Labour manifesto 2022 pledge 397 (same cycle): offshore renewables with the private sector, including floating wind; no capacity or date is stated in the manifesto. Search recorded.. CC-029, Climate &amp; Energy; verdict so far: Largely supported (draft, pending right of reply).</summary>
  </entry>
  <entry>
    <id>tag:leandergrech.github.io,2026:mizien:CC-029:2026-10-06:evidence-reviewed</id>
    <title>CC-029 First offshore wind farm: Evidence reviewed</title>
    <updated>2026-10-06T12:00:00Z</updated>
    <link rel="alternate" type="text/html" href="https://leandergrech.github.io/Mizien/claims/CC-029/"/>
    <summary type="text">Evidence reviewed. CC-029, Climate &amp; Energy; verdict so far: Largely supported (draft, pending right of reply).</summary>
  </entry>
  <entry>
    <id>tag:leandergrech.github.io,2026:mizien:CC-029:2026-10-06:pledge-label-off-track:qualifying-candidates-informed-of-the-next-phase-by-the-first-part-of-2026</id>
    <title>CC-029 First offshore wind farm: Pledge label: Off track (Qualifying candidates informed of the next phase by the first part of 2026)</title>
    <updated>2026-10-06T12:00:00Z</updated>
    <link rel="alternate" type="text/html" href="https://leandergrech.github.io/Mizien/claims/CC-029/"/>
    <summary type="text">Pledge label: Off track: Qualifying candidates informed of the next phase by the first part of 2026. CC-029, Climate &amp; Energy; verdict so far: Largely supported (draft, pending right of reply).</summary>
  </entry>
  <entry>
    <id>tag:leandergrech.github.io,2026:mizien:CC-029:2026-10-06:correction:maltatoday-reference-4-aug-2025-karl-azzopardi-now-cited-with-its-archived-title-and-read-in-full-replacing-a-second-hand-search-summary-the-ministers-april-2026-dialogue-date-and-end-2027-selection-come-from-that-read-absence-of-a-public-notice-now-stated-as-what-was-searched-22-icm-posts-since-june-2025-tenders-page-web-searches-tl-dr-no-longer-says-the-timetable-has-slipped-dallis-important-step-forward-words-attributed-to-newsbooks-text-tvm-paraphrases-without-quotation-marks</id>
    <title>CC-029 First offshore wind farm: Correction (MaltaToday reference (4 Aug 2025, Karl Azzopardi) now cited with its archived title and read in full, replacing a second-hand search summary; the minister&#39;s April 2026 dialogue date and end-2027 selection come from that read. Absence of a public notice now stated as what was searched (22 ICM posts since June 2025, tenders page, web searches). TL;DR no longer says the timetable &quot;has slipped&quot;. Dalli&#39;s &quot;important step forward&quot; words attributed to Newsbook&#39;s text (TVM paraphrases without quotation marks).)</title>
    <updated>2026-10-06T12:00:00Z</updated>
    <link rel="alternate" type="text/html" href="https://leandergrech.github.io/Mizien/claims/CC-029/"/>
    <summary type="text">Correction: MaltaToday reference (4 Aug 2025, Karl Azzopardi) now cited with its archived title and read in full, replacing a second-hand search summary; the minister&#39;s April 2026 dialogue date and end-2027 selection come from that read. Absence of a public notice now stated as what was searched (22 ICM posts since June 2025, tenders page, web searches). TL;DR no longer says the timetable &quot;has slipped&quot;. Dalli&#39;s &quot;important step forward&quot; words attributed to Newsbook&#39;s text (TVM paraphrases without quotation marks).. CC-029, Climate &amp; Energy; verdict so far: Largely supported (draft, pending right of reply).</summary>
  </entry>
  <entry>
    <id>tag:leandergrech.github.io,2026:mizien:CC-029:2026-10-06:clarification:flyer-removed-the-unsourced-inference-that-a-concession-looks-later-claim-yml-source-notes-made-specific-eurostat-marked-as-a-scale-check-only-right-of-reply-pending-the-check-of-icm-news-back-to-july-2025-is-complete</id>
    <title>CC-029 First offshore wind farm: Clarification (Flyer: removed the unsourced inference that a concession looks later. claim.yml source notes made specific; Eurostat marked as a scale check only. Right of reply pending (the check of ICM news back to July 2025 is complete).)</title>
    <updated>2026-10-06T12:00:00Z</updated>
    <link rel="alternate" type="text/html" href="https://leandergrech.github.io/Mizien/claims/CC-029/"/>
    <summary type="text">Clarification: Flyer: removed the unsourced inference that a concession looks later. claim.yml source notes made specific; Eurostat marked as a scale check only. Right of reply pending (the check of ICM news back to July 2025 is complete).. CC-029, Climate &amp; Energy; verdict so far: Largely supported (draft, pending right of reply).</summary>
  </entry>
  <entry>
    <id>tag:leandergrech.github.io,2026:mizien:CC-029:2026-10-04:added-to-the-claims-to-check</id>
    <title>CC-029 First offshore wind farm: Added to the claims to check</title>
    <updated>2026-10-04T12:00:00Z</updated>
    <link rel="alternate" type="text/html" href="https://leandergrech.github.io/Mizien/claims/CC-029/"/>
    <summary type="text">Added to the claims to check. CC-029, Climate &amp; Energy; verdict so far: Largely supported (draft, pending right of reply).</summary>
  </entry>
  <entry>
    <id>tag:leandergrech.github.io,2026:mizien:CC-023:2026-10-04:added-to-the-claims-to-check</id>
    <title>CC-023 Second interconnector by 2026: Added to the claims to check</title>
    <updated>2026-10-04T12:00:00Z</updated>
    <link rel="alternate" type="text/html" href="https://leandergrech.github.io/Mizien/claims/CC-023/"/>
    <summary type="text">Added to the claims to check. CC-023, Climate &amp; Energy.</summary>
  </entry>
  <entry>
    <id>tag:leandergrech.github.io,2026:mizien:CC-023:2026-10-04:check-started:worker-a-attempt-1-blocked-on-source-no-statement-found-saying-the-second-interconnector-is-on-track-for-2026-newsbook-5-jul-2021-has-minister-dalli-giving-2025-200-mw-ragusa-needed-the-dated-primary-statement</id>
    <title>CC-023 Second interconnector by 2026: Check started (Worker A, attempt 1: blocked on source. No statement found saying the second interconnector is on track for 2026; Newsbook (5 Jul 2021) has Minister Dalli giving 2025 (200 MW, Ragusa). Needed: the dated primary statement.)</title>
    <updated>2026-10-04T12:00:00Z</updated>
    <link rel="alternate" type="text/html" href="https://leandergrech.github.io/Mizien/claims/CC-023/"/>
    <summary type="text">Check started: Worker A, attempt 1: blocked on source. No statement found saying the second interconnector is on track for 2026; Newsbook (5 Jul 2021) has Minister Dalli giving 2025 (200 MW, Ragusa). Needed: the dated primary statement.. CC-023, Climate &amp; Energy.</summary>
  </entry>

</feed>
