<?xml version="1.0" encoding="utf-8"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en-GB">
  <title>Miżien: claims by Partit Laburista (Labour Party)</title>
  <subtitle>Updates to the checks of claims by Partit Laburista (Labour Party): new claims, verdicts, report versions and replies. A record, not a score.</subtitle>
  <id>https://leandergrech.github.io/Mizien/bodies/pl/</id>
  <link rel="self" type="application/atom+xml" href="https://leandergrech.github.io/Mizien/bodies/pl/feed.xml"/>
  <link rel="alternate" type="text/html" href="https://leandergrech.github.io/Mizien/bodies/pl/"/>
  <updated>2026-10-05T12:00:00Z</updated>
  <author><name>Miżien</name></author>
  <entry>
    <id>tag:leandergrech.github.io,2026:mizien:CC-011:2026-10-05:version-1-2:split-at-the-maintainer-s-request-this-check-now-covers-labour-s-ten-minute-pledge-only-under-the-title-ten-minutes-walk-to-green-space-the-pn-s-net-zero-gozo-pledge-and-its-arithmetic-are-now-claim-check-107-labour-s-analysis-and-numbers-are-unchanged-references-renumbered-verdict-and-confidence-unchanged</id>
    <title>CC-011 Ten minutes&#39; walk to green space: Version 1.2 (Split at the maintainer’s request: this check now covers Labour’s ten-minute pledge only, under the title “Ten minutes’ walk to green space”. The PN’s net-zero Gozo pledge and its arithmetic are now Claim Check 107. Labour’s analysis and numbers are unchanged; references renumbered. Verdict and confidence unchanged.)</title>
    <updated>2026-10-05T12:00:00Z</updated>
    <link rel="alternate" type="text/html" href="https://leandergrech.github.io/Mizien/claims/CC-011/"/>
    <summary type="text">Version 1.2: Split at the maintainer’s request: this check now covers Labour’s ten-minute pledge only, under the title “Ten minutes’ walk to green space”. The PN’s net-zero Gozo pledge and its arithmetic are now Claim Check 107. Labour’s analysis and numbers are unchanged; references renumbered. Verdict and confidence unchanged.. CC-011, Governance &amp; Promises; pledge label so far: Not measurable (draft, pending right of reply).</summary>
  </entry>
  <entry>
    <id>tag:leandergrech.github.io,2026:mizien:CC-011:2026-10-05:version-1-3:maintainer-decision-5-oct-2026-pledges-get-one-of-six-pledge-labels-instead-of-a-verdict-methodology-pledges-this-pure-pledge-check-is-now-labelled-not-measurable-as-of-5-october-2026-in-place-of-the-verdict-not-substantiated-moderate-the-analysis-and-numbers-are-unchanged-appendix-a-lists-the-pledge-labels</id>
    <title>CC-011 Ten minutes&#39; walk to green space: Version 1.3 (Maintainer decision (5 Oct 2026): pledges get one of six pledge labels instead of a verdict (methodology, Pledges). This pure pledge check is now labelled “Not measurable” as of 5 October 2026 in place of the verdict “Not substantiated” (moderate); the analysis and numbers are unchanged. Appendix A lists the pledge labels.)</title>
    <updated>2026-10-05T12:00:00Z</updated>
    <link rel="alternate" type="text/html" href="https://leandergrech.github.io/Mizien/claims/CC-011/"/>
    <summary type="text">Version 1.3: Maintainer decision (5 Oct 2026): pledges get one of six pledge labels instead of a verdict (methodology, Pledges). This pure pledge check is now labelled “Not measurable” as of 5 October 2026 in place of the verdict “Not substantiated” (moderate); the analysis and numbers are unchanged. Appendix A lists the pledge labels.. CC-011, Governance &amp; Promises; pledge label so far: Not measurable (draft, pending right of reply).</summary>
  </entry>
  <entry>
    <id>tag:leandergrech.github.io,2026:mizien:CC-011:2026-10-05:evidence-reviewed</id>
    <title>CC-011 Ten minutes&#39; walk to green space: Evidence reviewed</title>
    <updated>2026-10-05T12:00:00Z</updated>
    <link rel="alternate" type="text/html" href="https://leandergrech.github.io/Mizien/claims/CC-011/"/>
    <summary type="text">Evidence reviewed. CC-011, Governance &amp; Promises; pledge label so far: Not measurable (draft, pending right of reply).</summary>
  </entry>
  <entry>
    <id>tag:leandergrech.github.io,2026:mizien:CC-011:2026-10-05:pledge-label-not-measurable:every-person-no-more-than-ten-minutes-walk-from-an-open-or-green-space</id>
    <title>CC-011 Ten minutes&#39; walk to green space: Pledge label: Not measurable (Every person no more than ten minutes&#39; walk from an open or green space)</title>
    <updated>2026-10-05T12:00:00Z</updated>
    <link rel="alternate" type="text/html" href="https://leandergrech.github.io/Mizien/claims/CC-011/"/>
    <summary type="text">Pledge label: Not measurable: Every person no more than ten minutes&#39; walk from an open or green space. CC-011, Governance &amp; Promises; pledge label so far: Not measurable (draft, pending right of reply).</summary>
  </entry>
  <entry>
    <id>tag:leandergrech.github.io,2026:mizien:CC-011:2026-10-05:version-1-1-corrections:corrections-the-flyer-said-that-read-broadly-the-pledge-is-met-today-it-now-says-already-almost-met-as-the-report-does-a-screening-estimate-the-unsourced-seat-count-36-seats-to-29-is-removed-the-30-may-2026-election-is-now-sourced-verdict-and-confidence-unchanged</id>
    <title>CC-011 Ten minutes&#39; walk to green space: Version 1.1: corrections (Corrections: the flyer said that, read broadly, the pledge “is met today”; it now says “already almost met”, as the report does (a screening estimate). The unsourced seat count (“36 seats to 29”) is removed; the 30 May 2026 election is now sourced. Verdict and confidence unchanged.)</title>
    <updated>2026-10-05T12:00:00Z</updated>
    <link rel="alternate" type="text/html" href="https://leandergrech.github.io/Mizien/claims/CC-011/"/>
    <summary type="text">Version 1.1: corrections: Corrections: the flyer said that, read broadly, the pledge “is met today”; it now says “already almost met”, as the report does (a screening estimate). The unsourced seat count (“36 seats to 29”) is removed; the 30 May 2026 election is now sourced. Verdict and confidence unchanged.. CC-011, Governance &amp; Promises; pledge label so far: Not measurable (draft, pending right of reply).</summary>
  </entry>
  <entry>
    <id>tag:leandergrech.github.io,2026:mizien:CC-010:2026-10-05:version-1-2:upgrade-1-new-figure-1-trees-reported-more-than-8-000-in-2024-about-60-000-and-more-than-57-000-by-end-2025-against-the-five-year-window-of-pledge-305-75-elapsed-by-end-2025-the-30-may-2026-election-at-84-with-shrubs-and-vouchers-kept-out-it-replaces-the-section-2-tiles-2-searched-for-a-count-after-the-30-may-2026-election-project-green-s-news-to-5-october-2026-web-searches-none-found-3-new-sub-claim-table-in-section-4-a-d-tl-dr-a-tile-verdict-box-cover-note-flyer-and-claim-yml-updated-version-and-date-added-to-the-cover-cover-page-footer-and-flyer-pending-right-of-reply-right-of-reply-not-sought-matching-the-text-maintainer-decision-5-oct-2026-pledge-delivery-rated-separately-as-not-substantiated-overall-verdict-unchanged</id>
    <title>CC-010 Tree-planting counts: Version 1.2 (Upgrade: (1) New Figure 1, trees reported (more than 8,000 in 2024; about 60,000 and more than 57,000 by end-2025) against the five-year window of pledge 305 (75% elapsed by end-2025; the 30 May 2026 election at 84%), with shrubs and vouchers kept out; it replaces the Section 2 tiles. (2) Searched for a count after the 30 May 2026 election (Project Green’s news to 5 October 2026; web searches): none found. (3) New sub-claim table in Section 4 (A–D); TL;DR, a tile, verdict box, cover note, flyer and claim.yml updated. Version and date added to the cover. Cover, page footer and flyer: “pending right of reply” → “right of reply not sought”, matching the text. Maintainer decision (5 Oct 2026): pledge delivery rated separately as Not substantiated; overall verdict unchanged.)</title>
    <updated>2026-10-05T12:00:00Z</updated>
    <link rel="alternate" type="text/html" href="https://leandergrech.github.io/Mizien/claims/CC-010/"/>
    <summary type="text">Version 1.2: Upgrade: (1) New Figure 1, trees reported (more than 8,000 in 2024; about 60,000 and more than 57,000 by end-2025) against the five-year window of pledge 305 (75% elapsed by end-2025; the 30 May 2026 election at 84%), with shrubs and vouchers kept out; it replaces the Section 2 tiles. (2) Searched for a count after the 30 May 2026 election (Project Green’s news to 5 October 2026; web searches): none found. (3) New sub-claim table in Section 4 (A–D); TL;DR, a tile, verdict box, cover note, flyer and claim.yml updated. Version and date added to the cover. Cover, page footer and flyer: “pending right of reply” → “right of reply not sought”, matching the text. Maintainer decision (5 Oct 2026): pledge delivery rated separately as Not substantiated; overall verdict unchanged.. CC-010, Land &amp; Trees; verdict so far: Largely supported (draft, right of reply not sought).</summary>
  </entry>
  <entry>
    <id>tag:leandergrech.github.io,2026:mizien:CC-010:2026-10-05:evidence-reviewed</id>
    <title>CC-010 Tree-planting counts: Evidence reviewed</title>
    <updated>2026-10-05T12:00:00Z</updated>
    <link rel="alternate" type="text/html" href="https://leandergrech.github.io/Mizien/claims/CC-010/"/>
    <summary type="text">Evidence reviewed. CC-010, Land &amp; Trees; verdict so far: Largely supported (draft, right of reply not sought).</summary>
  </entry>
  <entry>
    <id>tag:leandergrech.github.io,2026:mizien:CC-010:2026-10-05:version-1-1-corrections:corrections-the-pledge-was-framed-as-open-until-2027-it-now-records-that-the-legislature-ended-with-the-snap-general-election-of-30-may-2026-8-and-that-about-75-of-the-five-year-period-had-passed-by-end-2025-against-about-60-of-the-trees-reported-the-2027-deadline-tile-is-replaced-added-labours-own-2026-manifesto-count-more-than-57-000-trees-for-2022-2025-9-alongside-the-ministers-60-000-updated-the-voucher-scheme-to-23-000-trees-in-vouchers-issued-by-13-may-2026-10-vouchers-are-not-trees-planted-cover-note-shortened-to-fit-italics-fixed-verdict-and-confidence-unchanged</id>
    <title>CC-010 Tree-planting counts: Version 1.1: corrections (Corrections: the pledge was framed as open until 2027; it now records that the legislature ended with the snap general election of 30 May 2026 [8] and that about 75% of the five-year period had passed by end-2025, against about 60% of the trees reported (the “2027 deadline” tile is replaced). Added Labour&#39;s own 2026 manifesto count, more than 57,000 trees for 2022–2025 [9], alongside the Minister&#39;s ~60,000. Updated the voucher scheme to 23,000 trees in vouchers issued by 13 May 2026 [10]; vouchers are not trees planted. Cover note shortened to fit; italics fixed. Verdict and confidence unchanged.)</title>
    <updated>2026-10-05T12:00:00Z</updated>
    <link rel="alternate" type="text/html" href="https://leandergrech.github.io/Mizien/claims/CC-010/"/>
    <summary type="text">Version 1.1: corrections: Corrections: the pledge was framed as open until 2027; it now records that the legislature ended with the snap general election of 30 May 2026 [8] and that about 75% of the five-year period had passed by end-2025, against about 60% of the trees reported (the “2027 deadline” tile is replaced). Added Labour&#39;s own 2026 manifesto count, more than 57,000 trees for 2022–2025 [9], alongside the Minister&#39;s ~60,000. Updated the voucher scheme to 23,000 trees in vouchers issued by 13 May 2026 [10]; vouchers are not trees planted. Cover note shortened to fit; italics fixed. Verdict and confidence unchanged.. CC-010, Land &amp; Trees; verdict so far: Largely supported (draft, right of reply not sought).</summary>
  </entry>
  <entry>
    <id>tag:leandergrech.github.io,2026:mizien:CC-010:2026-10-03:version-1-0-first-issue:first-issue-right-of-reply-not-sought-at-the-maintainers-direction</id>
    <title>CC-010 Tree-planting counts: Version 1.0: first issue (First issue. Right of reply not sought, at the maintainer&#39;s direction.)</title>
    <updated>2026-10-03T12:00:00Z</updated>
    <link rel="alternate" type="text/html" href="https://leandergrech.github.io/Mizien/claims/CC-010/"/>
    <summary type="text">Version 1.0: first issue: First issue. Right of reply not sought, at the maintainer&#39;s direction.. CC-010, Land &amp; Trees; verdict so far: Largely supported (draft, right of reply not sought).</summary>
  </entry>
  <entry>
    <id>tag:leandergrech.github.io,2026:mizien:CC-011:2026-10-02:version-1-0-first-issue:first-issue-covering-two-pledges-labour-s-ten-minute-green-space-and-the-pn-s-net-zero-gozo-claims-restated-from-the-parties-own-texts-rather-than-news-summaries-draft-pending-right-of-reply</id>
    <title>CC-011 Ten minutes&#39; walk to green space: Version 1.0: first issue (First issue, covering two pledges (Labour’s ten-minute green space and the PN’s net-zero Gozo). Claims restated from the parties’ own texts rather than news summaries. Draft pending right of reply.)</title>
    <updated>2026-10-02T12:00:00Z</updated>
    <link rel="alternate" type="text/html" href="https://leandergrech.github.io/Mizien/claims/CC-011/"/>
    <summary type="text">Version 1.0: first issue: First issue, covering two pledges (Labour’s ten-minute green space and the PN’s net-zero Gozo). Claims restated from the parties’ own texts rather than news summaries. Draft pending right of reply.. CC-011, Governance &amp; Promises; pledge label so far: Not measurable (draft, pending right of reply).</summary>
  </entry>
  <entry>
    <id>tag:leandergrech.github.io,2026:mizien:CC-010:2025-12-31:pledge-label-off-track:100-000-trees-in-the-next-five-years</id>
    <title>CC-010 Tree-planting counts: Pledge label: Off track (100,000 trees in the next five years)</title>
    <updated>2025-12-31T12:00:00Z</updated>
    <link rel="alternate" type="text/html" href="https://leandergrech.github.io/Mizien/claims/CC-010/"/>
    <summary type="text">Pledge label: Off track: 100,000 trees in the next five years. CC-010, Land &amp; Trees; verdict so far: Largely supported (draft, right of reply not sought).</summary>
  </entry>

</feed>
